Find a TenderAwarded
Published 28 Mar 2024, 14:33 GMT

Official UK procurement notice

New Hospital Programme – Hospital 2.0 Alliance (H2A) Framework

Official notice

Authority: NHS England (Central government)·Consortium: 3 public authorities

Framework agreementWorksCompetitive dialogue
Framework ceiling (notional)£37,000,000,000framework ceiling, not attributable revenue · 1 value update
Submissions closed 19 Mar 2025awarded 4 Mar 2026
Next notice expected 28 Mar 2024

What is being bought

Published requirement description

NHS England (NHSE) has concluded a competitive dialogue procurement under the Public Contracts Regulations 2015 for the establishment of the Hospital 2.0 Alliance Framework (“H2A Framework”) and the Hospital 2.0 Alliance Agreement. These two instruments form the basis of a multi-supplier integrated delivery model created to deliver the New Hospital Programme (NHP). The H2A Framework provides the mechanism for awarding Call-Off Contracts for major capital works, including detailed design, construction, commissioning, and handover of hospital schemes. The Hospital 2.0 Alliance Agreement establishes the collaborative enterprise environment for NHSE, the Trusts, and the appointed H2A Contractors to foster alliance working and standardise design and delivery across the programme. <br/><br/>The Hospital 2.0 Alliance Agreement (Alliance Agreement) which is a cross-programme collaboration agreement (a contract for services with a facility to award task orders for minor constructability and advisory services); and The Hospital 2.0 Alliance Framework (H2A Framework) itself from which Call-Off Contracts for the delivery of specific Schemes/Works will be made. Works under the H2A Framework will be awarded via Call-Off Contracts using Collaborative Allocation, Mini-Competition or Direct Award procedures.<br/><br/>In accordance with the terms of the Procurement Documents, NHSE has awarded ten (10) places on the H2A Framework. The H2A Contractors will provide expertise and experience in construction and integration works on major complex life critical programmes to allow NHP to develop a more standardised approach to design and delivery, unlock efficiencies and accelerate delivery in one of the biggest hospital building programmes in a generation.<br/><br/>The H2A Framework (and Alliance Agreement) has been procured by and for the use of NHSE in respect of its needs and requirements for the New Hospital Programme and any wider NHSE requirements. The H2A Framework may also be used by those Contracting Bodies referred to in Section II.2.14 (Additional Information) below. The H2A Framework and/or Alliance Agreement may also be transferred in whole or in part to another public body (or bodies) that during the term of the Framework Agreement/Hospital 2.0 Alliance Agreement assume NHSE’s delivery obligations (in whole or in part) to deliver the New Hospital Programme or new NHS hospitals through another iteration of the New Hospital Programme.

CPV: Approval plans, working drawings and specifications · Architectural, construction, engineering and inspection services · Architectural, engineering and planning services · Building demolition and wrecking work and earthmoving work · Building services · Car park building construction work · Construction project management services · Construction work for buildings relating to health · Construction work for buildings relating to health and social services, for crematoriums and public conveniences · Construction, foundation and surface works for highways, roads · Construction-related services · Engineering services · +19 more

How this framework works

From the published notice
Places
up to 11 suppliers · 16 bids received (1.5 per place) · 10 appointed

The lotProcurement structure

single lot · value published
Lot #1The New Hospital Programme (NHP) was created to deliver the biggest hospital building…AwardedPublished value£37,000,000,000

The New Hospital Programme (NHP) was created to deliver the biggest hospital building programme in a generation. It is an enduring programme intended to develop capacity, value for money efficiency and skills over many years through collaboration, standardisation and cooperation. The Hospital 2.0 Alliance Framework (“H2A Framework” or “Framework Agreement”) has been established as a multi-supplier framework agreement for major capital works for hospital build, refurbishment and ancillary works required by NHSE, including the detailed design, construction, commissioning and handover of major hospital schemes including but not limited to NHP waves 1 to 3, as set out in the ‘NHP plan for implementation’.<br/><br/>Following the conclusion of this procurement, successful Tenderers have entered into two instruments:<br/><br/>- The Hospital 2.0 Alliance Agreement (Alliance Agreement), which is a cross-programme collaboration agreement (a contract for services with a facility to award task orders for minor constructability and advisory services); and<br/>- The Hospital 2.0 Alliance Framework (H2A Framework) itself, from which Call-Off Contracts for the delivery of specific Schemes/Works will be made.<br/><br/>The H2A Contractors will provide expertise and experience in construction and integration works on major complex life-critical programmes to allow NHP to develop a more standardised approach to design and delivery. The Framework Agreement may also be used by those Contracting Bodies referred to in Section VI.3 (Additional Information) below. NHSE also reserves the right to transfer the Framework Agreement (or any Call-Off Contract and/or the Hospital 2.0 Alliance Agreement) in whole or in part to another public body (or bodies) that during the term of the Framework Agreement/Call-Off Contract/Hospital 2.0 Alliance Agreement assume NHSE’s delivery obligations (in whole or in part) to deliver the New Hospital Programme or new NHS hospitals through another iteration of the New Hospital Programme.<br/><br/>Works and Services will be awarded via Call-Off Contracts under the Framework Agreement. These will be awarded via the following call-off procedures: Collaborative Allocation, Mini-Competition and Direct Award. It is NHSE’s intention for Call-Off Contracts to be awarded using Collaborative Allocation where NHSE and the Trusts consider that the unamended Model Call-Off Contract is appropriate and will secure value for money. It is intended (though not guaranteed) that all H2A Contractors will be awarded a Call-Off Contract or contracts.<br/><br/>The Alliance Agreement establishes the collaborative enterprise environment critical to facilitating the strategic aims of the NHP. In addition to call-offs under the Framework Agreement, NHSE (and potentially other Contracting Bodies) has the right to award services contracts for ancillary constructability and advisory services through the Alliance Agreement, instructed by way of task orders. All Tenderers awarded a place on the Framework Agreement have entered into the Alliance Agreement.<br/><br/>In accordance with the terms of the Contract Notice and Procurement Documents, the six (6) unsuccessful but compliant Tenderers have been invited to join the Alliance Agreement as Environment Participants.The procurement was conducted in accordance with the Competitive Dialogue procedure pursuant to the Public Contracts Regulations 2015 (PCR), reg. 30. Additional information: The Framework Agreement (and Alliance Agreement) has been procured by NHSE for and on behalf of itself and all NHS Trusts, NHS Foundation Trusts, DHSC and other NHS Bodies. The Secretary of State (DHSC) and NHSE may also use the Framework Agreement for any wider NHSE requirements. NHSE also reserves the right to transfer the Framework Agreement (or any Call-Off Contract and/or the Alliance Agreement) in whole or in part to another public body(ies) that assume NHSE’s delivery obligations (in whole or in part) to deliver the New Hospital Programme or new NHS hospitals through another iteration of the New Hospital Programme.<br/><br/>The total value of the Framework Agreement (and Alliance Agreement) is estimated as £37,000,000,000 (excluding VAT). The estimated value is to be treated as an estimate only and does not constitute a guaranteed or cap on spend under the Framework Agreement. It should also be noted that pursuant to the terms of the Procurement Documents and Framework Agreement, the Framework Agreement is not exclusive, and NHSE/other Contracting Bodies may procure or commission the provision of Works and/or Services which are the same or similar to those covered by the Framework Scope through any other means and with any other contractor.<br/><br/>The duration of 144 months (12 years) is the maximum possible duration for the Framework Agreement. However, the Framework Agreement will be for an initial term of six (6) years and NHSE reserves the right (at its absolute discretion) to extend the term of the Framework Agreement for a further period of six (6) years, subject to approval by HMG.<br/><br/>Additional Information regarding Award Criteria - in accordance with the Contract Notice, II.2.5) Award criteria, NHSE published on the basis that 'Price is not the only award criterion and all criteria are stated only in the procurement documents'. In accordance with the terms of the Contract Notice and Procurement Documents, Tenderers were required to submit their Final Tenders on the basis of fixed fee percentages and on that basis Final Tenders were evaluated on quality criteria only (PCR 2015, reg 67(4)).<br/><br/>Additional Information regarding Contract Value - in accordance with the terms of the Contract Notice, the estimated value of the H2A Framework and Alliance Agreement is published in this contract award notice, but the Framework and Alliance Agreement have 0 guaranteed value. The figures included in section V.2.4 are the lowest and highest fixed fee percentages applic…

Delivery: London · Works and Services will be performed at different sites in the UK in accordance with the NHP plan for implementation. See Section II.2.4.1 below.
Extensions: 1. Programme of Schemes: The indicative programme/schedule of the Schemes to be awarded via Call-Off Contracts under the Framework Agreement will be subject to internal business case approvals and may therefore be subject to change during the term of the Framework Agreement. <br/><br/>2. Alliance Agreement Task Orders: The Alliance Agreement includes a provision for issuing services contracts to H2A Contractors for constructability, design and testing advice. Any such services will be instructed by way of task orders in accordance with the terms of the Alliance Agreement. This is to facilitate consultation on constructability and supply chain as Hospital 2.0 is developed. Any task orders issued will be based on average industry rates.<br/><br/>3. Common Procurement Routes: NHSE may establish framework agreements and other procurement arrangements and/or direct the use of existing arrangements for the benefit of the NHP (“Common Procurement Routes”). <br/><br/>4. Transfer to replacement contracting authority: NHSE reserves the right to transfer the Framework Agreement (or any Call-Off Contracts and/or the Alliance Agreement) in whole or in part to another public body (or bodies) that during the term of the Framework Agreement (or any Call-Off Contracts and/or the Alliance Agreement) assume NHSE’s delivery obligations (in whole or in part) to deliver the New Hospital Programme or new NHS hospitals through another iteration of the New Hospital Programme.<br/><br/>5. Extension to the duration of the Framework Agreement: The initial term of the Framework Agreement is 6 years. NHSE reserves the right at its discretion to extend the term of the Framework Agreement for a further 6 years on notice, subject to approval by HMG. The length of the Framework Agreement is necessary to achieve the ethos of the Hospital 2.0 Alliance, being to create a programmatic alliance between NHSE, NHP, Trusts, H2A Contractors and other partners (as exemplified by the Alliance Agreement) to leverage the benefits of optimised capacity, efficiency, common supply chain and lessons learnt from repeat construction performance. Additionally, not only does the length of the Framework Agreement seek to align with the NHP ‘plan for implementation’, it also aims to assure the increasing and enduring capability and capacity of the industry beyond the completion of the final Schemes completed under the Framework Agreement.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Technical: 70%
  • Commercial: 30%
Published award criteria (3)
  • Technical: 70
  • Commercial: 30
  • Price: 0
Conditions of participation3
  • Suitability

    Applicants are referred to the Selection Questionnaire Pack and accompanying procurement documents for information about conditions for participation.

  • Economic & financial standing

    Applicants are referred to the Selection Questionnaire Pack and accompanying procurement documents for the economic and financial standing selection criteria for this procurement.

  • Technical & professional ability

    Applicants are referred to the Selection Questionnaire Pack and accompanying procurement documents for the technical and professional ability selection criteria for this procurement.

Successive reduction
Candidates will be reduced successively across stages
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • “New Hospital Programme – Hospital 2.0 Alliance (H2A) Framework” is a framework: the contest is a place on its panel, up to 11 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Competitive dialogue
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
28 Mar 2024, 14:33 GMT
Last source update
27 Mar 2026, 17:07 GMT
FTS notice number
2026/S 000-028763
Classification (CPV)
Approval plans, working drawings and specificationsArchitectural, construction, engineering and inspection servicesArchitectural, engineering and planning servicesBuilding demolition and wrecking work and earthmoving workBuilding servicesCar park building construction workConstruction project management servicesConstruction work for buildings relating to healthConstruction work for buildings relating to health and social services, for crematoriums and public conveniencesConstruction, foundation and surface works for highways, roads
+21 moreConstruction-related servicesEngineering services
Delivery area
UKYorkshire & Humber (UKE)London (UKI32)
Official registry OCID
ocds-h6vhtk-044e56 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic payment
Performance terms

Applicants are referred to the Selection Questionnaire Pack and accompanying procurement documents for information about NHSE’s contractual requirements.

Publisher note: 1. Terms in this Contract Notice with an initial capital letter have the meanings given in the SQP. See ITC Table 1.5 (Glossary of terms and definitions).<br/>2. To express interest, please register on the NHP e-Procurement Portal: https://health-family.force.com/s/Welcome<br/>2.1. Sign into an existing account, or register for a new one.<br/>2.2. Access the 'NHP Non Disclosure Agreement' project (reference number: C323060).<br/>2.3.a. If the supplier has completed an NHP NDA previously, the supplier must respond to the Broadcast message in the project with a request to access the procurement.<br/>2.3.b. If not completed an NDA previously, answer all questions (found under the Requirements section) within the project, and provide details of the authorised signatory who is entitled to sign the NDA on the supplier's behalf, click "submit", and;<br/>2.4. Sign the NDA facilitated by NHP via DocuSign. Once the NDA has been duly signed by the authorised signatory and received by NHSE, the NDA will be binding on the supplier and access to the H2A SQ and Reading Room will be granted.<br/><br/>3. Any messages about the opportunity should be sent via the NHP e-Procurement Portal. You can do this by going to the home page above and:<br/>• Clicking on 'My proposals & Quotes'<br/>• Clicking the relevant Project Title<br/>• Clicking 'Messages' & 'New Message’ <br/><br/>For technical assistance contact the NHP e-Procurement Portal helpdesk at [email protected] or by calling 0800 9956035.<br/><br/>4. A Candidate may be a single organisation or a Consortium. Both a Candidate that is a single entity and a Candidate that is a Consortium, may rely on the capacity and abilities of another Party or Parties to meet the SQ Minimum Standards. Refer to the SQP (Different types of Candidate) for more guidance. A Candidate may only submit one SQ Response. Candidates’ attention is drawn to the provisions on Conflicts of Interest relating to this procurement and the Framework Agreement set out in the SQP and draft ITPD.<br/><br/>5. Section I (Contracting authority): The Framework Agreement (and Alliance Agreement) is being procured by NHSE for and on behalf of itself and all NHS Trusts, NHS Foundation Trusts, DHSC and other NHS Bodies. The Secretary of State (DHSC) and NHSE may also use the Framework Agreement for any wider NHSE requirements. NHSE also reserves the right to transfer the Framework Agreement (or any Call-Off Contract and/or the Alliance Agreement) in whole or in part to another public body(ies) that assume NHSE’s delivery obligations (in whole or in part) to deliver the New Hospital Programme or new NHS hospitals through another iteration of the New Hospital Programme. <br/><br/>6. Sections II.1.5/II.2.6 (Estimated Value): The total value of the Framework Agreement (and Alliance Agreement) is estimated as £37,000,000,000 (excluding VAT). For further information about the basis on which this estimate has been calculated, please see the Candidate’s Guide and Descriptive Document. The estimated value is to be treated as an estimate only and does not constitute a guaranteed or cap on spend under the Framework Agreement. Candidates should also note that pursuant to clause 5 of the draft Framework Agreement in ITPD Volume 1 (Framework Documents) that the Framework Agreement is not exclusive, and NHSE/other Contracting Bodies may procure or commission the provision of Works and/or Services which are the same or similar to those covered by the Framework Scope through any other means and with any other contractor.<br/><br/>7. Section II.2.5 (Award Criteria): NHSE is keen to ensure that all H2A Contractors are capable of providing sufficient resource, capacity and expertise to deliver the Schemes. Therefore, the award criteria will focus on Tenderers’ technical capabilities to undertake the Works and Services. NHSE has determined that it will not ask Tenderers to bid a price as part of this procurement. Instead of evaluating price directly, NHSE will assess the Tenderers’ ability to work collaboratively with other suppliers to obtain value for money in the delivery of the Schemes. NHSE will then leverage the incentive scheme, alliance, scrutiny and support of the whole programme to ensure that each H2A Contractor’s prices established during stage 1 of a Call-Off Contract demonstrate efficiency and value for money for each Scheme. Price may be evaluated and competed in Mini-Competitions for later Schemes once the alliance, design and Hospital 2.0 is mature and has been tested. <br/><br/>8. Section II.2.7 (Duration of the Framework Agreement): The duration of 144 months (12 years) is the maximum possible duration for the Framework Agreement. However, the Framework Agreement will be for an initial term of six (6) years and NHSE reserves the right (at its absolute discretion) to extend the term of the Framework Agreement for a further period of six (6) years, subject to approval by HMG. Other dates and timescales in this Contract Notice and in the SQP are estimated and may be subject to change. <br/><br/>9. A response to this Contract Notice does not guarantee that a Candidate will be invited to participate in the CD stage. The procurement may be terminated or suspended at any time without cost or liability to NHSE. NHSE does not bind itself to enter into any framework agreements/contract(s) arising out of the procedures envisaged by this Contract Notice. No contractual rights express or implied arise out of this Contract Notice or the procedures envisaged by it. Any framework agreements/contract(s) let by NHSE may provide that the scope or duration of the Framework Agreement/Call-Off Contract may be extended at NHSE's discretion. NHSE reserves the right to vary its requirements and modify the terms of the procurement procedure. NHSE reserves the right to disqualify any Candidates on terms set out in the SQP.<br/><br/>10. Candidates/Tenderers are solely responsible for and liable for all costs associated with and arising out of or in connection with responding to this Contract Notice and any SQ Response and with submitting any tender, howsoever incurred.

How it was run

Official notice
Run through: Atamis legacy domain (health-family.force.com) · Who buys & how to bid on Atamis
Supplier login requiredLanguage: EN
Access & registration note: Legacy Salesforce domain still used in notices — use the current Atamis portal · this portal address is a legacy domain; the operator has migrated

Tender documents are also served through a separate tool: https://health-family.force.com/s/Welcome ↗

Appointment period ends
19 Mar 2025, 12:00 GMT
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Supplier levy on call-offs (max %)
document
Bid validity
360 days from the deadline
Detailed submission instructions & authority contactsFrom official release

Timeline

28 Mar 2024 → 27 Mar 2026 · 4 dates
  1. Next notice expected
    28 Mar 2024
  2. Admission / appointment period endsperiod end, not a bid countdown
    19 Mar 2025, 12:00 GMT
  3. Invitations to tender expected
    6 May 2025, 00:00 BST
  4. Notice published208 days ago
    27 Mar 2026, 17:07 GMT

Notice history

7 events · 3 releases on Find a Tender · since 12 Feb 2025
  1. Published value published: £37,000,000,000
    12 Feb 2025, 14:50 GMT
  2. Status changed to active
    12 Feb 2025, 14:50 GMT
  3. Procurement method changed
    12 Feb 2025, 14:50 GMT
  4. Deadline published: 19 Mar 2025, 12:00 GMT
    12 Feb 2025, 14:50 GMT
  5. Buyer details updated
    12 Feb 2025, 14:50 GMT
  6. Status changed to complete
    27 Mar 2026, 17:07 GMT
  7. Buyer details updated
    27 Mar 2026, 17:07 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 10admitted to the panel · see the list ↓
Bids received 16
Contracts signed 10latest 4 Mar 2026

10 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Contract 028763-2026-1

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-10

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-2

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-3

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-4

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-5

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-6

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-7

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-8

    Signed
    4 Mar 2026
    Value
    —
    Status
    active
  • Contract 028763-2026-9

    Signed
    4 Mar 2026
    Value
    —
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
16bids · 16 electronic0—£6 – £8

Contracting authority & participating public bodies

2 public bodies on the notice

NHS England

Contracting authorityCentral GovernmentBody governed by public lawHealth 7-8 Wellington Place, Leeds, UK, LS1 4APContact email

Dispute resolution & review bodies

  • The High CourtReview body London

Framework contractors & participating bidders

10 commercial parties on the notice
  • Bovis Construction (Europe) LimitedFramework contractor Bovis Construction (Europe) Limited 30 Crown Place London EC2A 4ES, London, London, EC2A 4ES
  • DRAGADOS SOCIEDAD ANONIMAFramework contractor Dragados Sociedad Anonima Avenida del Camino de Santiago No. 50 Avd. Camino De Santiago Madrid 28080 Spain, Madrid, ES3, Madrid 28080
  • GRAHAMFramework contractor John Graham Construction Limited 5 Ballygowan Road Hillsborough County Down Northern Ireland BT26 6HX, Hillsborough, Northern Ireland, BT26 6HX
  • Integrated Health Projects (IHP)Framework contractor Astral House Imperial Way Watford WD24 4W, Watford, East of England, WD24 4W
  • Kier Construction LimitedFramework contractor Kier Construction Limited 2nd Floor Optimum House Clippers Quay Salford M50 3XP, Salford, North West, M50 3XP
  • Laing O'RourkeFramework contractor Laing O'Rourke Delivery Limited Bridge Place Anchor Boulevard Admirals Park Crossways Dartford Kent DA2 6SN, Dartford, South East, DA2 6SN
  • Morgan Sindall Construction and Infrastructure LtdFramework contractor Morgan Sindall Construction and Infrastructure Ltd Kent House 14-17 Market Place London W1W 8AJ, London, London, W1W 8AJ
  • SACYR UK LIMITEDFramework contractor Sacyr UK Limited 1 Lyric Square (Office 12.04) London W6 0NB, London, London, W6 0NB
  • Skanska Construction UK LimitedFramework contractor Skanska Construction UK Limited 1 Hercules Way Leavesden Watford WD25 7GS, Watford, East of England, WD25 7GS
  • Willmott Dixon Construction LimitedFramework contractor Willmott Dixon Construction Limited Suite 201 The Spirella Building Bridge Road Letchworth Garden City Hertfordshire SG6 4ET, Letchworth Garden City, East of England, SG6 4ET

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.