Official UK procurement notice
FW Supply and install - Energy solutions, LED lighting - SGN
Authority: SCOTIA GAS NETWORKS LIMITED
What is being bought2 lots · detail below
Published requirement descriptionSGN are looking for a supplier to design, supply and replace non-LED lighting and control systems with LED, across all SGN sites, this will be split into Geographical Lots, (Scotland and Southern). The design should include for new installation of lighting while accounting for any required amendments to the existing system);
Full completion of the pre-start surveys as detailed further in the specification document.
The design and calculation of the replacement lighting installation in accordance with the relevant CIBSE Lighting Guide.
The removal, extension, or replacement of the existing non-LED lighting and control systems.
Extension of the LV power serving additional general and emergency lighting to achieve a compliant installation.
Installation of new LV power supplies to serve additional general and emergency lighting proposed to achieve a compliant installation.
Making good the building fabric to ensure a neat and tidy installation.
Remove all redundant equipment and materials from site. Where possible, recycling waste material and equipment
CPV: Lighting equipment and electric lamps
Lots and requirements (2)Procurement structure
2 lots · no lot values published · win at most 2 of themLot #1LED - Southern
Lot #2LED - Scotland
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
Should a candidate be successful SGN require them to register with the Utilities Vendor Database, Achilles (Achilles UVDB)
- “FW Supply and install - Energy solutions, LED lighting - SGN” is a framework: the contest is a place on its panel, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Goods
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 26 Oct 2022, 14:50 BST
- Last source update
- 26 Oct 2022, 14:50 BST
- FTS notice number
2022/S 000-030220- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-037c6aFind a Tender
How it was run
Official notice- Appointment period ends
- 28 Nov 2022, 12:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
Timeline
26 Oct 2022 → 28 Nov 2022 · 2 dates- Notice published26 Oct 2022, 14:50 BST
- Admission / appointment period endsperiod end, not a bid countdown28 Nov 2022, 12:00 GMT
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Southern Gas NetworksReview body
Official documents & specifications (1)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria