Find a TenderAwardedContract details notice
Published 23 May 2025, 12:05 BST

Official UK procurement notice

Materials System Transformation Technical & Consultancy Support Framework

Official notice

Authority: Waste & Resources Action Programme (Public body)

Open framework scheme2 lotsServicesCompetitive flexible procedureAbove thresholdSME suitableVCSE suitable
Framework ceiling (notional)£2,000,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 19 Jun 2025awarded 1 Sept 2025
Awarded to 3Keel Group Ltd +12 more2 awards
Framework period 2 yrsends 1 Sept 2027 · up to 1 Sept 2033 with extensions · starts 1 Sept 2025

What is being bought2 lots · detail below

Published requirement description

WRAP’s Materials Systems Transformation programme seeks to design out waste during production and consumption and retain its value and mitigate the damage being inflicted on our planet. We take a holistic approach to protect and restore our natural world: gathering 3 and considering the evidence, collaborating with all partners in the system and proposing circular solutions that work across the supply chain.

This Framework will support WRAP’s ongoing efforts in technical and policy support, stakeholder engagement, and citizen-facing campaigns across multiple regions by aiming to appoint suppliers who can help WRAP reach our target outcomes for both Transforming Textiles & Prevent Problem Plastics & Packaging.

The Framework has been divided into 2 Lots. Organisations can apply for one or both Lots should they wish. Tailored applications should be submitted for each Lot and will be evaluated separately. Work awarded under the Framework will be on a call-off basis and awarded either through a mini-competition or direct award.

To view this notice, please click here:

www.delta-esourcing.com/delta/viewNotice.html ↗

  • How the procedure runs: Stage 1 - Selection Questionnaire Stage 2 - Invitation to Tender (Pricing & Qualitative Criteria)

CPV: Environmental services

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Bids received
22 bids received · 19 suppliers appointed
Framework period
2 yrs · up to 8 yrs from 1 Sept 2025
Scheme runs until
31 Aug 2027
Supplier levy on call-offs (max %)
N/A
Published description of the framework

Composite Day Rates were obtained during ITT. Award process for Call Offs will be via: Direct Award or Mini-Competition.

Call-offs published through it2

Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.

Lots and requirements (2)Procurement structure

2 lots · all with a published value · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £1,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Transform TextilesAwardedRenewal 2 yrsSMEVCSEceiling above

WRAP’s global ambition is to halt the increase in the carbon and water footprint of the textiles industry and set it on a trajectory to net zero by 2050 in line with the Paris Agreement commitments. Clothing is thought to be currently responsible for around 10% of global greenhouse gas emissions. To achieve this, the current linear system of ‘take, make and dispose’ needs to be transformed into a sustainable and circular textiles system through the application of just transition principles. This will require a decoupling of virgin resource use from growth and decarbonisation of the value chain.

WRAP will focus on the following product categories for high impact, but not limited to these areas:

✓ Clothing: Every day clothing including fashion is the top priority, with workwear and footwear also being in scope. o Workwear is identified as an area where there are key opportunities for circularity.

✓ Household textiles: This includes ‘foldable household textiles such as bed linen.’ Furniture is a lower priority but not out of scope.

WRAP will focus its actions on:

  • The design, production and manufacture, use and purchase of new textiles to be designed for longevity, durability, recyclability, repair, rental, remanufacture and disassembly amongst others.
  • Adoption of circular business models to promote reuse of textiles and retain textiles at their highest value for as long as possible.
  • Facilitation of closed loop recycling systems and open loop recycling systems to be in place.
  • Citizen behaviour change
  • Adoption of innovation to drive change.

Further impact analysis will be undertaken by WRAP to identify the hotspots and biggest opportunities for carbon reduction, and in which geographies to operate.

