Official UK procurement notice
London Rail Infrastructure Improvement Framework
Authority: Transport for London — Rail for London Ltd (Public body)
What is being bought2 lots · detail below
Published requirement descriptionThis is a Contract Award Notification for the award of the London Rail Infrastructure Improvement Framework. The Framework is designed to deliver major and minor infrastructure improvement works on Transport for London (TfL) and Network Rail Managed Infrastructure (NRMI).
The Framework is made up of two lots, Lot 1.1 for Minor Infrastructure Improvement works and Lot 1.2 for Major Infrastructure Improvement works
This framework will be Rail for London Ltd (Part of the TfL Group of Companies and made up of London Overground, Trams and DLR) primary means of undertaking infrastructure improvement works for the term of the framework agreement. While primarily for Rail for London Ltd this framework can be utilised all TfL Group Companies including London Underground Limited and Crossrail for railway infrastructure improvement works.
CPV: Architectural design services · Building surveying services · Civil engineering consultancy services · Construction work for buildings relating to railway transport · Cooling and ventilation equipment · Demolition, site preparation and clearance work · Dimensional surveying services · Electrical installations for railways · Engineering design services · Fencing, railing and safety equipment installation work · Ground investigation services · Heating, ventilation and air-conditioning installation work · +14 more
How this framework works
From the published notice- Bids received
- 4 bids on the busiest of 2 lots · 6 suppliers appointed
Lots and requirements (2)Procurement structure
2 lots · no lot values publishedLot #1Minor Infrastructure ImprovementAwarded
Lot 1.1: Minor infrastructure improvement for works valued between GBP 0 - GBP 4,000,000.00
The successful 3 economic operators awarded a framework agreement for this lot have the capability to design, procure, install/modify, execute, test and commission and handover into maintenance the following packages of works/services identified below:
Design: The successful economic operators have the capability to provide multidisciplinary designs throughout the life cycle of a project. This will include (but is not limited to) fulfilling early design development including feasibility, option selection and single option development and detailed design. Works: Civil and premises — including modification of existing railway stations, route wide civils structures, Station platforms, Railway depots, ancillary buildings.
Works: Telecommunications — line-side and railway control systems, radio systems, antenna's, information and security systems, CCTV, access control, PA systems, customer information systems, public help point systems, passenger emergency points, telephone systems, data networks and Scada systems. Works: Fire detection and prevention systems — Fire detection, warning systems and integration into new and/ or existing systems, fire suppression systems, smoke ventilation systems, fire separation, compartmentalisation and structural fire protection, fire safety management controls. Works: Low voltage mechanical, electrical and power installations/renewal for railway stations, station platforms, railway depots and ancillary buildings. Works: High voltage mechanical, electrical and traction power (Track) including points and conductor rail heating systems, high voltage transformers, rectifiers and HV cabling, UPS, line side lighting, earthing and bonding, EMC verification, signalling power supply.
Works: Overhead line equipment (OHLE) and direct current (DC) — including design, installation and commissioning of OHLE and DC systems. Works: Signalling — including installation of TPWS systems, signalling commission systems, line side indicators, signalling control systems. Works: Track — the installation of track on all TfL infrastructure (i.e. heavy rail, light rail and trams). Works: Station lifts and escalators — including design, Installation, modification and commissioning and asset hand back.
Lot #2Major Infrastructure ImprovementAwarded
Lot 1.2: Major infrastructure improvement for works valued above GBP 4,000,000.00
The successful 3 economic operators awarded a framework agreement for this lot have the capability to design, procure, install/modify, execute, test and commission and handover into maintenance the following packages of works/services identified below:
Design: The successful economic operators have the capability to provide multidisciplinary designs throughout the life cycle of a project. This will include (but is not limited to) fulfilling early design development including feasibility, option selection and single option development and detailed design. Works: Civil and premises — including modification of existing railway stations, route wide civils structures, Station platforms, Railway depots, ancillary buildings.
Works: Telecommunications — line-side and railway control systems, radio systems, antenna's, information and security systems, CCTV, access control, PA systems, customer information systems, public help point systems, passenger emergency points, telephone systems, data networks and Scada systems. Works: Fire detection and prevention systems — Fire detection, warning systems and integration into new and/ or existing systems, fire suppression systems, smoke ventilation systems, fire separation, compartmentalisation and structural fire protection, fire safety management controls. Works: Low voltage mechanical, electrical and power installations/renewal for railway stations, station platforms, railway depots and ancillary buildings. Works: High voltage mechanical, electrical and traction power (Track) including points and conductor rail heating systems, high voltage transformers, rectifiers and HV cabling, UPS, line side lighting, earthing and bonding, EMC verification, signalling power supply.
Works: Overhead line equipment (OHLE) and direct current (DC) — including design, installation and commissioning of OHLE and DC systems. Works: Signalling — including installation of TPWS systems, signalling commission systems, line side indicators, signalling control systems. Works: Track — the installation of track on all TfL infrastructure (i.e. heavy rail, light rail and trams). Works: Station lifts and escalators — including design, Installation, modification and commissioning and asset hand back.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “London Rail Infrastructure Improvement Framework” is a framework: the contest is a place on its panel, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 25 Mar 2022, 07:17 GMT
- Last source update
- 25 Mar 2022, 07:17 GMT
- Authority reference
DN465077- FTS notice number
2022/S 000-008078- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-032628Find a Tender
- Review procedure
TfL observed a standstill period for a minimum of 10 calendar days from when the contract award decision was notified to Contractors. That notification provided full information on the award decision. The standstill period provided time for unsuccessful Contractors to challenge the award decision before the framework agreements were entered into.
Publisher note: The procurement was conducted on behalf of Transport for London (TfL) under the Utilities Contracts Regulations 2016 under the negotiated procedure with prior call for competition. TfL operates as a functional body of the Greater London Authority under the direction of the Mayor of London.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Contract 008078-2022-Major Infrastructure Improvement-2
- Signed
- 22 Mar 2022
- Value
- —
- Status
- active
Contract 008078-2022-Minor Infrastructure Improvement-1
- Signed
- 22 Mar 2022
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Minor Infrastructure Improvement | 4bids · 4 electronic | 0 | — | — |
| 2 · Major Infrastructure Improvement | 4bids · 4 electronic | 0 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- HM Courts and Tribunals ServiceReview body
Framework contractors & participating bidders
6 commercial parties on the notice- Balfour Beatty Rail LimitedFramework contractor
- Dyer and Butler LtdFramework contractor
- MTR Corporation (UK) LimitedFramework contractor
- Morgan Sindall Construction & Infrastructure LimitedFramework contractor
- Osborne Infrastructure LimitedFramework contractor
- Volker Fitzpatrick LimitedFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.