Find a TenderClosedTender notice
Published 2 Oct 2026, 11:27 BST

Official UK procurement notice

TD2340 - Framework for Highways Services

Official notice

Authority: Derby City Council (Local council)

Framework agreement11 lotsWorksCompetitive flexible procedureAbove threshold
Framework ceiling (notional)£107,325,000total for 11 lots · framework ceiling, not attributable revenue
Submissions closed 2 Nov 2026
Lots 11see the lot list below
Framework period 4 yrsends 30 Apr 2031 · extension options published · starts 1 May 2027
Notice summaryFrom the published notice

The Council is seeking to establish a multi-supplier Highways Framework Agreement to support the delivery of highway maintenance, improvement, construction, specialist services, materials supply, plant hire and associated activities across the highway network and related infrastructure. The Framework will provide a compliant and flexible route to market for planned and reactive works and services and will be divided into the following 11 lots: Should additional requirements arise as a result of LGR, the total estimated Framework value may increase to a maximum of £107,325,000 million EX VAT. The Council will also ask scored and weighted questions to arrive at a shortlist of a maximum four highest scoring suppliers for each lot to take to Stage 2. Published lot titles: Road Markings & High Friction Surfacing; Road Restraint Systems; Temporary Traffic Management; Traffic Signals; Multi-Disciplined; Carriageway Maintenance; Carriageway and Footway Surface Treatments; Hire of Equipment…

What is being bought11 lots · detail below

Published requirement description

The Council is seeking to establish a multi-supplier Highways Framework Agreement to support the delivery of highway maintenance, improvement, construction, specialist services, materials supply, plant hire and associated activities across the highway network and related infrastructure.

The Framework will provide a compliant and flexible route to market for planned and reactive works and services and will be divided into the following 11 lots:

Lot 1 - Road Markings & High Friction Surfacing

Lot 2 - Road Restraint Systems

Lot 3 - Temporary Traffic Management

Lot 4 - Traffic Signals

Lot 5 - Multi-Disciplined

Lot 6 - Carriageway Maintenance

Lot 7 - Carriageway and Footway Surface Treatments

Lot 8 - Hire of Equipment (with/without Operators)

Lot 9 - Haulage with Driver

Lot 10 - Supply of Asphalt

Lot 11 - Highways Resource Support

The Framework has an estimated core value of £71,550,000 million Ex VAT over its full term. In anticipation of Local Government Reorganisation (LGR), the Council reserves the right to vary the scope, value and volume of services procured through the Framework. Should additional requirements arise as a result of LGR, the total estimated Framework value may increase to a maximum of £107,325,000 million EX VAT.

Stage 1 - Invitation to Participate

This will be the PSQ stage that suppliers complete such as their economic and financial standing and their technical/ professional ability. The Council will also ask scored and weighted questions to arrive at a shortlist of a maximum four highest scoring suppliers for each lot to take to Stage 2.

Stage 2 - Invitation to Submit Final Tenders

Suppliers successful from Stage 1 will be invited to submit their tenders which will consist of their pricing, quality and social value methodologies.

The values attributed to individual lots are indicative only and do not represent any guarantee of expenditure. Actual spend may vary between lots depending on operational requirements, available funding and any changes arising from LGR.

Call-off contracts may include highway maintenance works, specialist highway services, traffic management, supply of materials, plant and equipment hire, haulage services and resource support. Requirements may range from small-scale reactive works to larger planned maintenance and capital improvement schemes.

Appointment to the Framework does not guarantee any minimum value or volume of work. Call-off contracts may be awarded by direct award and/or further competition in accordance with the Framework terms and procurement documents.

  • The authority expects to re-tender this requirement around 1 May 2030, 23:59 BST.
  • How the procedure runs: This Invitation to Participate stage (Stage 1) includes a Procurement Specific Questionnaire (PSQ) , which all Bidders are required to complete and return. Stage 1 - Invitation to Participate This will be the PSQ stage that suppliers complete to be set up on the Central Digital Platform such as their economic and financial standing and their technical/ professional ability. The Council will also ask scored and weighted questions to arrive at a shortlist of a maximum of the four highest scoring suppliers for each lot to take to Stage 2. Stage 2 - Invitation to Submit Final Tenders Suppliers successful from Stage 1 will be invited to submit their tenders which will consist of their pricing, quality and social value methodologies.

CPV: Asphalt · Carriageway resurfacing works · Construction work · Construction work for highways, roads · Construction, foundation and surface works for highways, roads · Highway maintenance work · Hire of construction and civil engineering machinery and equipment with operator · Hire of goods-transport vehicles with driver · Paving and asphalting works · Road barriers · Road traffic-control equipment · Road-maintenance works · +1 more

Open work like this

This notice no longer takes bids · live search, filters set

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Framework period
4 yrs from 1 May 2027
Published description of the framework

Individual Call off Contracts will be awarded via the Framework in accordance with one of the following procedures

Direct Award (Basket of Rates)

Direct Award (Ranked Order)

Further Competition

Framework Providers will not be compelled to bid for all business offered via further competition. It is recognised that not all Call Off Contracts will necessarily suit every Framework Provider because of the type of services / works required.

