Find a TenderPlanned procurementPreliminary market engagement notice
Published 29 May 2026, 13:19 BST

Official UK procurement notice

Framework for Inspection and Maintenance of Underground Infrastructure

Authority: DfI Transport and Road Asset Management (TRAM) (Central government)

Framework agreementWorksBelow thresholdSME suitable
Planned pipeline valueValue not publishedpipeline notice, not a live tender
Tender notice expected Date not publishedfrom the planned procurement notice
Framework period 4 yrsends 18 Apr 2031 · starts 19 Apr 2027

What is being bought

Published requirement description

The Framework for Inspection and Maintenance of Underground Infrastructure will encompass three Measured Term Contracts to deliver underground inspection and maintenance in the following Contract Areas:

IMU1 – Greater Belfast Area

IMU2 – Coleraine, Omagh and Fermanagh Areas

IMU3 – Armagh & Lisburn Areas

Within each Contract Area, the works to be undertaken under this Contract may include, but not be limited to, the following Principal Work Activities which are provided by way of example:

A) Desilting of Culverts​

B) CCTV and Fly-through Surveys of Culverts​

C) Trenchless / Specialist Repairs of Culverts​

D) Traffic Management, Gaining Access to Culverts, Associated Civil Works

E) Small Scale Civil Works

F) Underground Man Entry Repairs

Within each Contract Area, the successful Supplier will be required to carry out any such works instructed by a Works Order, issued under the provisions of the Contract. Such works will require a standard of works delivery consistent with that defined in the Procurement Documents. Reimbursement to the successful Supplier for such works will be paid generally on the basis of an applicable Schedule of Rates and Prices (SoRP), adjusted in line with permitted price-fluctuation-factor provisions.

For each Contract Area, it is likely that the successful Supplier will be required to work at more than one location at any one time in order to meet the requirements of the programme of work for each Contract Area.

Successful Suppliers will be expected to have sufficiently skilled and available resources necessary to meet the requirements of such a programme and will be required to include in its rates and prices for the inevitable peaks and troughs that will be inherent in any such programme. Such peaks and troughs may result from a variety of circumstances, not all within the control of the Department.

The financial limits for individual Works Orders under this Contract shall generally be between £1 – £300,000 GBP.

CPV: Construction work for dams, canals, irrigation channels and aqueducts · Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork · Construction work for water projects · Construction work for waterways · Drainage works · Flood-defences maintenance works · River regulation and flood control works · Sewer survey services · Storm-water piping construction work · Works for complete or part construction and civil engineering work

How this framework works

From the published notice
Framework period
4 yrs from 19 Apr 2027

The lotProcurement structure

single lot · no lot value published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “Framework for Inspection and Maintenance of Underground Infrastructure” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How DfI Transport and Road Asset Management (TRAM) buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up

DfI Transport and Road Asset Management (TRAM)’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 8 of 17 known-size awards · market: CPV 4523 · UK-wide, n=144
47%55%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means the winner is registered in the region where that contract was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 12 of 12 known-location awards · market: CPV 4523 · UK-wide, n=158
100%56%

Most of this buyer’s recorded winners are registered in Northern Ireland.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 3 decided notices · market: CPV 4523 · UK-wide, n=38
49 days74 days

Half of these awards were announced within 49 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 0 of 2 procurements with awards had no recorded rival · market: CPV 4523 · UK-wide, n=50
0 of 212%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer19 lots with bid counts · broad CPV 45
0% had one bid
The market10 lots with bid counts · CPV 4523 · Northern Ireland
0% had one bid
Buyer / market · select a colour for counts
1 bid0% / 0%
Buyer: 0 of 19 lots with published bid counts. Market: 0 of 10 lots with published bid counts.
2–311% / 20%
Buyer: 2 of 19 lots with published bid counts. Market: 2 of 10 lots with published bid counts.
4–689% / 80%
Buyer: 17 of 19 lots with published bid counts. Market: 8 of 10 lots with published bid counts.
7+0% / 0%
Buyer: 0 of 19 lots with published bid counts. Market: 0 of 10 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 452348 monthsSME suitableEstimate not published
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 10 past lots.

A forecast, not a list of bidders.

—No model forecast yet0% single-bid risk
Past bids on 10 similar lots
1 bid0%
0 of 10 similar past lots received 1 bid (0%).
2–320%
2 of 10 similar past lots received 2–3 (20%).
4–680%
8 of 10 similar past lots received 4–6 (80%).
7+0%
0 of 10 similar past lots received 7+ (0%).
Comparable past lots usually drew 5 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Planned procurement
Procurement threshold
Below threshold
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
29 May 2026, 13:19 BST
Last source update
1 Jun 2026, 13:00 BST
Authority reference
T-1163
FTS notice number
2026/S 000-051370
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Construction work for dams, canals, irrigation channels and aqueductsConstruction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatworkConstruction work for water projectsConstruction work for waterwaysDrainage worksFlood-defences maintenance worksRiver regulation and flood control worksSewer survey servicesStorm-water piping construction workWorks for complete or part construction and civil engineering work
Delivery area
Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-06a8e2 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

29 May 2026 → 19 Apr 2027 · 4 dates
  1. Planning notice published146 days ago
    29 May 2026, 13:19 BST
  2. Latest notice published143 days ago
    1 Jun 2026, 13:00 BST
  3. Market engagement131 days ago
    12 Jun 2026, 23:59 BST

    DfI seeks to engage with the market to gather early insight from the market to help inform the development of our proposed requirements and future procurement approach.

    An online information session will be held on Friday 12 June 2026 at 11:00am.

    During this session, DfI will outline the proposed procurement approach, work scope and indicative delivery timelines for each framework.

    How to Register:

    To register your interest in attending, please email [email protected] by 5:00pm on Thursday 11 June 2026, including:

    The name(s) of attendee(s)

    Contact email address(es)

    Following receipt of expressions of interest, DfI will issue further details and instructions on how to join the PME briefing.

    Please note that the procurement description, estimated contract dates, publication timeline, and contract value are indicative only and should not be considered a final representation of DfI’s proposals or requirements.

    The PME pertains to a future contract opportunity which will be advertised in its own right in due course. This notice is not a call for competition to procure any works or services.

    Interested parties will not be prejudiced by any response, or lack thereof, to this notice. Nor shall a response to this notice guarantee an opportunity to participate in this market engagement exercise or any future procurement process that DfI may conduct.

    DfI is not liable for any costs, fees or expenses incurred by any party responding to this notice or any party who may participate in the market engagement exercise.

  4. Today
    22 Oct 2026
  5. Contract startsin 179 days
    19 Apr 2027, 00:00 BST

Notice history

2 events · 2 releases on Find a Tender · since 29 May 2026
  1. Preliminary market engagement notice published
    29 May 2026, 13:19 BST
    UK2
  2. Preliminary market engagement notice published
    1 Jun 2026, 13:00 BST
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

DfI Transport and Road Asset Management (TRAM)

Contracting authorityPublic authority - central governmentNorthern Irish devolved regulations apply GB-PPON: PYQH-8789-DZPG James House, 2-4 Cromac Avenue, Belfast, Northern Ireland, BT7 2JAContact email

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure