← Back to search results

AwardedFind a Tender · award
BuyerTHE UNIVERSITY OF BIRMINGHAM
StatusAwarded
DeadlineNot published
ValueValue not published
Published21 Feb 2024

What is being bought

The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall. The University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots: • Lot 1 - PA System • Lot 2 - Mixing Console & Stage Boxes • Lot 3 - Lighting Systems

Delivery location

UKG31 · UKG31 · UKG31

Categories

Lighting systems 31527260Audio-visual equipment 32321200Studio mixing console 32342420Audio-visual equipment 32321200

Lot details

PA System

Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. For the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). Any system design will need to integrate with the above existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.

Statuscancelled

Award criteria
Compliance to the Specification — 20
Aftersales and Technical Back-up — 20
Delivery, Installation, and Training — 15
Sustainability and Environmental — 5
Standard Supplier Questionnaire — 10
price — 30

Mixing Console & Stage Boxes

Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. We require any console supplied to be compatible with the existing equipment. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.

Statuscancelled

Award criteria
Compliance to the Specification — 20
Aftersales and Technical Back-up — 20
Delivery, Installation and Training — 15
Sustainability and Environmental — 5
Standard Supplier Questionnaire — 10
price — 30

Lighting System

Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. The University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall. The Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx The concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system. New requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected. The profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. Please note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. Equipment will need to be delivered, received, and installed by no later than 14th January 2024.

Statuscancelled

Award criteria
Compliance to the Specification — 20
Aftersales and Technical Back-up — 20
Delivery, Installation, and Training — 15
Sustainability and Environmental — 5
price — 30

What is included

ItemCategoryQuantity
1Audio-visual equipmentNot published
2Studio mixing consoleNot published
3Lighting systemsNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 31. The category anchor is Lighting systems (31527260); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 312,7085 median · 49.4 average (953 of 2,708 with a bid count)5.7 average (1,126 of 2,708 with named award suppliers)Not published
Same buyer11 median · 1 average (1 of 1 with a bid count)1 average (1 of 1 with named award suppliers)Not published
Delivery region: UKG3192 median · 2.6 average (5 of 9 with a bid count)1 average (5 of 9 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

Mixing Console & Stage Boxes

Statusactive
Value£40,004

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-03edec
Latest release ID005675-2024
Latest release timestampWed Feb 21 2024 14:03:56 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodopen
Procurement method detailsOpen procedure
Main procurement categorygoods
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source3
Tender items in source3
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
21 Feb 2024award, contract005675-2024
21 Feb 2024award, contract005665-2024
14 Aug 2023tenderUpdate023697-2023
8 Aug 2023tender023084-2023

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "005675-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "2",
        "value": 6,
        "measure": "bids"
      }
    ]
  },
  "date": "2024-02-21T14:03:56Z",
  "ocid": "ocds-h6vhtk-03edec",
  "buyer": {
    "id": "GB-COH-RC000645",
    "name": "THE UNIVERSITY OF BIRMINGHAM"
  },
  "awards": [
    {
      "id": "005675-2024-1",
      "title": "Mixing Console & Stage Boxes",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-13771164",
          "name": "22live Limited"
        }
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-03edec",
    "lots": [
      {
        "id": "1",
        "title": "PA System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system. New requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nFor the PA System, the University currently owns a stock of various D&B Audiotechnik\nspeakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for\nfront/side/foldback fills as required, and a small stock of monitor wedges (M6).\nAny system design will need to integrate with the above existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "Mixing Console & Stage Boxes",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via\nDante.\nWe require any console supplied to be compatible with the existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "Lighting System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe profile fixtures which the University currently owns are ETC Source 4's, and any\nreplacement fixtures supplied must retain compatibility with our current lens stock.\nPlease note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall\nas compatibility with our current stage and control room panels may or may not be possible\ndepending on the solutions offered.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32321200",
            "scheme": "CPV",
            "description": "Audio-visual equipment"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32342420",
            "scheme": "CPV",
            "description": "Studio mixing console"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "31527260",
            "scheme": "CPV",
            "description": "Lighting systems"
          }
        ]
      }
    ],
    "title": "FRAM833/23",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The University would like to establish a contract for the supply and installation of an\nequipment upgrade within the Elgar Concert Hall.\nThe University's procurement will consist of three Lots as detailed below, and at its\ndiscretion will award a contract to a single supplier for all Lots, or a different supplier for\neach of the Lots:\n• Lot 1 - PA System\n• Lot 2 - Mixing Console & Stage Boxes\n• Lot 3 - Lighting Systems",
    "classification": {
      "id": "32321200",
      "scheme": "CPV",
      "description": "Audio-visual equipment"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "goods",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-COH-RC000645",
      "name": "THE UNIVERSITY OF BIRMINGHAM",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG31",
        "locality": "BIRMINGHAM",
        "postalCode": "B152TT",
        "countryName": "United Kingdom",
        "streetAddress": "Edgbaston"
      },
      "details": {
        "url": "https://intranet.birmingham.ac.uk/index.aspx",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "09",
            "scheme": "COFOG",
            "description": "Education"
          }
        ]
      },
      "identifier": {
        "id": "RC000645",
        "scheme": "GB-COH",
        "legalName": "THE UNIVERSITY OF BIRMINGHAM"
      },
      "contactPoint": {
        "name": "Graham Price",
        "email": "g.a.price@bham.ac.uk"
      }
    },
    {
      "id": "GB-COH-13771164",
      "name": "22live Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Redditch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "13771164",
        "scheme": "GB-COH",
        "legalName": "22live Limited"
      }
    },
    {
      "id": "GB-FTS-73658",
      "name": "University of Birmingham",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Edgbaston",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "University of Birmingham"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "005675-2024-1",
      "title": "Mixing Console & Stage Boxes",
      "value": {
        "amount": 40003.8,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "005675-2024-1",
      "dateSigned": "2023-11-17T00:00:00Z"
    }
  ],
  "initiationType": "tender"
}
Complete JSON history (4 releases)
21 Feb 2024 · 005675-2024 · award, contract
{
  "id": "005675-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "2",
        "value": 6,
        "measure": "bids"
      }
    ]
  },
  "date": "2024-02-21T14:03:56Z",
  "ocid": "ocds-h6vhtk-03edec",
  "buyer": {
    "id": "GB-COH-RC000645",
    "name": "THE UNIVERSITY OF BIRMINGHAM"
  },
  "awards": [
    {
      "id": "005675-2024-1",
      "title": "Mixing Console & Stage Boxes",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-13771164",
          "name": "22live Limited"
        }
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-03edec",
    "lots": [
      {
        "id": "1",
        "title": "PA System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system. New requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nFor the PA System, the University currently owns a stock of various D&B Audiotechnik\nspeakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for\nfront/side/foldback fills as required, and a small stock of monitor wedges (M6).\nAny system design will need to integrate with the above existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "Mixing Console & Stage Boxes",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via\nDante.\nWe require any console supplied to be compatible with the existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "Lighting System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe profile fixtures which the University currently owns are ETC Source 4's, and any\nreplacement fixtures supplied must retain compatibility with our current lens stock.\nPlease note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall\nas compatibility with our current stage and control room panels may or may not be possible\ndepending on the solutions offered.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32321200",
            "scheme": "CPV",
            "description": "Audio-visual equipment"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32342420",
            "scheme": "CPV",
            "description": "Studio mixing console"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "31527260",
            "scheme": "CPV",
            "description": "Lighting systems"
          }
        ]
      }
    ],
    "title": "FRAM833/23",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The University would like to establish a contract for the supply and installation of an\nequipment upgrade within the Elgar Concert Hall.\nThe University's procurement will consist of three Lots as detailed below, and at its\ndiscretion will award a contract to a single supplier for all Lots, or a different supplier for\neach of the Lots:\n• Lot 1 - PA System\n• Lot 2 - Mixing Console & Stage Boxes\n• Lot 3 - Lighting Systems",
    "classification": {
      "id": "32321200",
      "scheme": "CPV",
      "description": "Audio-visual equipment"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "goods",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-COH-RC000645",
      "name": "THE UNIVERSITY OF BIRMINGHAM",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG31",
        "locality": "BIRMINGHAM",
        "postalCode": "B152TT",
        "countryName": "United Kingdom",
        "streetAddress": "Edgbaston"
      },
      "details": {
        "url": "https://intranet.birmingham.ac.uk/index.aspx",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "09",
            "scheme": "COFOG",
            "description": "Education"
          }
        ]
      },
      "identifier": {
        "id": "RC000645",
        "scheme": "GB-COH",
        "legalName": "THE UNIVERSITY OF BIRMINGHAM"
      },
      "contactPoint": {
        "name": "Graham Price",
        "email": "g.a.price@bham.ac.uk"
      }
    },
    {
      "id": "GB-COH-13771164",
      "name": "22live Limited",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKG12",
        "locality": "Redditch",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "13771164",
        "scheme": "GB-COH",
        "legalName": "22live Limited"
      }
    },
    {
      "id": "GB-FTS-73658",
      "name": "University of Birmingham",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Edgbaston",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "University of Birmingham"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "005675-2024-1",
      "title": "Mixing Console & Stage Boxes",
      "value": {
        "amount": 40003.8,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "005675-2024-1",
      "dateSigned": "2023-11-17T00:00:00Z"
    }
  ],
  "initiationType": "tender"
}
21 Feb 2024 · 005665-2024 · award, contract
{
  "id": "005665-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 6,
        "measure": "bids"
      }
    ]
  },
  "date": "2024-02-21T13:25:43Z",
  "ocid": "ocds-h6vhtk-03edec",
  "buyer": {
    "id": "GB-COH-RC000645",
    "name": "THE UNIVERSITY OF BIRMINGHAM"
  },
  "awards": [
    {
      "id": "005665-2024-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-OC383379",
          "name": "SOUTHBY PRODUCTIONS LLP"
        }
      ]
    }
  ],
  "tender": {
    "id": "ocds-h6vhtk-03edec",
    "lots": [
      {
        "id": "1",
        "title": "PA System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nFor the PA System, the University currently owns a stock of various D&B Audiotechnik\nspeakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for\nfront/side/foldback fills as required, and a small stock of monitor wedges (M6).\nAny system design will need to integrate with the above existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "2",
