Official UK procurement notice
Landscape Planting & Establishment Works including Highways Environments Framework for Hampshire
Authority: Hampshire County Council (Local council)·Consortium: 2 public authorities
What is being bought
Published requirement descriptionThe establishment of a new single lotted Multi-Contractor Framework for the delivery of mainly native species, large scale planting schemes, the majority of which will be associated with Highway projects although not necessarily on Highway land.
This Framework is for a four-year duration commencing September 2023 and will deliver Call-Offs up to the value of £4.5 Million pounds.
The works projects delivered through the Framework will consist of mainly native species planting and habitat creation together with establishment maintenance (up to 5 years) for small to large scale projects, with a typical value between £500 and £500K. There may be associated small scale hard landscape items such as fencing, drainage and paving.
A three-to-five year establishment phase will typically be attached to each project. The Contractor is expected to provide adequate labour to resource the ongoing maintenance of each, and every planting scheme awarded under this Framework for the duration of the establishment period.
Works projects may be in any of the following locations:
- Adjacent to a live Highway.
- Within a live construction site.
- Other project areas.
- Recurrence: Further notices for re-procurement of these services are likely to be issued within 12 months of the framework end date.
CPV: Drainage and surface works · Erection of fencing · Landscaping work · Landscaping work for roads and motorways · Laying of paving · Planting and maintenance services of green areas · Verge maintenance work
How this framework works
From the published notice- Bids received
- 3 bids received · 3 suppliers appointed
The lotProcurement structure
single lot · value publishedLot #1Contractors will be working in a live highway environment and/or in conjunction with a…AwardedPublished value£4,500,000
Contractors will be working in a live highway environment and/or in conjunction with a main, civil engineering project.
Special requirements:
In response to new requirements relating to biodiversity net gain (BNG), projects may be required to deliver habitat enhancements taking into account ecological sensitivities likely to be encountered on sites in Hampshire.
Specific works include but are not limited to:
- Preparation of ground for planting: weed control, cultivation, fertilising (topsoiling usually carried out by others).
- Seeding: amenity and/or specialist wildflower mixes including wetland mixes for swales and SuDS features.
- Wildflower plug planting appropriate to the local area.
- Bulb planting
- Mass planting native species whips and transplants on highway verges and adjacent areas.
- Specimen tree planting: from standard to semi mature stock into tree pits prepared by others.
- Horticultural sundries: rabbit/tree guards, stakes & ties, tree pit irrigation pipes; mulching etc.
- Creation of hibernacula, erection of bird and bat boxes, habitat piles etc.
- Protective fencing: timber and mesh fencing for planting areas.
- Ancillary works: small scale hard landscape items as required, typically small areas of paving or drainage.
- Post planting establishment - usually 3-to-5 year maintenance periods (including replacement of plant failures), to include weed control (typically herbicide treatment and/or strimming), hedge trimming, checking tree stakes/guards, re-mulching, watering, regular inspections.
- Grassland maintenance: amenity and wildflower types including embankments, verges, roundabouts, SuDS features. Arisings from wildflower areas to be removed off site.
Legislative requirements:
The delivery of Landscape projects on Highway land is constrained by legislative requirements under the Highways Act of 1980. Contractors are required to have competent operatives, with the required organisational processes in place to meet the legislation:
- The design, operation and management of traffic management in accordance with the Traffic Signs Manual Chapter 8: Traffic Safety Measures Road Works and Temporary Situations (2009) and the Safety at Street Works and Road Works: A Code of Practice (2013) (SSWRW), and any other applicable regulatory and advisory standards.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (4)
- Management Structure and Resourcing: 10%
- Implementation Plan: 10%
- Health and Safety and Working in Public Areas: 10%
- price: 70%
Published award criteria (4)
- Management Structure and Resourcing: 10%
- Implementation Plan: 10%
- Health and Safety and Working in Public Areas: 10%
- Price: 70%
- Suitability
Qualification requirements:
- All site-based staff must hold a Construction Skills Certification Scheme (CSCS) card.
- The Health and Safety Manager must hold NEBOSH Health and Safety Management for Construction (UK) qualification and or CITB's Site Management Safety Training Scheme (SMSTS).
- Site supervisors/managers hold Managing safely IOSH qualification and or CITB's Site Supervisors Safety Training Scheme (SSSTS).
Legislative requirements:
- The delivery of Landscape projects on Highway land is constrained by legislative requirements under the Highways Act of 1980. Contractors are required to have competent operatives, with the required organisational processes in place to meet the legislation:
- The design, operation and management of traffic management in accordance with the Traffic Signs Manual Chapter 8: Traffic Safety Measures Road Works and Temporary Situations (2009) and the Safety at Street Works and Road Works: A Code of Practice (2013) (SSWRW), and any other applicable regulatory and advisory standards.
- Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
- “Landscape Planting & Establishment Works including Highways…” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
Yes · Further notices for re-procurement of these services are likely to be issued within 12 months of the framework end date.
- First published
- 30 Jan 2023, 13:10 GMT
- Last source update
- 29 Aug 2023, 09:54 BST
- Award evaluation window
- 20 Jun 2023 – …
- Authority reference
ET19594- FTS notice number
2023/S 000-025240- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03a116Find a Tender
- Performance terms
Insurance requirements will be set out in full within the call-off contracts and depend on the site of the project. As an indication the following levels apply however further explanation of specific requirements is set out in the tender documents.
- Public Liability £5 million
- Employers Liability £5 million
- Professional Indemnity £2 million
- Motor Vehicle - Unlimited for injury or death and £10 million for damage to property
All contract awards under the Framework will use Landscape Works Contract 2017 (JCLI LWC 2017) and the Landscape Maintenance Works Contract 2017 (JCLI LMC 2017) or a successor equivalent.
Publisher note: We would like to explore the current level of H&S qualification within organisations who undertake these types of landscaping projects. Please complete the short questionnaire found https://in-tendhost.co.uk/hampshire/aspx/ProjectManage/19594 by no later than 2pm on Wednesday 22nd February 2023. The answers provided will be used to benchmark the market, to allow us to set an appropriate minimum H&S standard for this framework.
How it was run
Official notice- Appointment period ends
- 20 Jun 2023, 14:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Supplier levy on call-offs (max %)
- document
- Bid validity
- 90 days from the deadline
- Bids opened
- 20 Jun 2023, 15:00 BST
Timeline
31 Jan 2023 → 29 Aug 2023 · 4 dates- Next notice expected31 Jan 2023
- Admission / appointment period endsperiod end, not a bid countdown20 Jun 2023, 14:00 BST
- Bids opened20 Jun 2023, 15:00 BST
- Notice published29 Aug 2023, 09:54 BST
Notice history
7 events · 3 releases on Find a Tender · since 16 May 2023- Published value updated to £4,500,00016 May 2023, 10:02 BSTwas £2,500,000
- Status changed to active16 May 2023, 10:02 BST
- Procurement method changed16 May 2023, 10:02 BST
- Deadline published: 20 Jun 2023, 14:00 BST16 May 2023, 10:02 BST
- Buyer details updated16 May 2023, 10:02 BST
- Status changed to complete29 Aug 2023, 09:54 BST
- Buyer details updated29 Aug 2023, 09:54 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast3 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 3 of these contracts carry the same published figure, £4,500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
FRAMEWORK AGREEMENT FOR THE PROVISION OF LANDSCAPE PLANTING & ESTABLISHMENT WORKS INCLUDING HIGHWAYS ENVIRONMENT FOR HAMPSHIRE ET19594
- Signed
- 23 Aug 2023
- Value
- ceiling above
- Status
- active
FRAMEWORK AGREEMENT FOR THE PROVISION OF LANDSCAPE PLANTING & ESTABLISHMENT WORKS INCLUDING HIGHWAYS ENVIRONMENT FOR HAMPSHIRE ET19594
- Signed
- 23 Aug 2023
- Value
- ceiling above
- Status
- active
FRAMEWORK AGREEMENT FOR THE PROVISION OF LANDSCAPE PLANTING & ESTABLISHMENT WORKS INCLUDING HIGHWAYS ENVIRONMENT FOR HAMPSHIRE ET19594
- Signed
- 23 Aug 2023
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 3bids · 3 electronic | 3 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeDispute resolution & review bodies
- High Court of England and WalesReview body
Framework contractors & participating bidders
3 commercial parties on the notice- Ainsty Timber Marketing LimitedFramework contractor
- Blakedown Landscapes SE LtdFramework contractor
- Scandor Landscape Contractors LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria