Official UK procurement notice
Technology Enabled Care Services at Aster Group
Authority: Aster Group Limited
What is being bought2 lots · detail below
Published requirement descriptionAster provides Technology Enabled Care (TEC) services across a range of grouped living, sheltered and extra care schemes, supporting residents through Hard-Wired alarm systems, Digital Alarm Units (DAUs), dispersed TEC devices and emergency call-handling arrangements.
As part of the national digital switchover, all analogue systems must transition to digital-ready solutions by 2027. This requires a coordinated approach across both the maintenance of physical TEC equipment and the delivery of monitoring and alarm receiving services.
Lot 1 covers the maintenance, servicing, repair and future upgrade of Aster's Hard-Wired alarm systems, DAUs,smoke detection and fire panels within dwellings. The Contractor will support Aster in ensuring equipment reliability, minimising downtime, maintaining accurate asset data and enabling a smooth transition from analogue to digital-ready systems. These services play a critical role in ensuring that residents can raise alerts safely and consistently.
Lot 2 covers Monitoring and Alarm Receiving Centre (ARC) Services. The ARC is responsible for receiving alarm activations, responding to calls, triggering appropriate actions and supporting residents in emergency and welfare situations.
The ARC provider will also be responsible for onboarding new TEC users, including configuring monitoring profiles, ensuring alarms route correctly and maintaining up-to-date service user information. In addition, the ARC provider will be required to deliver a suite of performance and operational reports that enable Aster to review service outcomes, monitor compliance, identify trends and assure resident safety. Tenderers must therefore clearly outline the reports they propose to provide as part of their response. The ARC must provide key industry updates from the
TSA.
Together, the Lot 1 and Lot 2 services form an end-to-end TEC operating model that ensures residents receive a safe, reliable and digitally resilient service. Aster is seeking partners who can support this transformation, safeguard service continuity through the digital migration period and deliver a high-quality resident experience.
- The authority expects to re-tender this requirement around 1 Sept 2033, 23:59 BST.
- How the procedure runs: Single-stage competitive procedure with the option for clarification meetings, supplier presentations and site visits (Lot 2) at Aster's discretion in accordance with section 10 of the Invitation to Tender. The procedure comprises: Stage 1: Selection Questionnaire (pass/fail) assessed against the exclusion grounds at Schedules 6 and 7 of the Procurement Act 2023 and the conditions of participation set out in the Invitation to Tender Stage 2: Compliance review of tender submissions (pass/fail) Stage 3: Weighted evaluation of Quality (60%) and Price (40%), with optional clarification meetings, presentations and/or site visits
- No preliminary market engagement: A Preliminary Market Engagement (PME) Notice was not published as the engagement was strictly limited to independent technical consultancy for specification drafting. The authority has prepared and maintains a Conflicts Assessment in accordance with Section 81 of the Procurement Act 2023, confirming that the consultant is not a potential supplier and that their involvement does not create a conflict of interest or distort competition. As no wider market testing was conducted, a PME notice was not deemed necessary to ensure a level playing field.
CPV: Repair, maintenance and associated services related to personal computers, office equipment, telecommunications and audio-visual equipment · Social services · Telecommunications equipment and supplies · Telecommunications services
Lots and requirements (2)Procurement structure
2 lots · all with a published value (£3,000,000 together) · a supplier may bid for at most 1 and win at most 1 of them · same evaluation weights on every lotLot #1Hard-Wired and Digital Alarm Unit (DAU) Maintenance of Call Monitoring SystemsAwardedRenewalPublished value£1,800,000
The source published no individual description for this lot.
- Economic & financial standing
Minimum annual turnover thresholds (Lot-specific, set in accordance with section 22 of the Procurement Act 2023, full details in ITT)
- Technical & professional ability
Relevant accreditations or equivalents including NICEIC certification (Lot 1), BAFE SP203-1 (Lot 1, where applicable), TSA membership or equivalent TEC industry knowledge, Cyber Essentials Plus and ISO 27001 (or commitment to achieve)
Evidence of relevant experience over the past three years
Lot #2Monitoring and Alarm Receiving Centre (ARC) ServicesAwardedRenewalPublished value£1,200,000
The source published no individual description for this lot.