        "title": "Mixing Console & Stage Boxes",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an\nextension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via\nDante.\nWe require any console supplied to be compatible with the existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      },
      {
        "id": "3",
        "title": "Lighting System",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University\nof Birmingham. The University has a strong in-house Audio-Visual team that sets design\nstandards applicable throughout the institution, handles most design and sign-off tasks,\nprovides professional advice, and maintains a large collection of over 350 spaces.\nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the\nexisting equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened\nits doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall)\ndesigned by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony\nHall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further\ninformation, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging\nfrom solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector\nvideo and music-theatre presentations, and the electroacoustic studios' 100-channel sound\ndiffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within\nthe Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and\ninstallation or configuration will take place during the University's Christmas closed period,\nto ensure teaching is not affected.\nThe profile fixtures which the University currently owns are ETC Source 4's, and any\nreplacement fixtures supplied must retain compatibility with our current lens stock.\nPlease note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall\nas compatibility with our current stage and control room panels may or may not be possible\ndepending on the solutions offered.\nEquipment will need to be delivered, received, and installed by no later than 14th January\n2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32321200",
            "scheme": "CPV",
            "description": "Audio-visual equipment"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32342420",
            "scheme": "CPV",
            "description": "Studio mixing console"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "31527260",
            "scheme": "CPV",
            "description": "Lighting systems"
          }
        ]
      }
    ],
    "title": "Tender for the Supply and Installation of AV Equipment for the Elgar Concert Hall at the University of Birmingham",
    "status": "complete",
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The University would like to establish a contract for the supply and installation of an\nequipment upgrade within the Elgar Concert Hall.\nThe University's procurement will consist of three Lots as detailed below, and at its\ndiscretion will award a contract to a single supplier for all Lots, or a different supplier for\neach of the Lots:\n• Lot 1 - PA System\n• Lot 2 - Mixing Console & Stage Boxes\n• Lot 3 - Lighting Systems",
    "classification": {
      "id": "32321200",
      "scheme": "CPV",
      "description": "Audio-visual equipment"
    },
    "procurementMethod": "open",
    "mainProcurementCategory": "goods",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-COH-RC000645",
      "name": "THE UNIVERSITY OF BIRMINGHAM",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG31",
        "locality": "BIRMINGHAM",
        "postalCode": "B152TT",
        "countryName": "United Kingdom",
        "streetAddress": "Edgbaston"
      },
      "details": {
        "url": "https://intranet.birmingham.ac.uk/index.aspx",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "09",
            "scheme": "COFOG",
            "description": "Education"
          }
        ]
      },
      "identifier": {
        "id": "RC000645",
        "scheme": "GB-COH",
        "legalName": "THE UNIVERSITY OF BIRMINGHAM"
      },
      "contactPoint": {
        "name": "Graham Price",
        "email": "g.a.price@bham.ac.uk"
      }
    },
    {
      "id": "GB-COH-OC383379",
      "name": "SOUTHBY PRODUCTIONS LLP",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKI7",
        "locality": "High Wycombe",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "OC383379",
        "scheme": "GB-COH",
        "legalName": "SOUTHBY PRODUCTIONS LLP"
      }
    },
    {
      "id": "GB-FTS-73658",
      "name": "University of Birmingham",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Edgbaston",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "University of Birmingham"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "005665-2024-1",
      "value": {
        "amount": 323346.04,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "005665-2024-1",
      "dateSigned": "2023-11-29T00:00:00Z"
    }
  ],
  "initiationType": "tender"
}
14 Aug 2023 · 023697-2023 · tenderUpdate
{
  "id": "023697-2023",
  "tag": [
    "tenderUpdate"
  ],
  "date": "2023-08-14T12:38:00+01:00",
  "ocid": "ocds-h6vhtk-03edec",
  "buyer": {
    "id": "GB-COH-RC000645",
    "name": "THE UNIVERSITY OF BIRMINGHAM"
  },
  "tender": {
    "id": "FRAM833/23",
