Official UK procurement notice
Lewisham Homes DLO Support Contracts
Authority: Lewisham Homes
What is being bought8 lots · detail below
Published requirement descriptionLewisham Homes sought expressions of interest from suitably skilled and experienced service providers to deliver a range of works and services under contract and framework arrangements, to support its in-house Direct Labour Organisation. These comprised: 2 general build contracts, to be split geographically north and south of the borough, primarily to deliver responsive repairs and voids works; a drainage and groundworks contract; a roofing contract; a damp investigation and leaks contract; an out of hours call handling contract; a scaffolding framework; and a waste management framework.
CPV: Bathrooms construction work · Building installation work · Call centre · Concrete work · Construction supervision services · Construction-related services · Decoration work · Drainage and surface works · Drainage construction works · Drainage works · Drains construction work · Electrical installation work · +33 more
How this framework works
From the published notice- Bids received
- 6 bids received · 3 suppliers appointed
Lots and requirements (8)Procurement structure
8 lots · no lot values published · same evaluation weights on every lotLot #12 - Roofing WorksCancelled
This Roofing Contract was intended to undertake roof repair works but with the provision for ad hoc roof replacements to be included in scope. The intention was to award it under a JCT Measured Term Contract (as amended) for a maximum duration of 10 years (4+1+1+1+1+1+1). Due to insufficient market interest at the first stage of the process, however, this Lot was withdrawn from the process and Lewisham Homes sought alternative options for the delivery of these works. Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #23 - Drainage and GroundworksCancelled
This Drainage and Groundworks Contract is to undertake drainage and groundwork repair works plus the installation of new components where required. This contract is a JCT Measured Term Contract (as amended) for a maximum duration of 10 years (4+1+1+1+1+1+1). Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #34 - Damp Detection and Leaks InvestigationCancelled
This Damp Detection and Leaks Investigation Contract was intended to undertake trace and access, and damp detection works, plus the associated remedial works including making good. The Contract was also to include services to assist Lewisham Homes to manage/resolve housing disrepair claims. This contract was due to be awarded under a JCT Measured Term Contract (as amended) for a maximum duration of 10 years (4+1+1+1+1+1+1). Due to insufficient market interest at the first stage of the process, however, this Lot was withdrawn from the process and Lewisham Homes sought alternative options for the delivery of these services. Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #45 - Scaffolding and Access EquipmentCancelled
This Scaffolding and Access Equipment Framework was intended to be to undertake scaffolding and associated works including access works via equipment such as cherry pickers and the like. This framework was due to be awarded to between 2 and 6 providers under an overarching framework agreement under which call offs would be via a JCT Measured Term Contract (as amended) for 4 years. Due to insufficient market interest at the first stage of the process, however, this Lot was withdrawn from the process and Lewisham Homes sought alternative options for the delivery of these works. Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #56 - Waste ManagementCancelled
This Waste Management Framework was intended to be for the provision of a waste management site/depot/facility for the receipt and appropriate recycling/disposal of site-based waste generated by Lewisham Homes' DLO and other contractors. This framework was due to be awarded to between 2 and 6 providers under an overarching framework agreement under which call offs would be via a JCT Measured Term Contract (as amended) for 4 years. Due to insufficient market interest at the first stage of the process, however, this Lot was withdrawn from the process and Lewisham Homes sought alternative options for the delivery of these services. Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #67 - Out of Hours Contact CentreCancelled
This Out of Hours Contact Centre Contract was due to be for the provision of a contact centre and call handling service to manage out of hours emergencies including repairs and ASB. This was due to be awarded under a JCT Services Contract (as amended) for a maximum of 4 years (2+2). Due to insufficient market interest at the first stage of the process, however, this Lot was withdrawn from the process and Lewisham Homes sought alternative options for the delivery of these services. Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which were available to download from EU Supply.
Lot #71a - General Build (North Area)Cancelled
This General Build Contract is to undertake responsive repair and void works to stock in the North area of Lewisham Homes' operation, with the provision for kitchen and bathroom installation works to be included as an option within the contract, including level access shower rooms. This contract is a JCT Measured Term Contract (as amended) for a maximum duration of 10 years (5+5). Additional information: All criteria and exclusion grounds to be used to short-list candidates to be Invited to Tender were set out in the tender documents, available to download from the EU Supply portal.
Lot #81b - General Build (South Area)Cancelled
This General Build Contract is to undertake responsive repair and void works to stock in the South area of Lewisham Homes' operation, with the provision for kitchen and bathroom installation works to be included as an option within the contract, including level access shower rooms. This contract is a JCT Measured Term Contract (as amended) for a maximum duration of 10 years (5+5). Additional information: Full details of the contracts and frameworks and associated requirements were included in the procurement documents, which are available to download from EU Supply.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality: 60%
- Cost: 40%
Published award criteria (2)
- Quality: 60
- Cost: 40
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Lewisham Homes DLO Support Contracts” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 7 Jun 2021, 13:36 BST
- Last source update
- 7 Jun 2021, 13:36 BST
- Authority reference
Ech944- FTS notice number
2021/S 000-012668- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02b8edFind a Tender
- Review procedure
Lewisham Homes observed a standstill period following the award of the Contracts/Frameworks in respect of any appeals in accordance with the Public Contracts Regulations 2015 (as amended).
Publisher note: At the time of inviting expressions of interest, the Client formed the view that TUPE may apply to apply to the works/services which are being procured. Participants therefore needed to take into account the requirements of TUPE and were advised to seek their own independent advice on the potential implications and requirements of TUPE. The Contracting Authority reserved the right to cancel the procurement and not to proceed with any or all of the contracts/frameworks at any stage of the procurement process. The Contracting Authority also reserved the right not to award any or all of the contracts and/or frameworks. Neither the Contracting Authority nor any person on whose behalf of whom this procurement is undertaken are to be liable for any costs incurred by those expressing an interest or tendering for these contracts and frameworks.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
1a - General Build (North Area)
- Signed
- 1 Jun 2021
- Value
- £11,980,602
- Status
- active
1b - General Build (South Area)
- Signed
- 1 Jun 2021
- Value
- £8,625,636
- Status
- active
3 - Drainage and Groundworks
- Signed
- 1 Jun 2021
- Value
- £1,396,875
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 6bids | 5 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Cabinet OfficeReview contact point
- High Court of England and WalesReview body
Framework contractors & participating bidders
3 commercial parties on the notice- Masher Brothers LimitedFramework contractor
- Relative Groundworks LimitedFramework contractor
- T. Gilmartin LimitedFramework contractor
Official documents & specifications