Not all routes above are applicable to all lots

Individual Call off Contracts may be of any reasonable duration regardless of when they commenced, i.e., an individual call off contract may outlive the expiry of the Framework Lot itself. However, given the nature of the works being sourced, it is anticipated that the duration of most individual call off contracts will last no longer than one year.

The Council intends that all call-off competitions and other framework activities will be managed through its E-Procurement system.

Lots and requirements (11)Procurement structure

11 lots · all with a published value · evaluation weights differ by lot

Every one of these 2 lots carries the same published figure, £9,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Road Markings & High Friction Surfacing 4 yrsPublished value£1,425,000

Supply and installation of Road Markings, High Friction Surfacing and Road Studs.

The core value of this lot is £950,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £1,425,000.00 over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £1,425,000 exc. VAT · £1,710,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in the tender documents

  • Technical & professional ability

    As detailed in the tender documents

Lot #2Road Restraint Systems 4 yrsPublished value£750,000

Installation and maintenance of road restraint systems.

The core value of this lot is £500,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £750,000.over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £750,000 exc. VAT · £900,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #3Temporary Traffic Management 4 yrsPublished value£1,200,000

Provision of temporary traffic management for works and other third parties

The core value of this lot is £800,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £1,200,000.00 over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £1,200,000 exc. VAT · £1,440,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #4Traffic Signals 4 yrsceiling above

Traffic signals supply and installation including controller cabinets, poles, equipment, cabling, and detectors and maintenance.

The core value of this lot is £6,000,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £9,000,000.00 over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #5Multi-Disciplined 4 yrsPublished value£30,000,000

Multi-disciplinary highway works across Derby including improvement schemes, junction improvement schemes, road safety schemes, city centre improvements, maintenance and improvement of structures and drainage schemes. The contracts will cover construction activities but may also include design works.

The core value of this lot is £20,000,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £30,000,000 over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £30,000,000 exc. VAT · £36,000,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #6Carriageway Maintenance 4 yrsPublished value£36,000,000

Undertake carriageway maintenance to include planning, carriageway and footway surfacing, kerbing and ironworks.

The core value of this lot is £24,000,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £36,000,000 EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £36,000,000 exc. VAT · £43,200,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #7Carriageway and Footway Surface Treatments 4 yrsceiling above

Undertake surface dressing, micro asphalt, footway slurry sealing treatments, pre patching and ironworks to carriageways and footways.

The core value of this lot is £6,000,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £9,000,000 EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #8Hire of Equipment (with/without Operators) 4 yrsPublished value£3,900,000

Provide various handheld tools, self-drive plant and equipment, and operated equipment to complement existing Client workforces under the supervision of The Client’s workforce.

The core value of this lot is £2,600,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £3,900,000 EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £3,900,000 exc. VAT · £4,680,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #9Haulage with Driver 4 yrsPublished value£1,800,000

Provide operated hired vehicles to the Client’s in-house Highway Operations team so they can carry out a variety of civil engineering schemes across the city of Derby.

The core value of this lot is £1,200,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £1,800,000 EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £1,800,000 exc. VAT · £2,160,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #10Supply of Asphalt 4 yrsPublished value£9,450,000

Provide the supply of Rolled Asphalt, Asphalt Concrete (Coated Macadam) and Coated Chippings for collection and delivery.

The core value of this lot is £6,300,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £9,450,000EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £9,450,000 exc. VAT · £11,340,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

Lot #11Highways Resource Support 4 yrsPublished value£4,800,000

Provision of skilled and semi-skilled labour to complement existing workforces, sometimes at short notice, for completion of projects under the supervision of The Council’s workforce.

The core value of this lot is £3,200,000 EX VAT over the 4 year term.

The value plus any options (LGR) is £4,800,000 EX VAT over the 4 year term.