    "title": "Tender for the Supply and Installation of AV Equipment for the Elgar Concert Hall at the University of Birmingham",
    "amendments": [
      {
        "id": "1",
        "unstructuredChanges": [
          {
            "where": {
              "label": "Estimated Total Vale",
              "section": "II.1.5"
            },
            "newValue": {
              "text": "Value excluding VAT: £360,000"
            },
            "oldValue": {
              "text": "Value Excluding VAT: £450,000"
            }
          }
        ]
      }
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall.\nThe University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots:\n•\tLot 1 - PA System\n•\tLot 2 - Mixing Console & Stage Boxes\n•\tLot 3 - Lighting Systems",
    "classification": {
      "id": "32321200",
      "scheme": "CPV",
      "description": "Audio-visual equipment"
    },
    "mainProcurementCategory": "goods"
  },
  "parties": [
    {
      "id": "GB-COH-RC000645",
      "name": "THE UNIVERSITY OF BIRMINGHAM",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG31",
        "locality": "BIRMINGHAM",
        "postalCode": "B152TT",
        "countryName": "United Kingdom",
        "streetAddress": "EDGBASTON"
      },
      "details": {
        "url": "https://intranet.birmingham.ac.uk/index.aspx"
      },
      "identifier": {
        "id": "RC000645",
        "scheme": "GB-COH",
        "legalName": "THE UNIVERSITY OF BIRMINGHAM"
      },
      "contactPoint": {
        "name": "Rachel Price",
        "email": "r.e.price.1@bham.ac.uk"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
8 Aug 2023 · 023084-2023 · tender
{
  "id": "023084-2023",
  "tag": [
    "tender"
  ],
  "date": "2023-08-08T14:23:06+01:00",
  "ocid": "ocds-h6vhtk-03edec",
  "buyer": {
    "id": "GB-COH-RC000645",
    "name": "THE UNIVERSITY OF BIRMINGHAM"
  },
  "tender": {
    "id": "FRAM833/23",
    "lots": [
      {
        "id": "1",
        "title": "PA System",
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. \nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected.\nFor the PA System, the University currently owns a stock of various D&B Audiotechnik speakers (E12, E8, E6, E3, V10P, B6, B4) and amplifiers (D12, D6, D40, EPac), used for front/side/foldback fills as required, and a small stock of monitor wedges (M6). \nAny system design will need to integrate with the above existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January 2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2024-01-14T23:59:59Z",
          "startDate": "2023-10-23T00:00:00+01:00"
        },
        "submissionTerms": {
          "variantPolicy": "allowed"
        }
      },
      {
        "id": "2",
        "title": "Mixing Console & Stage Boxes",
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. \nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected.\nThe University currently owns a Yamaha CL3 with associated RIO stageboxes, connected via Dante. \nWe require any console supplied to be compatible with the existing equipment.\nEquipment will need to be delivered, received, and installed by no later than 14th January 2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2024-01-14T23:59:59Z",
          "startDate": "2023-10-23T00:00:00+01:00"
        },
        "submissionTerms": {
          "variantPolicy": "allowed"
        }
      },
      {
        "id": "3",
        "title": "Lighting System",
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "Audio Visual is a key component in delivering good teaching and operations at the University of Birmingham. The University has a strong in-house Audio-Visual team that sets design standards applicable throughout the institution, handles most design and sign-off tasks, provides professional advice, and maintains a large collection of over 350 spaces. \nThe University requires a supplier of Audio-Visual kit who can provide an upgrade for the existing equipment installed within the Elgar Concert Hall.\nThe Elgar Concert Hall is situated within the University's Bramall Music Building, which is an extension of the Aston Webb Building, and sits alongside the Great Hall. The Bramall opened its doors in June 2012 and includes a 450-seat concert hall (The Elgar Concert Hall) designed by renowned acoustician Nicholas Edwards of Acoustic Dimensions (Symphony Hall Birmingham, Symphony Centre Dallas, Royal Shakespeare Theatre). For further information, please visit: https://www.birmingham.ac.uk/bramall/index.aspx\nThe concert hall and its acoustics can be configured for rehearsals and performances ranging from solo recitals to full symphony orchestra, 200-strong University Choir, multi-projector video and music-theatre presentations, and the electroacoustic studios' 100-channel sound diffusion system.\nNew requirements for the upgrade will need to be compatible with existing equipment within the Elgar Concert Hall, and it is a mandatory requirement that delivery of equipment and installation or configuration will take place during the University's Christmas closed period, to ensure teaching is not affected.\nThe profile fixtures which the University currently owns are ETC Source 4's, and any replacement fixtures supplied must retain compatibility with our current lens stock. \nPlease note: We recommend suppliers utilise the opportunity to visit the Elgar Concert Hall as compatibility with our current stage and control room panels may or may not be possible depending on the solutions offered. \nEquipment will need to be delivered, received, and installed by no later than 14th January 2024.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Compliance to the Specification",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Aftersales and Technical Back-up",
              "type": "quality",
              "description": "20"
            },
            {
              "name": "Delivery, Installation, and Training",
              "type": "quality",
              "description": "15"
            },
            {
              "name": "Sustainability and Environmental",
              "type": "quality",
              "description": "5"
            },
            {
              "name": "Standard Supplier Questionnaire",
              "type": "quality",
              "description": "10"
            },
            {
              "type": "price",
              "description": "30"
            }
          ]
        },
        "contractPeriod": {
          "endDate": "2024-01-14T23:59:59Z",
          "startDate": "2023-10-23T00:00:00+01:00"
        },
        "submissionTerms": {
          "variantPolicy": "allowed"
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32321200",
            "scheme": "CPV",
            "description": "Audio-visual equipment"
          }
        ]
      },
      {
        "id": "2",
        "relatedLot": "2",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "32342420",
            "scheme": "CPV",
            "description": "Studio mixing console"
          }
        ]
      },
      {
        "id": "3",
        "relatedLot": "3",
        "deliveryAddresses": [
          {
            "region": "UKG31"
          }
        ],
        "additionalClassifications": [
          {
            "id": "31527260",
            "scheme": "CPV",
            "description": "Lighting systems"
          }
        ]
      }
    ],
    "title": "Tender for the Supply and Installation of AV Equipment for the Elgar Concert Hall at the University of Birmingham",
    "value": {
      "amount": 450000,
      "currency": "GBP"
    },
    "status": "active",
    "coveredBy": [
      "GPA"
    ],
    "bidOpening": {
      "date": "2023-09-08T12:01:00+01:00"
    },
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "lotDetails": {
      "maximumLotsBidPerSupplier": null
    },
    "awardPeriod": {
      "startDate": "2023-09-08T12:01:00+01:00"
    },
    "description": "The University would like to establish a contract for the supply and installation of an equipment upgrade within the Elgar Concert Hall.\nThe University's procurement will consist of three Lots as detailed below, and at its discretion will award a contract to a single supplier for all Lots, or a different supplier for each of the Lots:\n•\tLot 1 - PA System\n•\tLot 2 - Mixing Console & Stage Boxes\n•\tLot 3 - Lighting Systems",
    "tenderPeriod": {
      "endDate": "2023-09-08T12:00:00+01:00"
    },
    "hasRecurrence": false,
    "classification": {
      "id": "32321200",
      "scheme": "CPV",
      "description": "Audio-visual equipment"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ]
    },
    "submissionMethod": [
      "electronicSubmission"
    ],
    "procurementMethod": "open",
    "mainProcurementCategory": "goods",
    "submissionMethodDetails": "https://in-tendorganiser.co.uk/universityofbirmingham/aspx/",
    "procurementMethodDetails": "Open procedure"
  },
  "parties": [
    {
      "id": "GB-COH-RC000645",
      "name": "THE UNIVERSITY OF BIRMINGHAM",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG31",
        "locality": "BIRMINGHAM",
        "postalCode": "B152TT",
        "countryName": "United Kingdom",
        "streetAddress": "EDGBASTON"
      },
      "details": {
        "url": "https://intranet.birmingham.ac.uk/index.aspx",
        "classifications": [
          {
            "id": "BODY_PUBLIC",
            "scheme": "TED_CA_TYPE",
            "description": "Body governed by public law"
          },
          {
            "id": "09",
            "scheme": "COFOG",
            "description": "Education"
          }
        ]
      },
      "identifier": {
        "id": "RC000645",
        "scheme": "GB-COH",
        "legalName": "THE UNIVERSITY OF BIRMINGHAM"
      },
      "contactPoint": {
        "url": "https://in-tendorganiser.co.uk/universityofbirmingham/aspx/",
        "name": "Rachel Price",
        "email": "r.e.price.1@bham.ac.uk"
      }
    },
    {
      "id": "GB-FTS-18346",
      "name": "University of Birmingham",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Birmingham",
        "postalCode": "B15 2TT",
        "countryName": "United Kingdom"
      },
      "identifier": {
        "legalName": "University of Birmingham"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}