← Back to search results

plannedFind a Tender · planning

KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)

Buyer: Merseytravel →

BuyerMerseytravel
Statusplanned
DeadlineNot published
Value£3,800,000
Published1 May 2026

What is being bought

The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel. The Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance. The appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to: Condition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions. Design Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards. Removal and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems. Integration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety. Traffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations. Health, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures. Environmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives. Testing, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation. The works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects. This procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.

Delivery location

UKD72, GB

Categories

Asbestos-removal work 45262660

Lot details

Lot 1

No lot description published.

Statusplanned
Contract periodFrom 1 Dec 2026 to 30 Nov 2027
SME suitabilitySuitable for SMEs

What is included

ItemCategoryQuantity
1Asbestos-removal workNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Asbestos-removal work (45262660); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 459,2234 median · 24.8 average (2,113 of 9,223 with a bid count)3.7 average (2,322 of 9,223 with named award suppliers)Not published
Same buyer5Not publishedNot publishedNot published
Delivery region: UKD72286 median · 21 average (3 of 28 with a bid count)3.8 average (4 of 28 with named award suppliers)Not published
Similar published value (0.5×–2×)1,0776 median · 6.8 average (5 of 1,077 with a bid count)2.7 average (6 of 1,077 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byNot published
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetValue not published
No-engagement rationaleNot published
Planning documents1
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-06905f
Latest release ID040553-2026
Latest release timestampFri May 01 2026 13:01:37 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusplanned
Procurement methodNot published
Procurement method detailsCompetitive flexible procedure
Main procurement categoryworks
Above thresholdYes
Legal basis2023/54
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender value£3,800,000
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
1 May 2026planning040553-2026

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "040553-2026",
  "tag": [
    "planning"
  ],
  "date": "2026-05-01T14:01:37+01:00",
  "ocid": "ocds-h6vhtk-06905f",
  "buyer": {
    "id": "GB-PPON-PJQR-8469-DXQD",
    "name": "Merseytravel"
  },
  "tender": {
    "id": "ocds-h6vhtk-06905f",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "suitability": {
          "sme": true
        },
        "contractPeriod": {
          "endDate": "2027-11-30T23:59:59Z",
          "startDate": "2026-12-01T00:00:00Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD72",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45262660",
            "scheme": "CPV",
            "description": "Asbestos-removal work"
          }
        ]
      }
    ],
    "title": "KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)",
    "value": {
      "amount": 3800000,
      "currency": "GBP",
      "amountGross": 4750000
    },
    "status": "planned",
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel.\nThe Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance.\nThe appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to:\nCondition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions.\nDesign Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards.\nRemoval and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems.\nIntegration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety.\nTraffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations.\nHealth, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures.\nEnvironmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives.\nTesting, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation.\nThe works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects.\nThis procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.",
    "communication": {
      "futureNoticeDate": "2026-06-01T23:59:59+01:00"
    },
    "aboveThreshold": true,
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PJQR-8469-DXQD",
      "name": "Merseytravel",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD72",
        "country": "GB",
        "locality": "Liverpool",
        "postalCode": "L3 1BP",
        "countryName": "United Kingdom",
        "streetAddress": "1 Mann Island"
      },
      "details": {
        "url": "http://www.merseytravel.gov.uk",
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PJQR-8469-DXQD",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "Procurement@liverpoolcityregion-ca.gov.uk"
      }
    }
  ],
  "language": "en",
  "planning": {
    "documents": [
      {
        "id": "040553-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/040553-2026",
        "format": "text/html",
        "noticeType": "UK1",
        "description": "Pipeline notice on Find a Tender",
        "documentType": "plannedProcurementNotice",
        "datePublished": "2026-05-01T14:01:37+01:00"
      }
    ]
  },
  "initiationType": "tender"
}
Complete JSON history (1 releases)
1 May 2026 · 040553-2026 · planning
{
  "id": "040553-2026",
  "tag": [
    "planning"
  ],
  "date": "2026-05-01T14:01:37+01:00",
  "ocid": "ocds-h6vhtk-06905f",
  "buyer": {
    "id": "GB-PPON-PJQR-8469-DXQD",
    "name": "Merseytravel"
  },
  "tender": {
    "id": "ocds-h6vhtk-06905f",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "suitability": {
          "sme": true
        },
        "contractPeriod": {
          "endDate": "2027-11-30T23:59:59Z",
          "startDate": "2026-12-01T00:00:00Z"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKD72",
            "country": "GB",
            "countryName": "United Kingdom"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45262660",
            "scheme": "CPV",
            "description": "Asbestos-removal work"
          }
        ]
      }
    ],
    "title": "KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)",
    "value": {
      "amount": 3800000,
      "currency": "GBP",
      "amountGross": 4750000
    },
    "status": "planned",
    "legalBasis": {
      "id": "2023/54",
      "uri": "https://www.legislation.gov.uk/ukpga/2023/54/contents",
      "scheme": "UKPGA"
    },
    "description": "The contracting authority intends to procure a suitably qualified contractor to undertake refurbishment and/or replacement works to the dado panel system within the Kingsway Tunnel.\nThe Kingsway Tunnel is a critical piece of transport infrastructure, and the existing dado panels-forming part of the tunnel lining and safety system-require upgrade to ensure continued compliance with current safety standards, durability requirements, and operational performance.\nThe appointed contractor will be responsible for delivering a comprehensive programme of works, which is expected to include, but not be limited to:\nCondition Assessment and Surveys: Detailed inspection of existing dado panels, fixings, and supporting structures to determine extent of deterioration, defects, and required interventions.\nDesign Development: Finalisation of design solutions for refurbishment and/or replacement, including materials selection, fire resistance, impact resistance, and compliance with relevant UK and EU tunnel safety standards.\nRemoval and Installation Works: Safe removal of existing panels where required and installation of new or refurbished dado panels, including all associated fixings, supports, and interfaces with tunnel systems.\nIntegration with Tunnel Systems: Coordination with existing tunnel infrastructure, including drainage, ventilation, lighting, and emergency systems, ensuring no adverse impact on operations or safety.\nTraffic and Operational Management: Planning and implementation of works to minimise disruption, including phased delivery, night-time or partial closures, and coordination with tunnel operations.\nHealth, Safety, and Compliance: Adherence to all relevant health and safety legislation, including working in confined spaces and live highway environments, with robust risk management procedures.\nEnvironmental Considerations: Management of waste, materials, and environmental impacts in line with applicable regulations and sustainability objectives.\nTesting, Commissioning, and Handover: Inspection and verification of installed systems, ensuring compliance with specifications and provision of as-built documentation.\nThe works will be delivered in a highly constrained operational environment, requiring careful planning, stakeholder coordination, and experience in similar tunnel or highway infrastructure projects.\nThis procurement seeks to appoint a contractor with proven expertise in tunnel refurbishment, highway infrastructure works, and installation of specialist panel systems. The project outputs will contribute to the long-term safety, resilience, and operational efficiency of the Kingsway Tunnel.",
    "communication": {
      "futureNoticeDate": "2026-06-01T23:59:59+01:00"
    },
    "aboveThreshold": true,
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Competitive flexible procedure"
  },
  "parties": [
    {
      "id": "GB-PPON-PJQR-8469-DXQD",
      "name": "Merseytravel",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKD72",
        "country": "GB",
        "locality": "Liverpool",
        "postalCode": "L3 1BP",
        "countryName": "United Kingdom",
        "streetAddress": "1 Mann Island"
      },
      "details": {
        "url": "http://www.merseytravel.gov.uk",
        "classifications": [
          {
            "id": "publicAuthoritySubCentralGovernment",
            "scheme": "UK_CA_TYPE",
            "description": "Public authority - sub-central government"
          }
        ]
      },
      "identifier": {
        "id": "PJQR-8469-DXQD",
        "scheme": "GB-PPON"
      },
      "contactPoint": {
        "email": "Procurement@liverpoolcityregion-ca.gov.uk"
      }
    }
  ],
  "language": "en",
  "planning": {
    "documents": [
      {
        "id": "040553-2026",
        "url": "https://www.find-tender.service.gov.uk/Notice/040553-2026",
        "format": "text/html",
        "noticeType": "UK1",
        "description": "Pipeline notice on Find a Tender",
        "documentType": "plannedProcurementNotice",
        "datePublished": "2026-05-01T14:01:37+01:00"
      }
    ]
  },
  "initiationType": "tender"
}