Official UK procurement notice
Guildhall Mechanical CWP Design - 3 lots
Authority: The Mayor and Commonalty and Citizens of the City of London (Local council)
What is being bought3 lots · detail below
Published requirement descriptionPlease note the assessment summaries were initially sent out on 28/11/2025, however, due to an administrative error, they are being re-issued to bidders on 28/01/26 to ensure alignment with the publication of this UK6 Contract Award Notice. Therefore, the standstill period will commence 28/01/26.
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: North Wing & 65 Basinghall/GJR; East Wing; West Wing. This will result in design and project management of the cyclical works projects across the Guildhall.
This tendering exercise is being undertaken using the electronic tendering system ‘City of London Corporation Sourcing & Contracts Portal’ (cityoflondon.ukp.app.jaggaer.com ↗). Suppliers will need to register an interest on the system in order to participate and registration is free.
The estimated contract value given at sections 31 and 32 is for the full duration of the contract including the maximum possible extensions. The estimated annual contract value is therefore Lot 1 - £200,000.00, Lot 2 - £200,000.00 and Lot 3 - £400,000.00).
The Consultant for each lot is to provide professional services as defined in the respective applicable part of Section 3 Lot 1, 2 or 3 of this brief.
The lots will be split according the following principles:
a. Lot 1 - North Wing & 65 Basinghall Street:
i. Generally the North Wing mechanical services are relatively modern, with plant maintained and upgraded since 2007 inter alia main AHUs upgraded in 2020, along with heating and BEMS upgrades between 2020 and 2024.
ii. Perimeter heating systems still require some control refinement. FCUs across the North Wing are due for replacement.
iii. Some design work has taken place to reduce cold spots.
iv. Heating pipework has had some remedial work taking place due to leaks developing on galvanised steel pipework and fittings.
v. Kitchen ventilation systems are due to be upgraded, which could realise energy savings and potentially rationalise the hydraulic arrangement with regards to air flows and interlocks.
vi. Domestic Hot Water Systems are to be replaced following capacity assessment along with shower valves in the Lower Ground Floor.
vii. The steam humidification system serving the main office was decommissioned some years ago. A design to reinstate a humidification system to the vent is to be provided, ideally retaining the existing AHU chassis, as these are not due for replacement.
viii. Overall, the plant replacement strategy has been to upgrade BEMS and now due to follow with emitters and make improvements along the way.
ix. Chillers and pumps have been replaced as part of a major works project, which is currently on-site.
x. 65 Basinghall Street is also known as Guildhall Justice Rooms or GJR.
xi. The old main CER room is located here and fed from the same chiller as the office area.
xii. The chiller is to be decommissioned, a replacement service is to be designed and provided. The CER
xiii. The FCUs serving GJR are noted as being difficult to service and have 3P valves which create a by-pass which adversely affects return temperatures back to Citigen.
b. Lot 2 – Guildhall Yard East (GYE)
i. There is currently a BEMS replacement project in pre-start phase with Sykes & Son on D&B contract.
ii. The Private part of the building is demised to the City Of London Police. There is a major refurbishment planned for this part of the building, which is currently in the design phase.
iii. Mechanical emitters are due for replacement across the Public side of the building.
iv. Pumps serving both Public and Private areas have recently been replaced.
v. AHUs serving the Public areas were upgraded in 2021 along with the BEMS that controls them.
vi. The general replacement/upgrade strategy for systems excluding the AHUs, is to replace and upgrade the emitters following on from the BEMS works.
c. Lot 3 – West Wing
i. Mechanical systems are beyond end of working life and controlling the environment is extremely and increasingly challenging for FM to manage.
ii. Systems need to be replaced and upgraded to achieve another 5 years of useful life, as a minimum.
iii. The BEMS is entirely on the legacy Continuum system and needs replacing.
iv. The chillers are life expired and currently due for replacement by connecting via PHX to North Wing under a separate project.
v. The proposed strategy for mechanical replacement and upgrades, is to undertake rationalisation of systems to allow mechanical plant, emitters and controls to be replaced system-by-system. Works should look to improve, rationalise and upgrade performance and control where possible.
vi. The West Wing is Grade II listed and classed as a High-Risk Building.
The Consultant M&E Engineer shall fulfil the Lead Function including BRPD and PM. They have the duty and responsibility of co-ordinating and integrating the work of the other Consultants employed on the project to maintain the Programme on all items of works. The other respective appointed Consultants will be responsible for the duties as defined in draft scope of service documents created by the Lead Consultant on an emergent basis. All consultants should be mindful of the interdependencies between disciplines and ensuring a smooth interface between co-dependent third parties. The COL Supervising Officer or Senior Principal Mechanical Engineer will take overall responsibility for design management and decision making across services.
CPV: Mechanical engineering services
How this dynamic market works
From the published notice- Type
- Dynamic market
- Bids received
- 6 bids on the busiest of 3 lots · 2 suppliers appointed
- Market period
- 3 yrs · up to 3 yrs 11 mo from 3 Nov 2025
Lots and requirements (3)Procurement structure
3 lots · all with a published value · win at most 2 of them · same conditions of participation on every lot · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £200,000: it is the dynamic market's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Guildhall - Mechanical Design Consultant – North WingAwardedRenewalceiling above
Lot 1
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: Lot 1 - North Wing; Lot 2 – Guildhall – Yard East; Lot 3 – Guildhall - West Wing. This will result in design and project management of the cyclical works projects across the Guildhall.
Bidders are encouraged to bid for all three lots. Bidders should be aware, that due to the volume of work in a relatively short space of time, that the intention is to award no more than two lots to any single bidder. Should a single bidder score highest against two lots, they will need to provide a resourcing plan to show how they plan to adequately provide services against two lots.
If the ‘Sourcing Plan’ is not accepted, the bidder in question will not be awarded that lot and will be awarded to the 2nd highest ranked bidder.
The duration of the contract is 3 years, subject to the right of the City (at its sole discretion) to exercise its right to extend the Contract by up to 1 year. The maximum length of the contract is therefore 4 years.
- Technical & professional ability
The tender comprises of three lots, which consists of bidders completing the following :
- Qualification Envelope - (if you are bidding for more than one lot you are only required to complete this once).
- Technical Quality Questions - complete specific questions for each lot.
- Responsible Procurement Questions - complete these two questions.
- Pricing Schedule - complete the pricing schedule relevant to each lot you are bidding for.
Lot #2Guildhall - Yard EastAwardedRenewalceiling above
Lot 2
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: Lot 1 - North Wing; Lot 2 – Guildhall – Yard East; Lot 3 – Guildhall - West Wing. This will result in design and project management of the cyclical works projects across the Guildhall.
Bidders are encouraged to bid for all three lots. Bidders should be aware, that due to the volume of work in a relatively short space of time, that the intention is to award no more than two lots to any single bidder. Should a single bidder score highest against two lots, they will need to provide a resourcing plan to show how they plan to adequately provide services against two lots.
If the ‘Sourcing Plan’ is not accepted, the bidder in question will not be awarded that lot and will be awarded to the 2nd highest ranked bidder.
The duration of the contract is 3 years, subject to the right of the City (at its sole discretion) to exercise its right to extend the Contract by up to 1 year. The maximum length of the contract is therefore 4 years.
- Technical & professional ability
The tender comprises of three lots, which consists of bidders completing the following :
- Qualification Envelope - (if you are bidding for more than one lot you are only required to complete this once).
- Technical Quality Questions - complete specific questions for each lot.
- Responsible Procurement Questions - complete these two questions.
- Pricing Schedule - complete the pricing schedule relevant to each lot you are bidding for.
Lot #3Guildhall - West WingAwardedRenewalPublished value£400,000
Lot 3
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: Lot 1 - North Wing; Lot 2 – Guildhall – Yard East; Lot 3 – Guildhall - West Wing. This will result in design and project management of the cyclical works projects across the Guildhall.
Bidders are encouraged to bid for all three lots. Bidders should be aware, that due to the volume of work in a relatively short space of time, that the intention is to award no more than two lots to any single bidder. Should a single bidder score highest against two lots, they will need to provide a resourcing plan to show how they plan to adequately provide services against two lots.
If the ‘Sourcing Plan’ is not accepted, the bidder in question will not be awarded that lot and will be awarded to the 2nd highest ranked bidder.
The duration of the contract is 3 years, subject to the right of the City (at its sole discretion) to exercise its right to extend the Contract by up to 1 year. The maximum length of the contract is therefore 4 years.
- Technical & professional ability
The tender comprises of three lots, which consists of bidders completing the following :
- Qualification Envelope - (if you are bidding for more than one lot you are only required to complete this once).
- Technical Quality Questions - complete specific questions for each lot.
- Responsible Procurement Questions - complete these two questions.
