Find a Tender
complete
Official procurement procedure
Contract for the Maintenance of BIFoR Systems to the University of Birmingham
Fuel-gas systems
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: UNIVERSITY OF BIRMINGHAM: "Contract for the Maintenance of BIFoR Systems to the University of Birmingham". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | UNIVERSITY OF BIRMINGHAM | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: UNIVERSITY OF BIRMINGHAM
Market Analytics
Derived from OCDS awards & bid statistics
Published history for UNIVERSITY OF BIRMINGHAM. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
1.5Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 11 active published awards; 4 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityUNIVERSITY OF BIRMINGHAM | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published26 May 2021, 11:45 BST | Last source update26 May 2021, 11:45 BST | Recurring procurementNot published |
ClassificationFuel-gas systems | ||
Delivery area | ||
OCIDocds-h6vhtk-02b528 | ||
What is being bought
The works consist of statutory and reactive maintenance of a liquid and gas CO2 storage and distribution system owned by the University of Birmingham, over a period of five years.
What changed
From the official release history
- Status changed to complete
26 May 2021, 11:45 BST - Official notice release published
26 May 2021, 11:45 BST - Buyer information updated
26 May 2021, 11:45 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedStatus not publishedPublished valueNot publishedThe Birmingham Institute of Forest Research's (BIFoR) Free Air Carbon dioxide Enrichment (FACE) experiment in Staffordshire, UK is designed to provide the scientific community with a new understanding of how mature oak woodlands will respond to a future climate with higher levels of carbon dioxide (CO2) in the atmosphere than exist at present. The experiment will expose large areas of woodland to elevated atmospheric CO2 at around 550 parts per million (ppm), which is the level we expect to reach by 2050. The experiment consists of six arrays of towers within a woodland, each 30 m across, which extend from the ground to the top of the trees. CO2 will be released within three of these rings, while the other three will act as control plots and receive ambient air only. Carbon dioxide is be stored in 3 x 40,000kg capacity Storage Vessels under pressure as a liquid. The liquid CO2 is converted to a gas using ambient heat vaporisers and transported in pipes through the woodland to the experimental arrays. Here, it is diluted with normal air until the level reaches ~550 ppm before being released into the research space. Sensors within the array are used by a computer to automatically adjust the amount and direction of released CO2 according to the speed and direction of the wind. The University of Birmingham intends to award a contract for up to five years for the maintenance and calibration of the CO2 storage and delivery system at the facility. The works consist of statutory and reactive maintenance and the entire system is owned and managed by the University of Birmingham. A scheme of works has been developed that covers maintenance, calibration and statutory compliance over a five year period. Stardelta Power and Control are considered to be the preferred supplier after providing these services for the previous five year period. The FACE experimental set up is bespoke in nature and unusual in the industrial market as the University owns the infrastructure. The normal mode of operation is to rent/hire such gas storage and distribution systems. The owner of the gas storage and delivery infrastructure would then in turn manage the maintenance, calibration and statutory compliance requirements. These arrangements are normally internal. For this reason it previously proved very difficult to identify companies with the requisite skills and resources to tender for the University owned BIFoR FACE facility. The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
26 May 2021, 11:45 BST - Award active
Not published · Not published - Contract active
Signed 19 May 2021, 00:00 BST · £172,710
Commercial outcome and competition
Awards Stardelta Power & Control Not published · Not published · active |
Contracts Contract £172,710 · signed 19 May 2021, 00:00 BST · active |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
UNIVERSITY OF BIRMINGHAM
Contracting authority GB-FTS-7157Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleThe University of Birmingham has made a considerable financial investment in procuring and installing the CO2 storage and distribution system at the Birmingham Institute of Forest Research (BIFoR) Free Air Carbon Dioxide Enrichment (FACE) facility. The equipment installed is standard equipment used across the commercial CO2 sector. However, the actual ownership of such equipment is unusual in the UK market especially for the industrial application of bulk gases by the user. The more common agreement is that the bulk gas supplier, in this case liquid CO2, also rents the storage vessels and distribution system to the client. The supplier then covers the maintenance, repairs and calibrations under the rental agreement. Due to the Universities unusual situation, very few companies with the requisite skills and technical capability are available to undertake such a contract as that on offer.
The University has an established relationship with Stardelta Power and Control who currently conduct the maintenance and calibration schedule of works while also providing a 24 hour repair service for ad hoc requirements. This supplier has proven to be reliable, efficient and cost effective. Further, Stardelta Power and Control are fully aware and respectful of the site requirements. The BIFoR FACE facility is situated within a woodland that is designed to mimic a non-intervention site and is considered pristine. It would be considered an unnecessary risk to introduce a new supplier at this stage of the experiment (half way through a decadal plan) to conduct heavy engineering works and invasive practices, especially considering the existing human resources available to supervise such activities.
The University has identified that for reasons of timescale and to achieve its aims within available staff capacity and alongside its core business activities, the products supplied by Stardelta Power and Control are the only ones capable of meeting the University's requirements and this is the only viable option for the University at this time. |