← Back to search results

plannedFind a Tender · planning

Southern Integrated Delivery (SID) – Signalling and Track

Buyer: Network Rail Infrastructure Ltd →

BuyerNetwork Rail Infrastructure Ltd
Statusplanned
DeadlineNot published
Value£9,600,000,000
Published20 Dec 2021

What is being bought

Network Rail intends to establish a value driven, collaborative integrated relationship that will deliver our Control Period 7 (CP7) and potentially CP8 renewals portfolio. Network Rail Southern Region is seeking to achieve a step change in the way renewals are delivered on its network, making the most of modern methods of working and technology, collaboration and relationship focused contracting, and a portfolio focus to achieve the objectives of the Strategic Business Plan (SBP). Southern Integrated Delivery (SID) will be a fully integrated team based on 'Project 13' principles comprising all categories of railway assets: Signalling, Track, Buildings & Civils (B&C), Electrification and Plant (E&P) and Minor Works. The SID will bring together the strengths, capabilities, and knowledge of the supply chain and Network Rail and the scope is expected to include some or all of the following items: development, design, manufacture, supply, installation, integration, testing and commissioning of the Southern renewals work bank. These works will be undertaken on Kent Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route. The establishment of the SID will be undertaken in two tranches, the first of which was for the procurement of the Buildings & Civils and Electrification & Plant Business Partners for which the Contract Notice was published on 5th November 2021 (publication reference: 2021/S 000-027900). This notice pertains to the second tranche of procurement and is for the appointment of a Signalling Business Partner and a Track Business Partner.

Delivery location

UKI · UKJ · UKI · UKJ

Categories

Electrical installations for railways 34632300Train-monitoring system 34943000Works for complete or part construction and civil engineering work 45200000Railway construction works 45234100Demolition of tracks 45234113Railway signalling works 45234115Track construction works 45234116Level crossing construction works 45234140Electrical installation work 45310000Installation work of illumination and signalling systems 45316000Installation of signalling equipment 45316200Railway traffic control software package 48140000Architectural, construction, engineering and inspection services 71000000Engineering services 71300000Railway engineering services 71311230Engineering design services 71320000Construction-related services 71500000Railway-track inspection services 71631470Management-related services 79420000Construction work 45000000

Lot details

Signalling

Management and Delivery of Signalling works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route. The Signalling Integrator Business Partner will be required to undertake, without technical bias: • Early-stage development including all work types (renewals and refurbishment) typically GRIP 1 to 3 • Detailed design, construction and commissioning of all work types (GRIP 4 to 8) including targeted Interventions, Level Crossings and telecommunications associated with the signalling works, with the exception of major renewals as described below - which will be undertaken by Original Equipment Manufacturers (OEM) providers appointed within the Eco-system • Manage, coordinate and oversee the delivery for all appointed Eco-System OEM providers - who will be remitted to undertake major Signalling renewals, typically Re-Signalling, Re-lock, Re-control and ETCS schemes (typically GRIP 4 to 8 works, however where considered the optimum delivery strategy, the OEM may be appointed during the development phase) • Self-delivery of mid-size schemes/asset-life extension works. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time.

Statusplanned

Track

Management and Delivery of Track works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route. The scope will cover the site investigation, survey, design, planning and installation of track works, including the renewal, removal, refurbishment or new installation of plain line track, track drainage or switches and crossings by whatever means. This is including, but not limited to, the following associated track work items: Re-alignment, lifting and lowering of track, 3rd Rail, Remote condition monitoring, removal, replacement or new installation of lineside plant such as rail lubricators, fencing and rail crossings – road, access and pedestrian crossings, civils associated with these activities; cabinet bases, walkways, troughing routes, under track crossings, platform works. This notice also includes the following standalone items, i.e. not in association with track works: Track drainage renewal, removal, refurbishment or new installation, track bed stabilisation – works to track formation and sub-structure, rail crossings – road, access and pedestrian crossings and associated minor signalling and telecoms work. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time.

Statusplanned

What is included

ItemCategoryQuantity
3Electrical installations for railways, Train-monitoring system, Works for complete or part construction and civil engineering work, Railway construction works, Railway signalling works, Level crossing construction works, Installation work of illumination and signalling systems, Installation of signalling equipment, Railway traffic control software package, Architectural, construction, engineering and inspection services, Engineering services, Railway engineering services, Engineering design services, Construction-related services, Management-related servicesNot published
4Train-monitoring system, Works for complete or part construction and civil engineering work, Railway construction works, Demolition of tracks, Track construction works, Level crossing construction works, Electrical installation work, Architectural, construction, engineering and inspection services, Engineering services, Railway engineering services, Engineering design services, Construction-related services, Railway-track inspection services, Management-related servicesNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 34. The category anchor is Electrical installations for railways (34632300); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 344,5603 median · 24 average (1,842 of 4,560 with a bid count)3.7 average (2,058 of 4,560 with named award suppliers)Not published
Same buyer334 median · 4 average (3 of 33 with a bid count)1 average (4 of 33 with named award suppliers)Not published
Delivery region: UKI2465 median · 22 average (69 of 246 with a bid count)4.6 average (84 of 246 with named award suppliers)Not published
Similar published value (0.5×–2×)10Not publishedNot publishedNot published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-0303e2
Latest release ID031851-2021
Latest release timestampMon Dec 20 2021 22:45:06 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusplanned
Procurement methodNot published
Procurement method detailsNot published
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0025
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender value£9,600,000,000
Tender lots in source2
Tender items in source2
Tender documents in source0
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
20 Dec 2021planning031851-2021

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "031851-2021",
  "tag": [
    "planning"
  ],
  "date": "2021-12-20T22:45:06Z",
  "ocid": "ocds-h6vhtk-0303e2",
  "buyer": {
    "id": "GB-FTS-448",
    "name": "Network Rail Infrastructure Ltd"
  },
  "tender": {
    "id": "ocds-h6vhtk-0303e2",
    "lots": [
      {
        "id": "3",
        "title": "Signalling",
        "status": "planned",
        "description": "Management and Delivery of Signalling works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.\nThe Signalling Integrator Business Partner will be required to undertake, without technical bias: \n•\tEarly-stage development including all work types (renewals and refurbishment) typically GRIP 1 to 3\n•\tDetailed design, construction and commissioning of all work types (GRIP 4 to 8) including targeted Interventions, Level Crossings and telecommunications associated with the signalling works, with the exception of major renewals as described below - which will be undertaken by Original Equipment Manufacturers (OEM) providers appointed within the Eco-system\n•\tManage, coordinate and oversee the delivery for all appointed Eco-System OEM providers - who will be remitted to undertake major Signalling renewals, typically Re-Signalling, Re-lock, Re-control and ETCS schemes (typically GRIP 4 to 8 works, however where considered the optimum delivery strategy, the OEM may be appointed during the development phase)\n•\tSelf-delivery of mid-size schemes/asset-life extension works. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time."
      },
      {
        "id": "4",
        "title": "Track",
        "status": "planned",
        "description": "Management and Delivery of Track works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.  \nThe scope will cover the site investigation, survey, design, planning and installation of track works, including the renewal, removal, refurbishment or new installation of plain line track, track drainage or switches and crossings by whatever means. This is including, but not limited to, the following associated track work items: Re-alignment, lifting and lowering of track, 3rd Rail, Remote condition monitoring, removal, replacement or new installation of lineside plant such as rail lubricators, fencing and rail crossings – road, access and pedestrian crossings, civils associated with these activities; cabinet bases, walkways, troughing routes, under track crossings, platform works.\nThis notice also includes the following standalone items, i.e. not in association with track works: Track drainage renewal, removal, refurbishment or new installation, track bed stabilisation – works to track formation and sub-structure, rail crossings – road, access and pedestrian crossings and associated minor signalling and telecoms work. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time."
      }
    ],
    "items": [
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKI"
          },
          {
            "region": "UKJ"
          }
        ],
        "additionalClassifications": [
          {
            "id": "34632300",
            "scheme": "CPV",
            "description": "Electrical installations for railways"
          },
          {
            "id": "34943000",
            "scheme": "CPV",
            "description": "Train-monitoring system"
          },
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45234100",
            "scheme": "CPV",
            "description": "Railway construction works"
          },
          {
            "id": "45234115",
            "scheme": "CPV",
            "description": "Railway signalling works"
          },
          {
            "id": "45234140",
            "scheme": "CPV",
            "description": "Level crossing construction works"
          },
          {
            "id": "45316000",
            "scheme": "CPV",
            "description": "Installation work of illumination and signalling systems"
          },
          {
            "id": "45316200",
            "scheme": "CPV",
            "description": "Installation of signalling equipment"
          },
          {
            "id": "48140000",
            "scheme": "CPV",
            "description": "Railway traffic control software package"
          },
          {
            "id": "71000000",
            "scheme": "CPV",
            "description": "Architectural, construction, engineering and inspection services"
          },
          {
            "id": "71300000",
            "scheme": "CPV",
            "description": "Engineering services"
          },
          {
            "id": "71311230",
            "scheme": "CPV",
            "description": "Railway engineering services"
          },
          {
            "id": "71320000",
            "scheme": "CPV",
            "description": "Engineering design services"
          },
          {
            "id": "71500000",
            "scheme": "CPV",
            "description": "Construction-related services"
          },
          {
            "id": "79420000",
            "scheme": "CPV",
            "description": "Management-related services"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UKI"
          },
          {
            "region": "UKJ"
          }
        ],
        "additionalClassifications": [
          {
            "id": "34943000",
            "scheme": "CPV",
            "description": "Train-monitoring system"
          },
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45234100",
            "scheme": "CPV",
            "description": "Railway construction works"
          },
          {
            "id": "45234113",
            "scheme": "CPV",
            "description": "Demolition of tracks"
          },
          {
            "id": "45234116",
            "scheme": "CPV",
            "description": "Track construction works"
          },
          {
            "id": "45234140",
            "scheme": "CPV",
            "description": "Level crossing construction works"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          },
          {
            "id": "71000000",
            "scheme": "CPV",
            "description": "Architectural, construction, engineering and inspection services"
          },
          {
            "id": "71300000",
            "scheme": "CPV",
            "description": "Engineering services"
          },
          {
            "id": "71311230",
            "scheme": "CPV",
            "description": "Railway engineering services"
          },
          {
            "id": "71320000",
            "scheme": "CPV",
            "description": "Engineering design services"
          },
          {
            "id": "71500000",
            "scheme": "CPV",
            "description": "Construction-related services"
          },
          {
            "id": "71631470",
            "scheme": "CPV",
            "description": "Railway-track inspection services"
          },
          {
            "id": "79420000",
            "scheme": "CPV",
            "description": "Management-related services"
          }
        ]
      }
    ],
    "title": "Southern Integrated Delivery (SID) – Signalling and Track",
    "value": {
      "amount": 9600000000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "lotDetails": {
      "maximumLotsAwardedPerSupplier": 1
    },
    "description": "Network Rail intends to establish a value driven, collaborative integrated relationship that will deliver our Control Period 7 (CP7) and potentially CP8 renewals portfolio.\nNetwork Rail Southern Region is seeking to achieve a step change in the way renewals are delivered on its network, making the most of modern methods of working and technology, collaboration and relationship focused contracting, and a portfolio focus to achieve the objectives of the Strategic Business Plan (SBP).\nSouthern Integrated Delivery (SID) will be a fully integrated team based on 'Project 13' principles comprising all categories of railway assets: Signalling, Track, Buildings & Civils (B&C), Electrification and Plant (E&P) and Minor Works. The SID will bring together the strengths, capabilities, and knowledge of the supply chain and Network Rail and the scope is expected to include some or all of the following items: development, design, manufacture, supply, installation, integration, testing and commissioning of the Southern renewals work bank.\nThese works will be undertaken on Kent Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.\nThe establishment of the SID will be undertaken in two tranches, the first of which was for the procurement of the Buildings & Civils and Electrification & Plant Business Partners for which the Contract Notice was published on 5th November 2021 (publication reference: 2021/S 000-027900). This notice pertains to the second tranche of procurement and is for the appointment of a Signalling Business Partner and a Track Business Partner.",
    "communication": {
      "futureNoticeDate": "2022-01-31T00:00:00Z"
    },
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-448",
      "name": "Network Rail Infrastructure Ltd",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "postalCode": "NW1 2DN",
        "countryName": "United Kingdom",
        "streetAddress": "1 Eversholt Street"
      },
      "details": {
        "url": "http://www.networkrail.co.uk",
        "buyerProfile": "http://www.networkrail.co.uk",
        "classifications": [
          {
            "id": "RAILWAY_SERVICES",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Railway services"
          }
        ]
      },
      "identifier": {
        "legalName": "Network Rail Infrastructure Ltd"
      },
      "contactPoint": {
        "name": "Matthew McCarty",
        "email": "Matthew.Mccarty@networkrail.co.uk",
        "telephone": "+44 7701060358"
      }
    }
  ],
  "language": "en",
  "description": "It is envisaged that all appointed members of the SID will initially sign into a development phase agreement which is scheduled to commence in January 2023 and run up until April 2024. Following which, all Partners will sign into a multi-party SID Agreement based on an NR21 alliance form of contract. The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. Options to enact the break clause for Control Period 8 (CP8) will be subject to performance and funding approval at the time.\nThe value stated in Section II.1.5 is an estimated overall value of the CP7 and CP8 renewals portfolio across the initial period assuming the break clause between CP7 and CP8 is not used. Whilst Network Rail has some understanding of the value of the CP7 Renewals portfolio, due to the way Enhancement schemes are funded, the value of Enhancements is purely indicative and subject to change. For the purposes of valuing this forthcoming opportunity, Network Rail has assumed that the volume of work delivered within CP8 is aligned with CP7 current estimates. Recognising these constraints, it is estimated that the total value of the SID may be in the region of £4.7 billion - £9.6 billion.\nOf these estimates it is anticipated that Buildings and Civils constitutes 30% - 45%, Track 15% - 25%, Signalling 5% - 15%, Electrification and Plant 5% -10% whilst Minor Works is estimated to constitute 20%- 30% of the overall estimated value.\nHowever, given the uncertainty over volumes and funding commitments, the overall value of this opportunity may vary and therefore may be higher or lower than this range.\nApplicants will have the option to bid for both Lot 3 – Signalling and Lot 4 – Track. However, Network Rail intends to restrict the number of Lots an applicant may be awarded under this Procurement Event (and the number of roles) to a maximum of one.\nThis principle will also apply to the appointment of all ongoing procurements activities pertaining to the appointment of Business Partners within the SID; the number of places an economic operator is eligible to be awarded across Buildings & Civils, Electrification & Plant, Track and Signalling will be restricted to one. This is because all Business partners under the SID will be party to the same contract and Network Rail does not consider that optimal operation of the SID will be achieved if an economic operator holds more than one of the key Partner roles.\nTo allow potential suppliers to understand the scope and requirements of this agreement, Network Rail intends to host a virtual market briefing event in which interested parties will be provided an overview of the procurement event and on the forthcoming procurement process. The event will take place on Thursday 20th January 2022, from 10.00 to 12:00 (GMT). To register for the event or for details of the presentation, email your name, organisation and contact number to: - SouthernCP7Delivery@NetworkRail.co.uk no later than Thursday 13th January 2022. Please entitle your email \"Southern Integrated Delivery (SID) - Market Briefing – Signalling & Track\". Formal Invites for the market briefing will be issued between Friday 14th and Wednesday 19th January 2022.",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
20 Dec 2021 · 031851-2021 · planning
{
  "id": "031851-2021",
  "tag": [
    "planning"
  ],
  "date": "2021-12-20T22:45:06Z",
  "ocid": "ocds-h6vhtk-0303e2",
  "buyer": {
    "id": "GB-FTS-448",
    "name": "Network Rail Infrastructure Ltd"
  },
  "tender": {
    "id": "ocds-h6vhtk-0303e2",
    "lots": [
      {
        "id": "3",
        "title": "Signalling",
        "status": "planned",
        "description": "Management and Delivery of Signalling works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.\nThe Signalling Integrator Business Partner will be required to undertake, without technical bias: \n•\tEarly-stage development including all work types (renewals and refurbishment) typically GRIP 1 to 3\n•\tDetailed design, construction and commissioning of all work types (GRIP 4 to 8) including targeted Interventions, Level Crossings and telecommunications associated with the signalling works, with the exception of major renewals as described below - which will be undertaken by Original Equipment Manufacturers (OEM) providers appointed within the Eco-system\n•\tManage, coordinate and oversee the delivery for all appointed Eco-System OEM providers - who will be remitted to undertake major Signalling renewals, typically Re-Signalling, Re-lock, Re-control and ETCS schemes (typically GRIP 4 to 8 works, however where considered the optimum delivery strategy, the OEM may be appointed during the development phase)\n•\tSelf-delivery of mid-size schemes/asset-life extension works. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time."
      },
      {
        "id": "4",
        "title": "Track",
        "status": "planned",
        "description": "Management and Delivery of Track works on the Railway. These works will be undertaken within the Southern Region on Kent, Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.  \nThe scope will cover the site investigation, survey, design, planning and installation of track works, including the renewal, removal, refurbishment or new installation of plain line track, track drainage or switches and crossings by whatever means. This is including, but not limited to, the following associated track work items: Re-alignment, lifting and lowering of track, 3rd Rail, Remote condition monitoring, removal, replacement or new installation of lineside plant such as rail lubricators, fencing and rail crossings – road, access and pedestrian crossings, civils associated with these activities; cabinet bases, walkways, troughing routes, under track crossings, platform works.\nThis notice also includes the following standalone items, i.e. not in association with track works: Track drainage renewal, removal, refurbishment or new installation, track bed stabilisation – works to track formation and sub-structure, rail crossings – road, access and pedestrian crossings and associated minor signalling and telecoms work. Additional information: The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. The options to enact the break clause for Control Period 8 (CP8) will be subject to performance at the time."
      }
    ],
    "items": [
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKI"
          },
          {
            "region": "UKJ"
          }
        ],
        "additionalClassifications": [
          {
            "id": "34632300",
            "scheme": "CPV",
            "description": "Electrical installations for railways"
          },
          {
            "id": "34943000",
            "scheme": "CPV",
            "description": "Train-monitoring system"
          },
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45234100",
            "scheme": "CPV",
            "description": "Railway construction works"
          },
          {
            "id": "45234115",
            "scheme": "CPV",
            "description": "Railway signalling works"
          },
          {
            "id": "45234140",
            "scheme": "CPV",
            "description": "Level crossing construction works"
          },
          {
            "id": "45316000",
            "scheme": "CPV",
            "description": "Installation work of illumination and signalling systems"
          },
          {
            "id": "45316200",
            "scheme": "CPV",
            "description": "Installation of signalling equipment"
          },
          {
            "id": "48140000",
            "scheme": "CPV",
            "description": "Railway traffic control software package"
          },
          {
            "id": "71000000",
            "scheme": "CPV",
            "description": "Architectural, construction, engineering and inspection services"
          },
          {
            "id": "71300000",
            "scheme": "CPV",
            "description": "Engineering services"
          },
          {
            "id": "71311230",
            "scheme": "CPV",
            "description": "Railway engineering services"
          },
          {
            "id": "71320000",
            "scheme": "CPV",
            "description": "Engineering design services"
          },
          {
            "id": "71500000",
            "scheme": "CPV",
            "description": "Construction-related services"
          },
          {
            "id": "79420000",
            "scheme": "CPV",
            "description": "Management-related services"
          }
        ]
      },
      {
        "id": "4",
        "relatedLot": "4",
        "deliveryAddresses": [
          {
            "region": "UKI"
          },
          {
            "region": "UKJ"
          }
        ],
        "additionalClassifications": [
          {
            "id": "34943000",
            "scheme": "CPV",
            "description": "Train-monitoring system"
          },
          {
            "id": "45200000",
            "scheme": "CPV",
            "description": "Works for complete or part construction and civil engineering work"
          },
          {
            "id": "45234100",
            "scheme": "CPV",
            "description": "Railway construction works"
          },
          {
            "id": "45234113",
            "scheme": "CPV",
            "description": "Demolition of tracks"
          },
          {
            "id": "45234116",
            "scheme": "CPV",
            "description": "Track construction works"
          },
          {
            "id": "45234140",
            "scheme": "CPV",
            "description": "Level crossing construction works"
          },
          {
            "id": "45310000",
            "scheme": "CPV",
            "description": "Electrical installation work"
          },
          {
            "id": "71000000",
            "scheme": "CPV",
            "description": "Architectural, construction, engineering and inspection services"
          },
          {
            "id": "71300000",
            "scheme": "CPV",
            "description": "Engineering services"
          },
          {
            "id": "71311230",
            "scheme": "CPV",
            "description": "Railway engineering services"
          },
          {
            "id": "71320000",
            "scheme": "CPV",
            "description": "Engineering design services"
          },
          {
            "id": "71500000",
            "scheme": "CPV",
            "description": "Construction-related services"
          },
          {
            "id": "71631470",
            "scheme": "CPV",
            "description": "Railway-track inspection services"
          },
          {
            "id": "79420000",
            "scheme": "CPV",
            "description": "Management-related services"
          }
        ]
      }
    ],
    "title": "Southern Integrated Delivery (SID) – Signalling and Track",
    "value": {
      "amount": 9600000000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0025",
      "scheme": "CELEX"
    },
    "lotDetails": {
      "maximumLotsAwardedPerSupplier": 1
    },
    "description": "Network Rail intends to establish a value driven, collaborative integrated relationship that will deliver our Control Period 7 (CP7) and potentially CP8 renewals portfolio.\nNetwork Rail Southern Region is seeking to achieve a step change in the way renewals are delivered on its network, making the most of modern methods of working and technology, collaboration and relationship focused contracting, and a portfolio focus to achieve the objectives of the Strategic Business Plan (SBP).\nSouthern Integrated Delivery (SID) will be a fully integrated team based on 'Project 13' principles comprising all categories of railway assets: Signalling, Track, Buildings & Civils (B&C), Electrification and Plant (E&P) and Minor Works. The SID will bring together the strengths, capabilities, and knowledge of the supply chain and Network Rail and the scope is expected to include some or all of the following items: development, design, manufacture, supply, installation, integration, testing and commissioning of the Southern renewals work bank.\nThese works will be undertaken on Kent Sussex and Wessex routes, and will primarily be focused on the delivery of the renewals portfolio, however options will be included to enable enhancements also to be delivered, subject to capacity and where the SID is considered the optimum procurement route.\nThe establishment of the SID will be undertaken in two tranches, the first of which was for the procurement of the Buildings & Civils and Electrification & Plant Business Partners for which the Contract Notice was published on 5th November 2021 (publication reference: 2021/S 000-027900). This notice pertains to the second tranche of procurement and is for the appointment of a Signalling Business Partner and a Track Business Partner.",
    "communication": {
      "futureNoticeDate": "2022-01-31T00:00:00Z"
    },
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-448",
      "name": "Network Rail Infrastructure Ltd",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "postalCode": "NW1 2DN",
        "countryName": "United Kingdom",
        "streetAddress": "1 Eversholt Street"
      },
      "details": {
        "url": "http://www.networkrail.co.uk",
        "buyerProfile": "http://www.networkrail.co.uk",
        "classifications": [
          {
            "id": "RAILWAY_SERVICES",
            "scheme": "TED_CE_ACTIVITY",
            "description": "Railway services"
          }
        ]
      },
      "identifier": {
        "legalName": "Network Rail Infrastructure Ltd"
      },
      "contactPoint": {
        "name": "Matthew McCarty",
        "email": "Matthew.Mccarty@networkrail.co.uk",
        "telephone": "+44 7701060358"
      }
    }
  ],
  "language": "en",
  "description": "It is envisaged that all appointed members of the SID will initially sign into a development phase agreement which is scheduled to commence in January 2023 and run up until April 2024. Following which, all Partners will sign into a multi-party SID Agreement based on an NR21 alliance form of contract. The main SID agreement will be 10 years in duration and will commence in CP7 with the inclusion of a break clause prior to the commencement of CP8. Options to enact the break clause for Control Period 8 (CP8) will be subject to performance and funding approval at the time.\nThe value stated in Section II.1.5 is an estimated overall value of the CP7 and CP8 renewals portfolio across the initial period assuming the break clause between CP7 and CP8 is not used. Whilst Network Rail has some understanding of the value of the CP7 Renewals portfolio, due to the way Enhancement schemes are funded, the value of Enhancements is purely indicative and subject to change. For the purposes of valuing this forthcoming opportunity, Network Rail has assumed that the volume of work delivered within CP8 is aligned with CP7 current estimates. Recognising these constraints, it is estimated that the total value of the SID may be in the region of £4.7 billion - £9.6 billion.\nOf these estimates it is anticipated that Buildings and Civils constitutes 30% - 45%, Track 15% - 25%, Signalling 5% - 15%, Electrification and Plant 5% -10% whilst Minor Works is estimated to constitute 20%- 30% of the overall estimated value.\nHowever, given the uncertainty over volumes and funding commitments, the overall value of this opportunity may vary and therefore may be higher or lower than this range.\nApplicants will have the option to bid for both Lot 3 – Signalling and Lot 4 – Track. However, Network Rail intends to restrict the number of Lots an applicant may be awarded under this Procurement Event (and the number of roles) to a maximum of one.\nThis principle will also apply to the appointment of all ongoing procurements activities pertaining to the appointment of Business Partners within the SID; the number of places an economic operator is eligible to be awarded across Buildings & Civils, Electrification & Plant, Track and Signalling will be restricted to one. This is because all Business partners under the SID will be party to the same contract and Network Rail does not consider that optimal operation of the SID will be achieved if an economic operator holds more than one of the key Partner roles.\nTo allow potential suppliers to understand the scope and requirements of this agreement, Network Rail intends to host a virtual market briefing event in which interested parties will be provided an overview of the procurement event and on the forthcoming procurement process. The event will take place on Thursday 20th January 2022, from 10.00 to 12:00 (GMT). To register for the event or for details of the presentation, email your name, organisation and contact number to: - SouthernCP7Delivery@NetworkRail.co.uk no later than Thursday 13th January 2022. Please entitle your email \"Southern Integrated Delivery (SID) - Market Briefing – Signalling & Track\". Formal Invites for the market briefing will be issued between Friday 14th and Wednesday 19th January 2022.",
  "initiationType": "tender"
}