Find a Tender
planning
#h6vhtk-06f6cf
Published 10 Sept 2026, 13:26 BST
Official UK Procurement Procedure
Quarrying - North District
works
SME eligible
Below threshold
Demolition
site preparation and clearance work
Excavating and earthmoving work
+1 more
Published value
£2,400,000
Submission deadline
Open opportunity
Lots published
1
Contract duration
4 yrs
Electronic Sourcing Gateway:
Published portal
What is being bought & procurement scope
Procurement Scope & Specification
Executive Summary: Forestry Commission: "Quarrying - North District". Published status: planning. Published value: £2,400,000. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Official Requirement Description:
Quarrying works in the north of England (Northumberland) comprise extraction and processing of aggregate from 4 (maybe 5) hard rock quarries, including associated drilling and blasting works.
Materials are extracted in relatively small quantities and used in various Forestry England civil engineering applications, mostly for the construction and maintenance of forest roads for the purposes of facilitating timber harvesting. Quarrying operations are therefore undertaken in a number of specific locations, in close proximity to the point of use of the extracted materials. Typically, extraction of materials will take place over a period of a few weeks each year, with material then stockpiled within the quarry, or at other designated locations for use as and when needed.
This Framework will be divided in to two Lots:
1. Drilling and blasting
2 . Extraction and quarry development and crushing
Lot 1 - Drilling and blasting
The Supplier carries out all drilling and blasting operations, in accordance with the Quarries Regulations 1999 particularly Part V and the Explosives Regulations 2014 , and the quarry Health and Safety Document. Blasting activities typically take place at 2 to 5 sites per year, with tonnages between 20,000 and 35,000T per blast.
The Client (The Operator) will retain 8.1.(c) responsibilities during blasting operations. The supplier’s named individual will be appointed as the 8.1. (d) and the client will also appoint the supplier’s named individual as the Explosives Supervisor under regulation 25 of the Quarries Regulations for the duration of the Work Order.
This requires the Supplier to have capability in the following areas:
1. Provide suitably qualified, competent and qualified personnel to undertake the following duties.
Explosives Supervisor
Shotfirer
Driller
Blast Designer
Face profiler
Trainee Shotfirer (if required)
Handing of explosives
Transportation of explosives
Provide all required survey work relating to the blasting operation.
Provide all plant and equipment required including fuels, oils, transportation, explosives and accessories.
Lot 2 - Extraction and quarry development and crushing
The Supplier carries out all extraction and processing, in accordance with the Quarries Regulations 1999, and the quarry Health and Safety Document.
The Client (The Operator) will retain 8.1.(c) responsibilities during operations. The supplier’s named individual will be appointed as the 8.1. (d) deputy quarry manager to supervise the works for the duration of the Work Order.
The Client requires the Supplier to carry out the following services to facilitate the extraction and processing of aggregates at Forestry England quarries:
1. Removal of material from processed stockpiles and blast piles.
2. Excavation of raw materials
3. Processing of raw materials including crushing and screening.
4. Provision of stemming material and plant for movement and placement
5. Maintenance and reinstatement of quarry floor and safety features
6. Maintenance and reinstatement of egress and quarry roads, during quarrying operations
7. Crushing of as blasted material.
8. Loading of aggregate during quarry operations
9. Haulage of aggregate to forest locations
10. Daily inspections as required by the Quarries Regulations in accordance with the client’s requirements.
11. Soil and overburden excavation, haulage within the quarry and tip creation.
12. Restoration works.
Lots and requirements (1)
Procurement Structure
- Lot 1 · #1Individual lot title not publishedplanningPublished valueNot publishedThe source published no individual title or description for this lot.Contract period:2 Nov 2026 — 1 Nov 2030 (4 yrs)Eligibility:SME eligible
Qualification snapshot & criteria
Go / No-Go Decision Box
Evaluation weighting
Award criteria weighting not published in structured data — consult the tender pack documents.
Incumbent & Market Position
Top Retained Vendor (Authority Spend)Ashbrook Construction Services LimitedHolds 42.3% of historical attributable spend
Moderate ConcentrationEntry requirements & qualification
Turnover Benchmark
Insurance Commitments (No Upfront Purchase Needed)
Accreditations & Security Vetting
Contract Duration & Term OptionsExpected duration: 4 yrs
Published track record for Forestry Commission. These figures describe a rolling 24-month window, not a forecast of bids or a measure of buyer bias.
Avg price drop
Not availableEarly / insufficient sample
Competition Density
Not availableNo published reports
Supplier Concentration
Published spend
£2,361,400Historical spend
Typical award value
£48,809Robust (n=17)
Awarded spend by half-year
2024-H2
2025-H1
2025-H2
2026-H1
2026-H2
Methodology & coverage notes (18 active published awards)
Coverage: 18 active published awards; 0 bid reports (which may be per lot); 17 valued awards. Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Every figure carries an evidence level: Robust (5+ observations), Moderate (3–4), Indicative (1–2). Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers in this Category (CPV 45):
Supplier Name | Historic Awards | Attributable Value | Avg. Price Discount |
|---|---|---|---|
| Ashbrook Construction Services Limited | 1 win | £1,000,000 | No published budget |
| IRRIGATION CONTROL LIMITED | 1 win | £295,555 | No published budget |
| RTL UK Group Ltd | 1 win | £236,000 | No published budget |
| CLIXBY'S FORESTRY GROUND PREP LIMITED | 1 win | £166,225 | No published budget |
| UK Power Networks (Operations) Limited | 1 win | £124,746 | No published budget |
Sector Market Benchmark & Opportunity Radar
CPV 45 · UK Sector Analysis
Observed CPV-sector evidence
Suitable for SMEs
Prepared 10 Sept 2026, 15:09 BST
Observed CPV-sector evidence where it exists, with clearly labelled UK all-sector context for sparse fields; this is market context, not a bid forecast.