Contract period: 1 May 2027 – 30 Apr 2031 (4 yrs)Value: £4,800,000 exc. VAT · £5,760,000 inc. VAT
Delivery: East Midlands
Extensions: Local Government Reorganisation The Contracting Authority has identified Local Government Reorganisation (“LGR”) as a potential future event which may affect the delivery and/or administration of the Services during the Contract Term. LGR may result in changes to local government structures, administrative boundaries, functions, responsibilities, service delivery arrangements or the identity of the organisation responsible for the Services The Contract may therefore require modification as a consequence of LGR. Where permitted by the Procurement Act 2023, such modifications may include consequential changes to the scope, geographical coverage, volumes, service requirements, governance and reporting arrangements, and/or arrangements for the transfer of responsibility for the Services to a successor or reorganised local authority. Any modification will be limited to changes permitted under the Procurement Act 2023, including where applicable Schedule 8, and will not change the overall nature of the Contract. Local Government Reorganisation (LGR) proposals continue to be developed across a number of areas and may result in changes to council structures, service delivery arrangements, responsibilities and geographical coverage during the term of this contract. Whilst the final outcome and implementation arrangements remain subject to government decisions and further local development, it is possible that the effects of LGR could lead to changes in service demand and/or the need to extend provision to additional areas, organisations or client groups. The Authority therefore reserves the right to vary the scope and value of the contract to reflect any future changes arising from LGR. For further information, please refer to the Government's Local Government Reorganisation updates: https://www.gov.uk/government/collections/local-government-reorganisation-policy-and-programme-updates The core framework value across all lots is estimated at £72,000,000 (Excluding VAT) based on current known service requirements. Due to the potential impact of the Local Government Reorganisation this value may rise. Therefore, the total contract value may rise to £108,000,000 (Excluding VAT) £129,600,000 (Including VAT). These figures are estimations and due to only being in the early stages of the process the Council cannot give any commitment on these figures but would like to build scope into the Contract should the need arise. Bidders should take this identified risk into account when preparing their Tender and pricing. Innovation and Product Development The Council recognises that products, materials, technologies, techniques and methods of delivery within the scope of this Framework may develop during the Framework Term. The Framework is intended to accommodate appropriate developments and innovations within the existing scope of each Lot. Contractors and suppliers may therefore propose new or improved products, materials, technologies, techniques or solutions where these: Fall within the scope and intended purpose of the relevant Lot; meet or exceed the applicable technical, performance, safety and regulatory requirements; represent an improvement or development of the type of works, products, materials, technology or solutions contemplated by the Framework; do not materially alter the overall nature or scope of the Framework or the relevant Lot; and can be procured through the Framework in accordance with the Procurement Act 2023. The Council may consider such developments when undertaking Call-Offs under the Framework, where permitted by the applicable Call-Off procedure. The inclusion of this provision does not guarantee that any innovative product, technology or solution will be purchased by the Council. A contractor/supplier introducing a new or innovative product or solution shall not acquire an exclusive right to supply that product or solution through the Framework. Other contractors/suppliers shall be able to offer equivalent or alternative solutions. These can only be accessed via the use of a further competition.Second stage: 4–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As per tender documents

  • Technical & professional ability

    As per tender documents

What it takes to win
i

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
What this means for your bid
  • Price carries 40–70 points depending on the lot. Read the split per lot below.
  • “TD2340 - Framework for Highways Services” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Yes · next expected 1 May 2030
First published
2 Oct 2026, 11:27 BST
Last source update
2 Oct 2026, 11:27 BST
Award evaluation window
Submission end – 1 Dec 2026
Authority reference
TD2340
FTS notice number
2026/S 000-093228
Latest notice
Tender notice (UK4)
Classification (CPV)
AsphaltCarriageway resurfacing worksConstruction workConstruction work for highways, roadsConstruction, foundation and surface works for highways, roadsHighway maintenance workHire of construction and civil engineering machinery and equipment with operatorHire of goods-transport vehicles with driverPaving and asphalting worksRoad barriers
+3 moreRoad traffic-control equipmentRoad-maintenance works
Delivery area
East Midlands (UKF11)
Official registry OCID
ocds-h6vhtk-077f75 Find a Tender
How it runs

This Invitation to Participate stage (Stage 1) includes a Procurement Specific Questionnaire (PSQ) , which all Bidders are required to complete and return.

Stage 1 - Invitation to Participate

This will be the PSQ stage that suppliers complete to be set up on the Central Digital Platform such as their economic and financial standing and their technical/ professional ability. The Council will also ask scored and weighted questions to arrive at a shortlist of a maximum of the four highest scoring suppliers for each lot to take to Stage 2.

Stage 2 - Invitation to Submit Final Tenders

Suppliers successful from Stage 1 will be invited to submit their tenders which will consist of their pricing, quality and social value methodologies.

How it was run

Official notice
Run through: Panacea · Who buys & how to bid on Panacea
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free
Requests to participate (first stage)
2 Nov 2026, 12:00 GMT
Appointment period ends
2 Nov 2026, 12:00 GMT
Clarification deadline
20 Oct 2026, 17:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

2 Oct 2026 → 1 May 2027 · 5 dates
  1. Tender notice published45 days ago
    2 Oct 2026, 11:27 BST
  2. Clarification questions by26 days ago
    20 Oct 2026, 17:00 BST
  3. Admission / appointment period ends14 days ago · period end, not a bid countdown
    2 Nov 2026, 12:00 GMT
  4. Today
    16 Nov 2026
  5. Award decision expected byin 15 days
    1 Dec 2026, 23:59 GMT
  6. Contract startsin 165 days
    1 May 2027

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    2 Oct 2026, 11:27 BST
    UK4

Contracting authority & participating public bodies

Derby City Council

Contracting authorityPublic authority - sub-central government GB-PPON: PQVM-1383-ZBXP The Council House, Corporation Street, Derby, East Midlands, DE1 2FSContact name, email

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: This procurement will be undertaken through a two-stage process. At Stage 1, suppliers are invited to express interest and/or submit responses to the selection stage requirements. Further procurement documents, including detailed specifications, pricing information and award criteria, will be issued to suppliers progressing to Stage 2.

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender