Inspection, testing and maintenance of Building Management System (BMS)
Health and social work services
Published value
£330,000
Submission deadline 10 Jan 2022, 14:00 GMT
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: West London NHS Trust: "Inspection, testing and maintenance of Building Management System (BMS)". Published status: active. Published value: £330,000. 1 published lot. Recorded submission deadline: 10 Jan 2022, 14:00 GMT. See the official notice for participation instructions.
| Contracting Authority | West London NHS Trust | Scope & Categories | Not published | Submission Window | Closed 10 Jan 2022, 14:00 GMT |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | £330,000 |
Bidder Intelligence · Authority Profile: West London NHS Trust
Market Analytics
Derived from OCDS awards & bid statistics
Published history for West London NHS Trust. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
Not availableNo published reports
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 0 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityWest London NHS Trust | Procedure methodNot published | Procurement categoryNot published |
Statusactive | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published22 Nov 2021, 10:45 GMT | Last source update22 Nov 2021, 10:45 GMT | Recurring procurementNo |
ClassificationHealth and social work services | ||
Delivery area | ||
OCIDocds-h6vhtk-02f8c3 | ||
What is being bought
The works comprise of the inspection and maintenance of building management system, for all equipment in the Trust's asset register , in line with manufacturers’ recommendations, governing regulations and best practice guidance including but limited to the checklist identified in the specification.
What changed
From the official release history
- Published value updated to £330,000
22 Nov 2021, 10:45 GMT - Status changed to active
22 Nov 2021, 10:45 GMT - Official notice release published
22 Nov 2021, 10:45 GMT - Submission deadline changed to 10 Jan 2022, 14:00 GMT
22 Nov 2021, 10:45 GMT - Buyer information updated
22 Nov 2021, 10:45 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedactivePublished value£330,000The requirements shall encourage the Contractor to provide a pro-active approach to preventative and reactive maintenance of the Trust building management systems. The Contractor shall directly employ, on this Contract, only engineers fully trained, qualified (including but not limited to on TREND systems) and of sufficient breadth of experience to cope with the level of expertise which will be required in inspecting, monitoring, testing, servicing and maintaining units and systems of different design and manufacture. The Contractor shall issue a pre-agreed work programme to the Contract Administrator and any alterations to these agreed dates should be made with the Contract Administrator or his nominated representative. Two-operatives working shall be used where appropriate and necessary for the delivery of this contract. If contractor is advising one operative working when carrying out servicing, contractor shall provide generic minimum risk assessment and method statement for lone working. The Contractor shall only provide directly employed operatives to execute the requirements of this contract and shall not sub-contract the Works nor use operatives provided by third parties, without the prior approval of the Contract Administrator. The Contractor shall insure they are familiar with all items of assets highlighted in Attachment B below. Any additional training required to carry out the servicing and repair of the plant shall be covered at the contractors’ expense. The Contractor is: - To produce a risk assessment and method statement produced before the work commences. Personal protective equipment (PPE) may be required - To produce defects reports and send to the Trust authorised officers within 1 working day from the time the issues are noticed. The Contractor will be expected to include: All service kits, consumable parts, cleaning chemicals and other necessary materials deemed necessary to meet the manufacturer’s service recommendations for each asset. All technical and associated administrative actions intended to maintain the equipment and systems in a condition where they can perform their required function (including materials except where explicitly advised to report and obtain authorisation from to the Trust Authorised Officer to progress with repair) The scope of works outlined in Attachment C should be undertaken as minimum requirements and where manufacturer’s instructions exceed the requirements in Attachment C, they shall be adhered to in their entirety. It is the Contractors’ responsibility to observe the on-going condition of the equipment with regard to safe, correct operation and control. The Contractor shall bring to the attention of the Trust any specific areas where periodic checking, testing and adjustment exceeds or fail normal provisions for equipment of the age and type installed. When the need for adjustment, repairs and replacement are identified during the course of maintenance inspections the Contractor shall undertake the necessary works in accordance with the requirements of this contract terms and specification. All additional cost for remedial repairs, deemed to be outside the scope of works of this contract, must be brought to the attention of the Contract Administrator or his nominated representatives before being carried out. Spares or replacement parts utilised on the contract for the control of building management system shall be of TREND make. Any deviation from this make shall be upon the authorisation of the Trust contract administrators. The Contractor shall ensure that they source all materials at the most competitive rates currently available to ensure best value at all times. Utilised spares on the contract are to be charged at the declared mark-up rates from paid wholesale prices and installed utilising the agreed labour rates. The Contractor shall be required to provide a 24 hour breakdown service, 365 days per annum. The Call Out is to be covered as soon as possible and the operative attending must be on site within same day if call out request is logged same day AM, whilst attending next day AM if call out request is logged during PM. The contractor may be required to respond and attend site within 4 hours for emergency callout request for full system failure or as determined by the Authority. If the Authority is to proceed with pricing schedule option 3, option 4, option 5 or a combination the contractor nominated engineer is expecting to be in attendance on the agreed day/s in line with the working hours stipulated in section 1.2.15 for 52 weeks per annum. The contract shall make the necessary arrangement for alternative cover during their nominated engineer planned or unplanned absences / leave.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
22 Nov 2021, 10:45 GMT - Submission deadline
10 Jan 2022, 14:00 GMT
Commercial outcome and competition
AwardsNo award published |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
West London NHS Trust
Contracting authority GB-FTS-35294Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published