Median Winning Discount
0.3%
Typical Bids Received
4reported bids
Decision Velocity
~49 days
Notice Stability
Stable notice
Top Contenders in this Sector (CPV 45)
Supplier | Awards won | Total awarded value | Avg. winning discount |
|---|---|---|---|
MJ Church (Plant) LtdCRN: 1856955 | 4 contracts | £21,191,000,000 | At ceiling / not disclosed |
Morgan Sindall Construction and Infrastructure LtdCRN: PPZX-2842-HHPG | 113 contracts | £18,529,846,409 | At ceiling / not disclosed |
Kier ConstructionCRN: PYYQ-3271-CYND | 75 contracts | £15,595,703,176 | At ceiling / not disclosed |
Willmott Dixon Construction LtdCRN: PVYX-9246-LZYL | 53 contracts | £15,161,656,379 | At ceiling / not disclosed |
ILIOSCRN: 1157281 | 1 contract | £10,000,000,000 | At ceiling / not disclosed |
Wates Construction LimitedCRN: PHQT-5476-TZBR | 52 contracts | £9,923,245,228 | -0% below budget |
EQUANS Regeneration LimitedCRN: PDWQ-6852-QYVW | 145 contracts | £8,388,365,822 | At ceiling / not disclosed |
Mclaren Construction LimitedCRN: PDDX-6189-DNXD | 17 contracts | £8,050,000,000 | At ceiling / not disclosed |
JOHN GRAHAM CONSTRUCTION LIMITEDCRN: NI003503 | 42 contracts | £7,886,911,783 | At ceiling / not disclosed |
Bouygues UKCRN: 03460378 | 5 contracts | £7,750,000,000 | At ceiling / not disclosed |
Comparable Published Opportunities & Re-tender Precedents
Historic records ranked from matching published evidence. They serve as research precedents for contract scoping, specifications, and previous awardees.
Published procedure | Published value | Matching evidence |
|---|---|---|
Depot Fire Hydrants Design and Build - Tranche 1Transport for London · 10 Sept 2026, 13:06 BST | £3,232,541 | same CPV family similar value band |
Development of New Build Council Housing at Former Gungrog School, Welshpool, PowysPowys County Council · 8 Sept 2026, 15:06 BST | £3,300,000 | same CPV family similar value band |
Disabled Facilities Adaptations DN805651 RESID 2526-106London Borough of Brent · 7 Sept 2026, 16:43 BST | £3,600,000 | same CPV family similar value band |
Cyngor Sir Ddinbych Fframwaith Cynnal a chadw adweithiol / Denbighshire County Council Reactive maintenance frameworkDenbighshire County Council · 9 Sept 2026, 14:44 BST | £6,000,000 | same CPV family similar value band |
COV-Parks ServicesCoventry City Council · 9 Sept 2026, 17:11 BST | £2,000,000 | same CPV family similar value band |
Method: tender-intelligence-v1. Empirical OCDS facts and cross-sector percentiles; missing fields remain unrecorded.SME Friendly Qualification Criteria
Procedure terms & legal framework
| Procedure method | Standard public procedure | Legal basis | UKPGA · 2023/54 Procurement Act 2023 | Procurement category | works |
|---|---|---|---|---|---|
| Notice status | planning | Procurement threshold | Sub-threshold | Regulatory regime | Standard commercial regime |
| Commercial structure | Stand-alone contract (No framework) | Competition type | Competitive procedure | GPA WTO covered | Unspecified in notice |
| Recurring procurement | No (One-off requirement) | First published | 10 Sept 2026, 13:26 BST | Last source update | 10 Sept 2026, 13:26 BST |
| Estimated future notice | 5 Oct 2026, 23:59 BST | Classification (CPV) | Demolition, site preparation and clearance work, Excavating and earthmoving work, Test drilling and boring work | ||
| Delivery area | Location not published | ||||
| Official Registry OCID | ocds-h6vhtk-06f6cf | ||||
Timeline
- Pipeline notice
10 Sept 2026, 13:26 BST - Procedure published
10 Sept 2026, 13:26 BST - engagement
21 Sept 2026, 23:59 BST · scheduledWe are using this Market Engagement to assess initial interest in each of the two Lots and determine the number of potential suppliers capable of meeting the requirements. This will help to inform the procurement approach and level of competition expected. Suppliers interested in this opportunity are invited to register their interest by contacting Commercial Services at [email protected] with the title Quarrying - Market Engagement. Expressions of interest should include the organisation name, contact details, which Lot(s) you are interested in and a brief overview of relevant experience.
Commercial outcome and contract awards
Awards (0)No award published |
Contracts (0)No contract published |
Bid statisticsNo aggregate bid statistics published |
Notice history
From official release and amendment events
- Official notice release published
10 Sept 2026, 13:26 BST
Buyer and organisations in this procedure
Forestry Commission
Contracting authority
Official Documents & Specifications (1)
Official links; attachments are not copied
- 10 Sept 2026, 13:26 BST