Contract period: 1 Sept 2025 – 1 Sept 2027 (2 yrs) · up to 1 Sept 2033 with extensions
Delivery: UKEligibility: SME eligibleVCSE eligible
Extensions: The Framework Agreement will operate for a maximum of 8 years. A new procurement exercise will be run prior to each 2-year re-opening window to allow new suppliers to apply. Existing suppliers will remain on the Framework for the full duration, subject to performance and continued eligibility. Re-openings will be conducted via a new procurement process under the Open Framework provisions of the UK Procurement Act 2023. MST Framework 1: 1 Sept 2025 - 31 Aug 2027 MST Framework 2: 1 Sept 2027 - 31 Aug 2029 MST Framework 3: 1 Sept 2029 - 31 Aug 2031 MST Framework 4: 1 Sept 2031 - 31 Aug 2033
Lot #2Prevent problem plastics & packagingRenewal 2 yrsSMEVCSEceiling above

WRAP’s ambition is for a circular economy for packaging, with a particular emphasis on materials where there are market failures that lead to material losses and increased carbon. This means that we want to change our relationship with packaging – removing it where it is unnecessary, reducing it where possible, reusing it to keep it within the circular economy, and ensuring that as much of it is recycled as possible. We want to see it incorporated into new packaging and products, if incorporating it as recycled content in packaging is not feasible. In doing so, our hypothesis is that this will not only reduce carbon through resource efficiency but also reduce pollution and packaging’s impacts on people and the planet. Our targets will vary across nations according to local infrastructure and will evolve to 2030 as the network of Pacts update their scope post 2025.

WRAP will focus its efforts on:

✓ Plastic packaging in 2025 and packaging more broadly (with a focus on materials where there are particular market issues) thereafter

✓ Fast moving consumer goods packaging and items e.g. wet wipes, disposable vapes

✓ Plastic packaging to improve circularity (removal, reuse and refill, reduction, including through product reformulation (for example concentrates and shampoo bars), design, collections, end markets)

✓ Carbon ‘hot spots’ e.g. glass ‘right weighting’ to reduce GHG emissions.

✓ Wider environmental ‘hot spots’ e.g. impact on biodiversity, nature and human health

✓ Chemicals of concern

Contract period: 1 Sept 2025 – 1 Sept 2027 (2 yrs) · up to 1 Sept 2033 with extensions
Eligibility: SME eligibleVCSE eligible
Extensions: The Framework Agreement will operate for a maximum of 8 years. A new procurement exercise will be run prior to each 2-year re-opening window to allow new suppliers to apply. Existing suppliers will remain on the Framework for the full duration, subject to performance and continued eligibility. Re-openings will be conducted via a new procurement process under the Open Framework provisions of the UK Procurement Act 2023. MST Framework 1: 1 Sept 2025 - 31 Aug 2027 MST Framework 2: 1 Sept 2027 - 31 Aug 2029 MST Framework 3: 1 Sept 2029 - 31 Aug 2031 MST Framework 4: 1 Sept 2031 - 31 Aug 2033

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 70%Price: 20%Social value: 10%
Published sub-criteria (3)
  • Professional & Technical Competency: 70%
  • Price: 20%
  • Social Value: 10%
Published award criteria (3)
  • Professional & Technical Competency
  • Social Value
  • Price
What this means for your bid
  • Price carries 20 of 100 points: a 10% discount moves about 2 points. The method statement decides this lot, not the discount.
  • “Materials System Transformation Technical & Consultancy Support…” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Unspecified in notice
First published
23 May 2025, 12:05 BST
Last source update
3 Oct 2025, 10:05 BST
Award evaluation window
Submission end – 16 Aug 2025
Authority reference
PRC029 / FRA080
FTS notice number
2025/S 000-026122
Latest notice
Contract details notice (UK7)
Classification (CPV)
Environmental services
Delivery area
UK
Official registry OCID
ocds-h6vhtk-0521e4 Find a Tender
How it runs

Stage 1 - Selection Questionnaire

Stage 2 - Invitation to Tender (Pricing & Qualitative Criteria)

How it was run

Official notice
Run through: Delta eSourcing · Who buys & how to bid on Delta
Public notice page · account needed to bidElectronic submission allowedLanguage: FR, ES
Access & registration note: Free Select account; no DUNS asked at signup
Requests to participate (first stage)
19 Jun 2025, 00:45 BST
Appointment period ends
19 Jun 2025, 00:45 BST
Clarification deadline
19 Jun 2025, 00:45 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
fr, es
Supplier levy on call-offs (max %)
call-off levy · N/A
Detailed submission instructions & authority contactsFrom official release

Timeline

23 May 2025 → 3 Oct 2025 · 8 dates
  1. Tender notice published
    23 May 2025, 12:05 BST
  2. Clarification questions by
    19 Jun 2025, 00:45 BST
  3. Admission / appointment period endsperiod end, not a bid countdown
    19 Jun 2025, 00:45 BST
  4. Award decision expected by
    16 Aug 2025, 00:59 BST
  5. Assessment summaries sent
    1 Sept 2025, 00:00 BST
  6. Contract starts
    1 Sept 2025
  7. Standstill ends
    12 Sept 2025, 23:59 BST
  8. Latest notice published382 days ago
    3 Oct 2025, 10:05 BST

Notice history

5 events · 3 releases on Find a Tender · since 23 May 2025
  1. Tender notice published
    23 May 2025, 12:05 BST
    UK4
  2. Contract award notice published
    3 Sept 2025, 10:05 BST
    UK6
  3. Status changed to complete
    3 Sept 2025, 10:05 BST
  4. Contract signature expected
    19 Sept 2025, 23:59 BST
    scheduled
  5. Contract details notice published
    3 Oct 2025, 10:05 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 192 awards · see the list ↓
Bids received 2215 from SMEs
Contracts signed 2latest 19 Sept 2025

£1,000,000 is the framework's published maximum, restated by the publisher on 2 award rows. It is one ceiling, not 2 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Transform Textiles2 awards
3Keel Group LtdSME, Eunomia Research & Consulting Ltd.SME, Flourish CSR LimitedSME, Green GainSME, KEO Europe Limited, RIDGE ENVIRONMENTAL LIMITEDSME +6 more22 Sept 2025 – 21 Sept 2027 · up to 31 Aug 2033Extensions: The Framework Agreement will operate for a maximum of 8 years. A new procurement exercise will be run prior to each 2-year re-opening window to allow new suppliers to apply. Existing suppliers will remain on the Framework for the full duration, subject to performance and continued eligibility. Re-openings will be conducted via a new procurement process under the Open Framework provisions of the UK Procurement Act 2023. MST Framework 1: 1 Sept 2025 - 31 Aug 2027 MST Framework 2: 1 Sept 2027 - 31 Aug 2029 MST Framework 3: 1 Sept 2029 - 31 Aug 2031 MST Framework 4: 1 Sept 2031 - 31 Aug 2033ceiling above1 Sept 2025Awarded
3Keel Group LtdSME, Chris Baker ConsultingSME, Cornwall Waste Needs AssessmentSME, Eunomia Research & Consulting Ltd.SME, Green GainSME, NextekSME +8 morePrevent problem plastics & packaging22 Sept 2025 – 21 Sept 2027 · up to 31 Aug 2033Extensions: The Framework Agreement will operate for a maximum of 8 years. A new procurement exercise will be run prior to each 2-year re-opening window to allow new suppliers to apply. Existing suppliers will remain on the Framework for the full duration, subject to performance and continued eligibility. Re-openings will be conducted via a new procurement process under the Open Framework provisions of the UK Procurement Act 2023. MST Framework 1: 1 Sept 2025 - 31 Aug 2027 MST Framework 2: 1 Sept 2027 - 31 Aug 2029 MST Framework 3: 1 Sept 2029 - 31 Aug 2031 MST Framework 4: 1 Sept 2031 - 31 Aug 2033ceiling above1 Sept 2025Awarded

Contracts

All 2 of these contracts carry the same published figure, £1,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Transform Textiles22final-stage tenders · 23 at stage one151—