- Economic & financial standing
Minimum annual turnover thresholds (Lot-specific, set in accordance with section 22 of the Procurement Act 2023)
- Technical & professional ability
Relevant accreditations or equivalents including NICEIC certification (Lot 1), BAFE SP203-1 (Lot 1, where applicable), TSA membership or equivalent TEC industry knowledge, Cyber Essentials Plus and ISO 27001 (or commitment to achieve)
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality
- Price
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Yes · next expected 1 Sept 2033
- First published
- 19 Jan 2026, 17:34 GMT
- Last source update
- 16 Oct 2026, 11:40 BST
- Award evaluation window
- Submission end – 23 Jul 2026
- Authority reference
CAS-01240-W3D2X3- FTS notice number
2026/S 000-043242- Accelerated
- Qualifying planned procurement notice
- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-060945Find a Tender
- How it runs
Single-stage competitive procedure with the option for clarification meetings, supplier presentations and site visits (Lot 2) at Aster's discretion in accordance with section 10 of the Invitation to Tender. The procedure comprises:
Stage 1: Selection Questionnaire (pass/fail) assessed against the exclusion grounds at Schedules 6 and 7 of the Procurement Act 2023 and the conditions of participation set out in the Invitation to Tender
Stage 2: Compliance review of tender submissions (pass/fail)
Stage 3: Weighted evaluation of Quality (60%) and Price (40%), with optional clarification meetings, presentations and/or site visits
- Risks
Section 20 consultation
This procurement is subject to consultation with leaseholders under section 20 of the Landlord and Tenant Act 1985 in respect of qualifying long-term agreements. The notice of intention (Stage 1) has been issued and the statement of estimates (Stage 2) will follow the conclusion of tender evaluation. Award is conditional on the satisfactory completion of consultation.
How it was run
Official notice- Requests to participate (first stage)
- 2 Mar 2026, 12:00 GMT
- Submission deadline
- 8 Jun 2026, 12:00 BST
- Clarification deadline
- 29 May 2026, 12:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
in-tendhost.co.uk/aster/aspx/Home ↗
Tenders must be submitted via the In-Tend e-tendering portal only. Submissions made by any other means will not be considered.
Timeline
19 Jan 2026 → 16 Oct 2026 · 11 dates- Planning notice published270 days ago19 Jan 2026, 17:34 GMT
- Next notice expected270 days ago19 Jan 2026, 23:59 GMT
- Expressions of interest by229 days ago2 Mar 2026, 12:00 GMT
- Tender notice published158 days ago11 May 2026, 18:38 BST
- Clarification questions by141 days ago29 May 2026, 12:00 BST
- Submission deadline131 days ago8 Jun 2026, 12:00 BST
- Assessment summaries sent92 days ago17 Jul 2026, 00:00 BST
- Award decision expected by85 days ago23 Jul 2026, 23:59 BST
- Standstill ends80 days ago28 Jul 2026, 23:59 BST
- Contract starts46 days ago1 Sept 2026, 00:00 BST
- Latest notice published1 day ago16 Oct 2026, 11:40 BST
Notice history
11 events · 5 releases on Find a Tender · since 19 Jan 2026- Planned procurement notice published19 Jan 2026, 17:34 GMTUK3
- Planned procurement notice published19 Jan 2026, 17:41 GMTUK3
- Tender notice published11 May 2026, 18:38 BSTUK4
- Status changed to active11 May 2026, 18:38 BST
- Procurement method changed11 May 2026, 18:38 BST
- Deadline published: 8 Jun 2026, 12:00 BST11 May 2026, 18:38 BST
- Contract award notice published17 Jul 2026, 10:52 BSTUK6
- Status changed to complete17 Jul 2026, 10:52 BST
- Contract signature expected23 Aug 2026, 23:59 BSTscheduled
- Contract signature expected25 Aug 2026, 23:59 BSTscheduled
- Contract details notice published16 Oct 2026, 11:40 BSTUK7
Routine re-releases (5)
- 2026-01: 2 releases · 19 Jan 2026, 19 Jan 2026
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Hard-Wired and Digital Alarm Unit (DAU) Maintenance of Call Monitoring Systems1 award | |||
| Openview Security Solutions Limited23 Sept 2026 – 22 Sept 2030 · up to 22 Sept 2034Extensions: 4 years initial term, with 2 optional extensions of 2 years each (4+2+2). Maximum term 8 years. | £1,664,025 | 17 Jul 2026 | Awarded |
| Lot 2 · Monitoring and Alarm Receiving Centre (ARC) Services1 award | |||
| Appello Careline Limited23 Sept 2026 – 22 Sept 2030 · up to 22 Sept 2034Extensions: 4 years initial term, with 2 optional extensions of 2 years each (4+2+2). Maximum term 8 years. | £1,224,025 | 17 Jul 2026 | Awarded |
Contracts
Hard-Wired and Digital Alarm Unit (DAU) Maintenance of Call Monitoring Systems · Openview Security Solutions Limited
- Signed
- 29 Sept 2026
- Value
- £1,664,025
- Period
- 30 Oct 2026 – 29 Oct 2030 · up to 29 Oct 2034 with extensions
- Status
- active
- Extensions
- 2x 2 year optional extensions at Aster's discretion
3 agreed KPIs: KPI1 - Priority 1 (Critical) attendance · KPI2 - Priority 1 (Critical) completion · KPI3 - Priority 2 (Emergency) attendance
- KPI1 - Priority 1 (Critical) attendance, % of Priority 1 faults attended within 4 hours, measured from fault notification to time on site
- KPI2 - Priority 1 (Critical) completion, % of Priority 1 faults completed within 24 hours where parts are available; temporary measures must be in place where parts are not available
- KPI3 - Priority 2 (Emergency) attendance, % of Priority 2 faults attended within 24 hours
Monitoring and Alarm Receiving Centre (ARC) Services · Appello Careline Limited
- Signed
- 29 Sept 2026
- Value
- £1,224,025
- Period
- 30 Oct 2026 – 29 Oct 2030 · up to 29 Oct 2034 with extensions
- Status
- active
- Extensions
- 2x optional 2 year extensions at aster discretion
3 agreed KPIs: KPI1 - Alarm-to-answer within 60 seconds · KPI2 - Alarm-to-answer within 180 seconds · KPI3 - Complaint rate
- KPI1 - Alarm-to-answer within 60 seconds, % of all calls answered within 60 seconds
- KPI2 - Alarm-to-answer within 180 seconds, % of all calls answered within 180 seconds
- KPI3 - Complaint rate, % of customers who raise a monitoring-related complaint in the period
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Hard-Wired and Digital Alarm Unit (DAU) Maintenance of Call Monitoring Systems | 4final-stage tenders | 3 | 0 | — |
| 2 · Monitoring and Alarm Receiving Centre (ARC) Services | 5final-stage tenders | 1 | 0 | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
2 commercial parties on the notice- APPELLO CARELINE LIMITEDAwarded supplier
- OPENVIEW SECURITY SOLUTIONS LIMITEDAwarded supplier
Official documents & specifications (12)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications Reference only tender pack
- Technical specifications
- Bidding documents and specifications The full Invitation to Tender pack, including all appendices and supporting documents, is available via the e-tendering portal.
- Bidding documents and specifications Response Form
- Bidding documents and specifications PSQ questionnairre
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Planned procurement notice Planned procurement notice on Find a Tender
- Planned procurement notice Planned procurement notice on Find a Tender