- Pricing Schedule - complete the pricing schedule relevant to each lot you are bidding for.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Technical Questions: 45%
- Responsible Procurement Questions: 15%
- Commercial: 40%
Published award criteria (3)
- Technical Questions: Q1 Relevant Experience & Lessons Learned (25%) Q2 Implementation Strategy (25%) Q3 Technical Scope Detail (25%) Q4 Conclusion and lot specific strategy (25%)
- Responsible Procurement Questions: Q1 Soft Landings (M&E) (50%) Q2 BAT Lot Specific (50%)
- Commercial: Pricing Schedule
- Technical & professional ability
The tender comprises of three lots, which consists of bidders completing the following :
- Qualification Envelope - (if you are bidding for more than one lot you are only required to complete this once).
- Technical Quality Questions - complete specific questions for each lot.
- Responsible Procurement Questions - complete these two questions.
- Pricing Schedule - complete the pricing schedule relevant to each lot you are bidding for.
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “Guildhall Mechanical CWP Design - 3 lots” is a dynamic market: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Dynamic market
- Who may use this agreement
- Any qualifying supplier may apply while the market is open
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 30 Apr 2025, 15:57 BST
- Last source update
- 28 Jan 2026, 16:22 GMT
- Award evaluation window
- Submission end – 27 Oct 2025
- FTS notice number
2025/S 000-048545- Latest notice
- Contract award notice (UK6)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-050a8eFind a Tender- Contract terms summary
As stated in the Terms & Conditions
How it was run
Official notice- Admission period ends
- 18 Sept 2025, 14:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Tenders must be submitted via the CoL Procurement Portyal (Jaggaer) link below:
Timeline
30 Apr 2025 → 6 Feb 2026 · 10 dates- Planning notice published30 Apr 2025, 15:57 BST
- Market engagement26 May 2025, 23:59 BST
This project will be for three lots, suppliers can apply for all three but will be limited to be appointed for only two lots.
The tender process will be under the Procurement Act 2023 - Competitive Flexible procedure using the two stage tender process.
If you are interested in particpating in the tender proces please request the Preliminer Market Engagement questionnire via email to me:
- Next notice expected2 Jun 2025, 23:59 BST
- Tender notice published13 Aug 2025, 16:51 BST
- Admission / appointment period ends398 days ago · period end, not a bid countdown18 Sept 2025, 14:00 BST
- Award decision expected by358 days ago27 Oct 2025, 23:59 GMT
- Contract starts352 days ago3 Nov 2025
- Assessment summaries sent266 days ago28 Jan 2026
- Latest notice published265 days ago28 Jan 2026, 16:22 GMT
- Standstill ends256 days ago6 Feb 2026, 23:59 GMT
Notice history
9 events · 4 releases on Find a Tender · since 30 Apr 2025- Preliminary market engagement notice published30 Apr 2025, 15:57 BSTUK2
- Preliminary market engagement notice published30 Apr 2025, 16:02 BSTUK2
- Tender notice published13 Aug 2025, 16:51 BSTUK4
- Status changed to active13 Aug 2025, 16:51 BST
- Procurement method changed13 Aug 2025, 16:51 BST
- Deadline published: 18 Sept 2025, 14:00 BST13 Aug 2025, 16:51 BST
- Contract award notice published28 Jan 2026, 16:22 GMTUK6
- Status changed to complete28 Jan 2026, 16:22 GMT
- Contract signature expected10 Feb 2026, 23:59 GMTscheduled
Routine re-releases (4)
- 2025-04: 1 release · 30 Apr 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Guildhall - Mechanical Design Consultant – North Wing1 award | |||
| Beveridge Associates Partnership LtdSME16 Feb 2026 – 30 May 2029 | £189,679 | 28 Nov 2025standstill to 6 Feb 2026 | Standstill |
| Lot 2 · Guildhall - Yard East1 award | |||
| Rybka LtdSME16 Feb 2026 – 30 May 2029 | £95,878 | 28 Nov 2025standstill to 6 Feb 2026 | Standstill |
| Lot 3 · Guildhall - West Wing1 award | |||
| Beveridge Associates Partnership LtdSME16 Feb 2026 – 30 May 2029 | £387,486 | 28 Nov 2025standstill to 6 Feb 2026 | Standstill |
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Guildhall - Mechanical Design Consultant – North Wing | 6final-stage tenders | 6 | 0 | — |
| 2 · Guildhall - Yard East | 6final-stage tenders | 6 | 0 | — |
| 3 · Guildhall - West Wing | 3final-stage tenders | 3 | 0 | — |
Contracting authority & participating public bodies
Suppliers admitted to the dynamic market
2 commercial parties on the notice- Beveridge Associates Partnership LtdAdmitted to the market
- Rybka LtdAdmitted to the market
Official documents & specifications (6)
Official links; attachments are not copiedNotices published for this procedure
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender