Unmodified official OCDS data retained by Tenderline for this procurement process.
Complete current OCDS release JSON
{
"id": "006981-2021",
"tag": [
"planning"
],
"date": "2021-04-06T11:36:26+01:00",
"ocid": "ocds-h6vhtk-02a2b6",
"buyer": {
"id": "GB-FTS-1212",
"name": "United Kingdom Atomic Energy Authority"
},
"tender": {
"id": "T/AW049/21",
"lots": [
{
"id": "1",
"status": "planned",
"description": "A Supplier will be required to undertake the Preliminary and Final Design phase of the ISS sub-system and potential equipment, and process trials prior to delivery to site at Culham Science Centre.\nUpon completion of development trials, the system will undergo a Factory Acceptance Test (FAT) prior to site delivery. Installation, a Site Acceptance Test (SAT) in conjunction with supplier, and integration into the H3AT Tritium Loop will be carried out by the Systems Integrator/Integrated Control System contractor(s).\nAnticipated system description\nThe Isotope Separation System (ISS) separates a mixture of the six different Q2 (hydrogen) forms into streams containing predominantly H2 (protium), D2 (deuterium) and T2 (tritium) species. Cryo-distillation is the chosen technology. Cryodistillation exploits the small difference in volatility between the isotopes to achieve separation. The quantities of isotopologues of hydrogen – HD, HT and DT are reduced in the system using packed beds of catalyst, known as equilibriators. These are located in the streams between the 4 cryodistillation columns and promote the formation of H2, D2 and T2."
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryLocation": {
"description": "Culham Science Centre"
},
"deliveryAddresses": [
{
"region": "UKJ14"
}
],
"additionalClassifications": [
{
"id": "42123300",
"scheme": "CPV",
"description": "Compressors for refrigerating equipment"
},
{
"id": "42510000",
"scheme": "CPV",
"description": "Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery"
},
{
"id": "42511000",
"scheme": "CPV",
"description": "Heat-exchange units and machinery for liquefying air or other gases"
},
{
"id": "42511100",
"scheme": "CPV",
"description": "Heat-exchange units"
},
{
"id": "42511110",
"scheme": "CPV",
"description": "Heat pumps"
},
{
"id": "42511200",
"scheme": "CPV",
"description": "Machinery for liquefying air or other gases"
},
{
"id": "42910000",
"scheme": "CPV",
"description": "Distilling, filtering or rectifying apparatus"
},
{
"id": "51100000",
"scheme": "CPV",
"description": "Installation services of electrical and mechanical equipment"
},
{
"id": "51110000",
"scheme": "CPV",
"description": "Installation services of electrical equipment"
},
{
"id": "51112000",
"scheme": "CPV",
"description": "Installation services of electricity distribution and control equipment"
},
{
"id": "51112100",
"scheme": "CPV",
"description": "Installation services of electricity distribution equipment"
},
{
"id": "51112200",
"scheme": "CPV",
"description": "Installation services of electricity control equipment"
},
{
"id": "51120000",
"scheme": "CPV",
"description": "Installation services of mechanical equipment"
},
{
"id": "51230000",
"scheme": "CPV",
"description": "Installation services of testing equipment"
},
{
"id": "51430000",
"scheme": "CPV",
"description": "Installation services of laboratory equipment"
},
{
"id": "51500000",
"scheme": "CPV",
"description": "Installation services of machinery and equipment"
},
{
"id": "51510000",
"scheme": "CPV",
"description": "Installation services of general-purpose machinery and equipment"
},
{
"id": "51800000",
"scheme": "CPV",
"description": "Installation services of metal containers"
},
{
"id": "51810000",
"scheme": "CPV",
"description": "Installation services of tanks"
},
{
"id": "71300000",
"scheme": "CPV",
"description": "Engineering services"
},
{
"id": "71320000",
"scheme": "CPV",
"description": "Engineering design services"
},
{
"id": "71323000",
"scheme": "CPV",
"description": "Engineering-design services for industrial process and production"
},
{
"id": "71330000",
"scheme": "CPV",
"description": "Miscellaneous engineering services"
},
{
"id": "71333000",
"scheme": "CPV",
"description": "Mechanical engineering services"
},
{
"id": "71334000",
"scheme": "CPV",
"description": "Mechanical and electrical engineering services"
},
{
"id": "71335000",
"scheme": "CPV",
"description": "Engineering studies"
},
{
"id": "71336000",
"scheme": "CPV",
"description": "Engineering support services"
},
{
"id": "71340000",
"scheme": "CPV",
"description": "Integrated engineering services"
},
{
"id": "71350000",
"scheme": "CPV",
"description": "Engineering-related scientific and technical services"
},
{
"id": "73000000",
"scheme": "CPV",
"description": "Research and development services and related consultancy services"
},
{
"id": "73100000",
"scheme": "CPV",
"description": "Research and experimental development services"
},
{
"id": "73120000",
"scheme": "CPV",
"description": "Experimental development services"
},
{
"id": "73300000",
"scheme": "CPV",
"description": "Design and execution of research and development"
},
{
"id": "73430000",
"scheme": "CPV",
"description": "Test and evaluation"
}
]
}
],
"title": "H3AT ISS",
"status": "planned",
"coveredBy": [
"GPA"
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "A Supplier will be required to undertake the Preliminary and Final Design phase of the ISS sub-system and potential equipment, and process trials prior to delivery to site at Culham Science Centre. The system will undergo a Factory Acceptance Test (FAT) prior to site delivery. Installation, a Site Acceptance Test (SAT) in conjunction with supplier, and integration into the H3AT Tritium Loop will be carried out by the Systems Integrator/Integrated Control System contractor(s). Anticipated system description The Isotope Separation System (ISS) separates a mixture of the six different Q2 (hydrogen) forms into streams containing predominantly H2 (protium), D2 (deuterium) and T2 (tritium) species. Cryo-distillation is the chosen technology. Cryodistillation exploits the small difference in volatility between the isotopes to achieve separation. The quantities of isotopologues of hydrogen – HD, HT and DT are reduced in the system using packed beds of catalyst, known as equilibriators.",
"communication": {
"futureNoticeDate": "2021-07-15T00:00:00+01:00"
},
"classification": {
"id": "51000000",
"scheme": "CPV",
"description": "Installation services (except software)"
},
"mainProcurementCategory": "services"
},
"parties": [
{
"id": "GB-FTS-1212",
"name": "United Kingdom Atomic Energy Authority",
"roles": [
"buyer"
],
"address": {
"region": "UKJ14",
"locality": "Abingdon",
"postalCode": "OX14 3DB",
"countryName": "United Kingdom",
"streetAddress": "Culham Science Centre"
},
"details": {
"url": "http://www.gov.uk/government/organisations/uk-atomic-energy-authority",
"buyerProfile": "https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/72814",
"classifications": [
{
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"description": "Fusion Research"
}
]
},
"identifier": {
"id": "N/A",
"legalName": "United Kingdom Atomic Energy Authority"
},
"contactPoint": {
"url": "https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=37407&B=UK",
"name": "Abigail Woods",
"email": "abigail.woods@ukaea.uk"
}
}
],
"language": "en",
"initiationType": "tender"
}Complete JSON history (1 releases)
6 Apr 2021 · 006981-2021 · planning
{
"id": "006981-2021",
"tag": [
"planning"
],
"date": "2021-04-06T11:36:26+01:00",
"ocid": "ocds-h6vhtk-02a2b6",
"buyer": {
"id": "GB-FTS-1212",
"name": "United Kingdom Atomic Energy Authority"
},
"tender": {
"id": "T/AW049/21",
"lots": [
{
"id": "1",
"status": "planned",
"description": "A Supplier will be required to undertake the Preliminary and Final Design phase of the ISS sub-system and potential equipment, and process trials prior to delivery to site at Culham Science Centre.\nUpon completion of development trials, the system will undergo a Factory Acceptance Test (FAT) prior to site delivery. Installation, a Site Acceptance Test (SAT) in conjunction with supplier, and integration into the H3AT Tritium Loop will be carried out by the Systems Integrator/Integrated Control System contractor(s).\nAnticipated system description\nThe Isotope Separation System (ISS) separates a mixture of the six different Q2 (hydrogen) forms into streams containing predominantly H2 (protium), D2 (deuterium) and T2 (tritium) species. Cryo-distillation is the chosen technology. Cryodistillation exploits the small difference in volatility between the isotopes to achieve separation. The quantities of isotopologues of hydrogen – HD, HT and DT are reduced in the system using packed beds of catalyst, known as equilibriators. These are located in the streams between the 4 cryodistillation columns and promote the formation of H2, D2 and T2."
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryLocation": {
"description": "Culham Science Centre"
},
"deliveryAddresses": [
{
"region": "UKJ14"
}
],
"additionalClassifications": [
{
"id": "42123300",
"scheme": "CPV",
"description": "Compressors for refrigerating equipment"
},
{
"id": "42510000",
"scheme": "CPV",
"description": "Heat-exchange units, air-conditioning and refrigerating equipment, and filtering machinery"
},
{
"id": "42511000",
"scheme": "CPV",
"description": "Heat-exchange units and machinery for liquefying air or other gases"
},
{
"id": "42511100",
"scheme": "CPV",
"description": "Heat-exchange units"
},
{
"id": "42511110",
"scheme": "CPV",
"description": "Heat pumps"
},
{
"id": "42511200",
"scheme": "CPV",
"description": "Machinery for liquefying air or other gases"
},
{
"id": "42910000",
"scheme": "CPV",
"description": "Distilling, filtering or rectifying apparatus"
},
{
"id": "51100000",
"scheme": "CPV",
"description": "Installation services of electrical and mechanical equipment"
},
{
"id": "51110000",
"scheme": "CPV",
"description": "Installation services of electrical equipment"
},
{
"id": "51112000",
"scheme": "CPV",
"description": "Installation services of electricity distribution and control equipment"
},
{
"id": "51112100",
"scheme": "CPV",
"description": "Installation services of electricity distribution equipment"
},
{
"id": "51112200",
"scheme": "CPV",
"description": "Installation services of electricity control equipment"
},
{
"id": "51120000",
"scheme": "CPV",
"description": "Installation services of mechanical equipment"
},
{
"id": "51230000",
"scheme": "CPV",
"description": "Installation services of testing equipment"
},
{
"id": "51430000",
"scheme": "CPV",
"description": "Installation services of laboratory equipment"
},
{
"id": "51500000",
"scheme": "CPV",
"description": "Installation services of machinery and equipment"
},
{
"id": "51510000",
"scheme": "CPV",
"description": "Installation services of general-purpose machinery and equipment"
},
{
"id": "51800000",
"scheme": "CPV",
"description": "Installation services of metal containers"
},
{
"id": "51810000",
"scheme": "CPV",
"description": "Installation services of tanks"
},
{
"id": "71300000",
"scheme": "CPV",
"description": "Engineering services"
},
{
"id": "71320000",
"scheme": "CPV",
"description": "Engineering design services"
},
{
"id": "71323000",
"scheme": "CPV",
"description": "Engineering-design services for industrial process and production"
},
{
"id": "71330000",
"scheme": "CPV",
"description": "Miscellaneous engineering services"
},
{
"id": "71333000",
"scheme": "CPV",
"description": "Mechanical engineering services"
},
{
"id": "71334000",
"scheme": "CPV",
"description": "Mechanical and electrical engineering services"
},
{
"id": "71335000",
"scheme": "CPV",
"description": "Engineering studies"
},
{
"id": "71336000",
"scheme": "CPV",
"description": "Engineering support services"
},
{
"id": "71340000",
"scheme": "CPV",
"description": "Integrated engineering services"
},
{
"id": "71350000",
"scheme": "CPV",
"description": "Engineering-related scientific and technical services"
},
{
"id": "73000000",
"scheme": "CPV",
"description": "Research and development services and related consultancy services"
},
{
"id": "73100000",
"scheme": "CPV",
"description": "Research and experimental development services"
},
{
"id": "73120000",
"scheme": "CPV",
"description": "Experimental development services"
},
{
"id": "73300000",
"scheme": "CPV",
"description": "Design and execution of research and development"
},
{
"id": "73430000",
"scheme": "CPV",
"description": "Test and evaluation"
}
]
}
],
"title": "H3AT ISS",
"status": "planned",
"coveredBy": [
"GPA"
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "A Supplier will be required to undertake the Preliminary and Final Design phase of the ISS sub-system and potential equipment, and process trials prior to delivery to site at Culham Science Centre. The system will undergo a Factory Acceptance Test (FAT) prior to site delivery. Installation, a Site Acceptance Test (SAT) in conjunction with supplier, and integration into the H3AT Tritium Loop will be carried out by the Systems Integrator/Integrated Control System contractor(s). Anticipated system description The Isotope Separation System (ISS) separates a mixture of the six different Q2 (hydrogen) forms into streams containing predominantly H2 (protium), D2 (deuterium) and T2 (tritium) species. Cryo-distillation is the chosen technology. Cryodistillation exploits the small difference in volatility between the isotopes to achieve separation. The quantities of isotopologues of hydrogen – HD, HT and DT are reduced in the system using packed beds of catalyst, known as equilibriators.",
"communication": {
"futureNoticeDate": "2021-07-15T00:00:00+01:00"
},
"classification": {
"id": "51000000",
"scheme": "CPV",
"description": "Installation services (except software)"
},
"mainProcurementCategory": "services"
},
"parties": [
{
"id": "GB-FTS-1212",
"name": "United Kingdom Atomic Energy Authority",
"roles": [
"buyer"
],
"address": {
"region": "UKJ14",
"locality": "Abingdon",
"postalCode": "OX14 3DB",
"countryName": "United Kingdom",
"streetAddress": "Culham Science Centre"
},
"details": {
"url": "http://www.gov.uk/government/organisations/uk-atomic-energy-authority",
"buyerProfile": "https://uk.eu-supply.com/ctm/Company/CompanyInformation/Index/72814",
"classifications": [
{
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE",
"description": "Body governed by public law"
},
{
"scheme": "COFOG",
"description": "Fusion Research"
}
]
},
"identifier": {
"id": "N/A",
"legalName": "United Kingdom Atomic Energy Authority"
},
"contactPoint": {
"url": "https://uk.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=37407&B=UK",
"name": "Abigail Woods",
"email": "abigail.woods@ukaea.uk"
}
}
],
"language": "en",
"initiationType": "tender"
}