Official UK procurement notice
Gas , Plumbing and Heating - Corporate Landlord
Authority: Milton Keynes Council (Local council)
What is being bought
Published requirement descriptionMilton Keynes City Council are currently out to tender for the provision of Gas, Plumbing and Heating services to provide the services for the regular servicing and maintenance of gas systems, plumbing, hot water systems, and heat pumps across a portfolio of buildings. The aim is to ensure safety, compliance with regulations, and optimal performance of all systems for our corporate portfolio. This is being procured as an open tender.
- Recurrence: 2028
CPV: Gas appliance maintenance services · Heat pumps · Parts of heat pumps
The lotProcurement structure
single lot · no lot value publishedLot #1Milton Keynes City Council are out to tender for the provision of Gas Servicing,…Awarded
Milton Keynes City Council are out to tender for the provision of Gas Servicing, Plumbing, and Heat Pump Maintenance. this is being procured under the open procedure. Milton Keynes City Council (MKCC) manage a diverse property portfolio encompassing leisure, schools, commercial and corporate landlord stock. MKCC’s repair and maintenance obligations differ for the different stock types and leasehold responsibilities.For the Corporate Landlord stock (properties from which the council predominately offer their services) the Council has full maintenance responsibility including reactive, quoted, planned, best practice and statutory compliance obligation.MKCC operates an in-house Facilities Management Team, central to this function is the MKCC FM Helpdesk. The helpdesk operates a CAFM system called CIVICA, which is intrinsic to the success of our operation. It is a requirement that the successful supplier utilises CIVICA in delivery of this contract, therefore training will be provided during mobilisation.This tender package encompasses the following disciplines:A. Gas Installations and PlumbingB. Heat Pump Maintenance It is a mandatory requirement that -the successful contractor offers a 24/7 service. Please note that, out of hours calls will only be placed for genuine emergencies, and the successful contractor must have the capability to receive and respond to such calls.MKCC look to form a transparent and open relationship with all their appointed suppliers. This transparency requires all costs and performance data to be clearly visible on a site-by-site basis. It is our expectation that all activities will be tightly controlled by the successful contractor to ensure that all MKCC’s processes and procedures (as detailed in this tender package) are continually met.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 40
- Price: 60
- Suitability
As stated in procurement documents
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes · 2028
- First published
- 21 Jan 2025, 15:19 GMT
- Last source update
- 6 Aug 2025, 15:13 BST
- Award evaluation window
- 4 Apr 2025 – …
- Authority reference
2024-260- FTS notice number
2025/S 000-046596- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04d517Find a Tender
- Electronic trading
- electronic payment
- Performance terms
As stated in the procurement documents.
- Review procedure
The Council will incorporate a minimum 10 calendar day standstill period at the point information on the award of the Contract is communicated to tenderers. Applicants who are unsuccessful shall be informed by the Contracting Authority as soon as possible after the decision has been made as to the reasons why the Applicant was unsuccessful. Applicants may seek further clarification from the Contracting Authority following receipt of this information and the Contracting Authority will provide further clarification as appropriate. If any clarification regarding the award of the Contract has not been successfully resolved, an Applicant can consider its option under the Public Contracts Regulations 2015. Applicants would need to obtain their own legal advice.
Publisher note: £360,000 is maximum contract value including extensions
How it was run
Official notice- Submission deadline
- 4 Apr 2025, 12:00 BST
- Submission channel
- {"written"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
- Bids opened
- 4 Apr 2025, 12:00 BST
Timeline
4 Apr 2025 → 6 Aug 2025 · 3 dates- Submission deadline4 Apr 2025, 12:00 BST
- Bids opened4 Apr 2025, 12:00 BST
- Notice published6 Aug 2025, 15:13 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete6 Aug 2025, 15:13 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Village Heating LimitedSME | £360,000 † | — | Awarded |
Contracts
Gas Plumbing and Heating Corporate Landlord · Village Heating LimitedSME
- Signed
- 6 Aug 2025
- Value
- £360,000
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 14bids · 14 electronic | 12 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- High Court Royal Court of Justice, London WC24 2LLReview body
Bidders & participating suppliers
1 commercial party on the notice- Village Heating LimitedAwarded supplier
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria