Supply & Delivery of PLC, HMI, SCADA and Industrial Networking Equipment
Command
control
communication and computer systems
+5 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: UNITED UTILITIES WATER LIMITED: "Supply & Delivery of PLC, HMI, SCADA and Industrial Networking Equipment". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | UNITED UTILITIES WATER LIMITED | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: UNITED UTILITIES WATER LIMITED
Market Analytics
Derived from OCDS awards & bid statistics
Published history for UNITED UTILITIES WATER LIMITED. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 3 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityUNITED UTILITIES WATER LIMITED | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSFramework | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published10 Feb 2021, 15:14 GMT | Last source update10 Feb 2021, 15:14 GMT | Recurring procurementNot published |
ClassificationCommand, control, communication and computer systems, Industrial process control equipment, Industrial process control equipment and remote-control equipment, Instrumentation and control equipment, Scada or equivalent system, Telemetry and control equipment | ||
Delivery area | ||
OCIDocds-h6vhtk-029212 | ||
What is being bought
The requirement is to supply a range of site based hardware & software supported by a supervisory control and data acquisition platform to support the United Utilities Wholesale business and its need to automate, monitor &control.
- Local Automation PLC/HMI Hardware & Software
- SCADA Software - Supervisory Control Software
- SCADA Systems Hardware - Servers & PLC's
What changed
From the official release history
- Status changed to complete
10 Feb 2021, 15:14 GMT - Official notice release published
10 Feb 2021, 15:14 GMT - Buyer information updated
10 Feb 2021, 15:14 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedStatus not publishedPublished valueNot publishedThe contractual arrangement for supplies will include: - Local Automation PLC/HMI Hardware & Software - SCADA Software - Supervisory Control Software - SCADA Systems Hardware - Servers & PLC's The contractual arrangement for services will include: - Pre and post sales application support - Technical support and training - Engineering software licences. - Supply of hardware and software compliant with the BS EN 62443 Standard for Cyber Security and represent best practice with regards to the NIS Directive - Associated Spares - Field Services In delivering the supplies under this contractual agreement, it is a requirement that the Supplier shall comply with the relevant technical standards which will be detailed within the agreement. With regards to the hardware and software (i.e. supplies), these shall be required by a number of third party routes, including but not limited to: - UU Internal teams - UU Framework Systems Integrators working for UU's delivery partners - Maintenance delivery partners - Construction delivery partners - Design & Build contractors Additional information: Type of procedure Negotiated procedure without prior call for competition Additional deliveries by the original supplier ordered under the strict conditions stated in the directive Explanation: United Utilities the contracting entity, 90% of its operational sites are controlled, monitored and automated using Siemens S7 PLCs and WinCC SCADA software and the next investment programme calls for circa 2% of its PLC/SCADA to be replaced. Awarding the PLC/SCADA contract to any supplier other than the incumbent will re-introduce 'Islands of Automation' onto our sites. This introduces numerous potential issues such as: - Single Points of Failure; - Duplication of both tasks and data; - More complex designs; - Lengthier troubleshooting; and - is generally and much more inefficient way to automate a site. At a site level United Utilities has mostly eliminated this issue, to introduce differing technology (with limited to no interconnectivity) to these sites would be to reintroduce issues such as the above. An alternative to introducing Islands of Automation would be to replace all hardware and software on a site that is introducing new hardware. This would require software to be reverse engineered and redesigned in a way to work on the new platform and then being re-commissioned. Independent third parties have provided proposals for a full PLC replacement project (using non incumbent technology), based on a typical UU Waste Water plant size using the above scenario for verification. The technical complexity (design, coding and testing effort required) to achieve this, when compared to implementing an additional PLC onto a site using the incumbent's technology, was found to be a ratio of 11:1. The Framework was last tendered in 2009, with minor amendments to scope and terms negotiated with the successful supplier, (Siemens PLC), as part of the strategy for Kit Framework awards for AMP6 in 2015. Prior to 2009, Siemens were also the incumbent supplier for these products and services and have been the UU SCADA platform provider since 2004 The Kit Framework is still in place with Siemens PLC until Sept 2020, with no further extension options under the current arrangement which has now expired. United Utilities conducted stakeholders meetings and agreement sought that confirm the optimum solution would be to re-negotiate with the current incumbent, there is a need to justify and confirm the disproportionality of re-tendering v transition costs, i.e. the cost of changing asset base, associated protocols, training material, maintenance regimes, spares and knowledge etc., should the solution provider change. United Utilities conclusion is that the significant extra technical steps required to transition to a change of supplier would oblige the utility to acquire supplies having different technical characteristics which would result in incompatibility or disproportionate technical difficulties in operation and maintenance. It is therefore, necessary to conduct a negotiated procedure without prior call for competition, as highlighted above United Utilities have acted in good faith prior to coming to this decision based on the due diligence that has been conducted.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
10 Feb 2021, 15:14 GMT - Award active
Not published · Not published - Contract active
Signed 10 Feb 2021, 00:00 GMT · £8,000,000
Commercial outcome and competition
Awards Siemens Plc Not published · Not published · active |
Contracts Supply & Delivery of PLC, HMI & SCADA and Industrial Networking Equipment £8,000,000 · signed 10 Feb 2021, 00:00 GMT · active |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
UNITED UTILITIES WATER LIMITED
Contracting authority GB-FTS-5256Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleUnited Utilities the contracting entity, 90% of its operational sites are controlled, monitored and automated using Siemens S7 PLCs and WinCC SCADA software and the next investment programme calls for circa 2% of its PLC/SCADA to be replaced. Awarding the PLC/SCADA contract to any supplier other than the incumbent will re-introduce 'Islands of Automation' onto our sites.
This introduces numerous potential issues such as:
- Single Points of Failure;
- Duplication of both tasks and data;
- More complex designs;
- Lengthier troubleshooting; and
- is generally and much more inefficient way to automate a site.
At a site level United Utilities has mostly eliminated this issue, to introduce differing technology (with limited to no interconnectivity) to these sites would be to reintroduce issues such as the above.
An alternative to introducing Islands of Automation would be to replace all hardware and software on a site that is introducing new hardware. This would require software to be reverse engineered and redesigned in a way to work on the new platform and then being re-commissioned.
Independent third parties have provided proposals for a full PLC replacement project (using non incumbent technology), based on a typical UU Waste Water plant size using the above scenario for verification. The technical complexity (design, coding and testing effort required) to achieve this, when compared to implementing an additional PLC onto a site using the incumbent's technology, was found to be a ratio of 11:1.
The Framework was last tendered in 2009, with minor amendments to scope and terms negotiated with the successful supplier, (Siemens PLC), as part of the strategy for Kit Framework awards for AMP6 in 2015.
Prior to 2009, Siemens were also the incumbent supplier for these products and services and have been the UU SCADA platform provider since 2004
The Kit Framework is still in place with Siemens PLC until Sept 2020, with no further extension options under the current arrangement which has now expired.
United Utilities conducted stakeholders meetings and agreement sought that confirm the optimum solution would be to re-negotiate with the current incumbent, there is a need to justify and confirm the disproportionality of re-tendering v transition costs, i.e. the cost of changing asset base, associated protocols, training material, maintenance regimes, spares and knowledge etc., should the solution provider change.
United Utilities conclusion is that the significant extra technical steps required to transition to a change of supplier would oblige the utility to acquire supplies having different technical characteristics which would result in incompatibility or disproportionate technical difficulties in operation and maintenance. It is therefore, necessary to conduct a negotiated procedure without prior call for competition, as highlighted above United Utilities have acted in good faith prior to coming to this decision based on the due diligence that has been conducted. |