Official UK procurement notice
Sludge Treatment Services · UK public procurement notice
Authority: United Utilities Water Limited (Public body)
What is being bought
Published requirement description- United Utilities Water Ltd (UU) produces over 200,000 dry tonnes (tDS) of wastewater derived sludge per annum.
- Due to sludge growth and reconfiguration of our asset base we have a need for sludge treatment services in the North of our region.
- We have previously issued PINs and conducted market engagement for short term and strategic solutions for these treatment services.
- This has enabled us to define the strategic sludge treatment service we want to procure from the market, which is: to outsource 45,000 tDS of sludge treatment capacity for a period of 20 years for sludge arising in the North of our region.
- We will be hosting a supplier day in November to set out the details of the procurement and answer questions from potential suppliers.
Please see Complementary information section for more information.
CPV: Construction work · Construction works for sewage treatment plants, purification plants and refuse incineration plants · Electricity · Electricity, heating, solar and nuclear energy · Non-hazardous refuse and waste treatment and disposal services · Operation of a sewage plant · Petroleum products, fuel, electricity and other sources of energy · Refuse collection services · Refuse transport services · Sewage digesters · Sewage disposal services · Sewage plant equipment · +15 more
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 16 Oct 2023, 16:51 BST
- Last source update
- 16 Oct 2023, 16:51 BST
- FTS notice number
2023/S 000-030516- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-040c77Find a Tender
Publisher note: United Utilities Water Ltd (UU) produces over 200,000 dry tonnes (tDS) of wastewater derived sludge per annum. Due to sludge growth and reconfiguration of our asset base we have a need for sludge treatment services in the North of our region. We have previously issued PINs and conducted market engagement for short term and strategic solutions for these treatment services, which have enabled us to define the strategic sludge treatment service we want to procure from the market. We are looking to outsource the treatment of 45,000 tDS per year of sludge arising in the North of our region (Cumbria and Lancashire). The scope of the sludge treatment services we are procuring will be limited to the treatment of the raw sludge and the management of by-products from the treatment process. We are asking suppliers to provide this outsourced sludge treatment service on a £/tDS gate fee basis over a 20 year operational period, with suppliers providing the financing required. We want the operational period to commence before the end of AMP8. The sludge to be treated is derived from a range of Wastewater Treatment Works (WwTW) with sludge types including Primary sludge, Secondary sludge, and Co-settled sludge (mix of primary and secondary). The raw sludge is a mix of raw, thickened liquid and cake. The wastewater treatment processes vary and include biological and chemical phosphorus removal technologies. We want to give suppliers the flexibility to develop the most efficient solutions possible, therefore: 1. We will not specify the location or technology that the supplier must use. Suppliers can use their existing facilities, build new facilities, or use a combination of the two. 2. Whilst the supplier does not need to be co-located with our existing operations, they can use a plot within our Blackburn WwTW to develop a treatment facility. 3. We will deliver the raw sludge to the supplier and recycle BAS compliant digested sludges to land if an AD process is used. The cost of transport and recycling of sludges to land will be factored into the assessment of bids. 4. We are open to the supplier supplementing our sludge with other merchant feedstocks in order to achieve economies of scale. 5. We encourage suppliers that have solutions for a proportion of the total volume to work together to offer an aggregated service. Following closure of the PIN we will host a supplier day in November to provide more detail for interested parties. If you have experience in this area please provide as a minimum the following information and submit to [email protected] 1. Company Name 2. Contact details, • Location, telephone and e-mail address • Main point of contact and position in Company 3. Details of your company’s core skills in relation to the services outlined in the notice • Services offered • Example projects / services
How it was run
Official notice- Submission deadline
- —
Timeline
16 Oct 2023 → 2 Sept 2024 · 2 dates- Notice published16 Oct 2023, 16:51 BST
- Tender notice expected2 Sept 2024, 00:00 BST
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.