Contracting authority & participating public bodies

Waste & Resources Action Programme

Contracting authorityPublic undertaking GB-PPON: PCTJ-5948-ZJZV Ground Floor, Blenheim Court, 19 George Street, Banbury, South East, OX16 5BHContact name, email, phone

Framework contractors & participating bidders

19 commercial parties on the notice
  • 3Keel Group LtdFramework contractorGB-COH: 14370375 7 Fenlock Court, Blenheim Business Park, 7 Fenlock Court, Blenheim Business Park,, Long Hanborough, South East, OX29 8LNContact name, email, phone
  • Argon & CoFramework contractorGB-PPON: PLDY-3187-DTNM 137 Euston Road, London, London, NW1 2AAContact name, email, phone
  • Chris Baker ConsultingFramework contractorGB-PPON: PCDR-5862-WTJM 10 Beverley Road, Highams Park, London, London, E4 9PLContact name, email, phone
  • Clarasys LtdFramework contractorGB-COH: 07311129 7th Floor, Riverside House,, 2a Southwark Bridge Rd, London, London, SE1 9HAContact name, email, phone
  • Eunomia Research & ConsultingFramework contractorGB-COH: 04150627 37 Queen Square, Bristol, South West, BS1 4QSContact name, email, phone
  • Flourish CSR LimitedFramework contractorGB-PPON: PNZT-1571-QQVQ Cambridge House, South Block, Henry Street, Bath, South West, BA1 1BTContact name, email, phone
  • Green GainFramework contractorGB-COH: 08575779 118 Monkswell House,, Manse Lane, Knaresborough, Yorkshire & Humber, HG5 8NQContact name, email, phone
  • KEO EuropeFramework contractorGB-COH: 15658331 51 Eastcheap, London, London, EC3M 1DTContact name, email, phone
  • Nextek LimitedFramework contractorGB-PPON: PJWL-6823-VVHH 66 Westbourne Terrace, Suite 5, LONDON, London, W2 3UJContact name, email, phone
  • PPS Recovery Systems LtdFramework contractorGB-PPON: PTRW-1651-LHDC 1 Metro Centre, Welbeck Way, Peterborough, East of England, PE2 7UHContact name, email, phone
Show 9 more suppliers
  • Post Growth Fashion Agency (Vladimirova Consulting)Framework contractorGB-PPON: PBPR-6647-CXMZ 1 rue Fend,, Geneva, CH, 1201, CHContact name, email, phone
  • Resilience Sustainable Solutions LtdFramework contractorGB-PPON: PCTQ-7291-HGXG 39 Cardiff Road, Llandaff, Cardiff, Wales, CF5 2DPContact name, email, phone
  • Resource FuturesFramework contractorGB-PPON: PLPP-5226-YJYZ Create Centre, Smeaton Road, Bristol, South West, BS1 6XNContact name, email, phone
  • Ricardo-AEA LtdFramework contractorGB-PPON: PRWX-2796-TVZH Shoreham Technical Centre, Old Shoreham Road, Shoreham-by-Sea,, Shoreham, South East, BN43 5FGContact name, email, phone
  • Ridge Environmental LtdFramework contractorGB-COH: 10286144 3 Elm Road, Gatley, Stockport, North West, SK8 4LYContact name, email, phone
  • SLR Consulting LtdFramework contractorGB-COH: 03880506 Third Floor, Summit House, 12 Red Lion Square, Holborn, London, London, WC1R 4QHContact name, email, phone
  • Stitch Saves NineFramework contractorGB-PPON: PZCT-1517-HJXM 24 Bridgewater, Derry, Northern Ireland, BT47 6YAContact name, email, phone
  • Technia Business Solutions LimitedFramework contractorGB-PPON: PZHB-6362-HPMD Technia Business Solutions Limited, Unit 1 Foxes Lane, Oakdale Business Park, Blackwood, Wales, NP12 4ABContact name, email, phone
  • Valpak LimitedFramework contractorGB-COH: 07688691 Unit 4 Stratford Business Park, Banbury Road, Stratford upon Avon, West Midlands, CV37 7GWContact name, email, phone

Official documents & specifications (5)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender