Find a TenderAwarded without competition
Published 4 Apr 2024, 15:05 BST

Official UK procurement notice

Contract Extension - LB Hillngdon - Highways Term Service Contract

Official notice

Authority: London Borough of Hillingdon (Local council)

WorksAward procedure without prior publication of a call for competition
Awarded value£25,000,000published contract · exc. VAT
Awarded 30 Dec 2013no call for competition
Awarded to O' Hara Bros Surfacing Limited

What is being bought

Published requirement description

The London Borough of Hillingdon (the Authority) intends to enter into contract extension with O’ Hara Bros Surfacing Limited in relation to a Highways Term Service Contract for highways management and maintenance works (resurfacing of footways, carriageways and pothole repairs, drainage works and street furniture installation), the Underlying Contracts). The Underlying Contracts were originally procured under OJEU Contract Notice 2013/S 127-217050, published on 28 June 2013.

CPV: Carriageway resurfacing works · Construction work for highways · Construction work for highways, roads · Construction, foundation and surface works for highways, roads · Cycle path construction work · Drainage works · Footpath construction work · Foundation work for footpaths · Gully cleaning and emptying services · Gully emptiers · Highway maintenance work · Paving and asphalting works · +7 more

The lotProcurement structure

single lot · no lot value published
Lot #1The Authority appointed the Contractor to provide highways maintenance services…

The Authority appointed the Contractor to provide highways maintenance services pursuant to the Highways Term Service Contract

The Authority intends to enter a deed of contract extension with the Contractor to extend the Highways Term Service Contracts, the effect of which will be the following:

  • Highway management and maintenance (resurfacing of footways and carriageways, pothole repairs and drainage works),
  • Highway improvement works), town centre improvement, minor bridge maintenance, public realm investment projects,
  • Cyclic gully cleansing, residential vehicular crossovers & reactive maintenance and task order works instructed on an ad-hoc basis.
  • To extend the expiry date to 31 March 2026
Delivery: London

Procedure terms & legal framework

From the official record
Procedure method
Award procedure without prior publication of a call for competition
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded without competition
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Direct award (no call for competition)
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
4 Apr 2024, 15:05 BST
Last source update
4 Apr 2024, 15:05 BST
FTS notice number
2024/S 000-010973
Classification (CPV)
Carriageway resurfacing worksConstruction work for highwaysConstruction work for highways, roadsConstruction, foundation and surface works for highways, roadsCycle path construction workDrainage worksFootpath construction workFoundation work for footpathsGully cleaning and emptying servicesGully emptiers
+9 moreHighway maintenance workPaving and asphalting works
Delivery area
London (UKI74)
Official registry OCID
ocds-h6vhtk-044fa5 Find a Tender
Why no open competition
The procurement falls outside the scope of application of the directive
Published justification

This VTN gives notice that the Authority is entering into a deed of extension (the "Contract") to extend the duration of the existing highways term service contract between the Authority and the Contractor.

The extension does not seek to introduce new requirements, amendments to the commercial terms or the intended scope of works to be provided under the Term Service Contract and are to be delivered in the same geographical location as the current contract. This will continue as currently drafted (NEC 3 Term Service Contract (June 2005) (with amendments April 2013).

A procurement procedure is not necessary on the basis that the award of the Contract is permitted pursuant to

Regulation 72 (1) (e) and 72(8) of the Public Contracts Regulations 2015.The Contract will have the effect of modifying the Underlying Contracts in accordance with Regulation 72 of the Public Contract Regulations 2015.

The Underlying Contract concern the provision of a range of highway maintenance services management and related services, by the Contractor, in relation to the Authority’s Road network.

Namely, the proposed modification is not substantial within the meaning of Regulation 72 (1) (e) and on the basis that:

  1. the modification does not render the Underlying Contract materially different in character – the works to be delivered are limited in nature to those already delivered, in the same geographical location and on identical commercial terms to those of that under the Underlying Contract and do not seek to introduce new requirements or amendments to the commercial terms
  2. the modification is for a limited period and is intended to facilitate the re-procurement of opportunities as a whole
  3. the Council has satisfied itself that the modification does not introduce conditions which would have (a) allowed for the admission of other candidates, (b) allowed for the acceptance of another tender, or (c) attracted additional participants in the procurement procedure – The Authority has satisfied that, had the Contract been originally advertised to take account of the extension, it is unlikely that this would have changed the outcome of the procurement or resulted in a different cohort of tenderers.
  4. the modification does not change the economic balance in favour of the contractor in a manner which was not provided for in the contract – The Authority has satisfied itself that the proposed pricing is on market terms and has been benchmarked this against market knowledge of similar contracts/pricing models and therefore remains reflective of market costs and does not amount to an over-compensation of the services to be provided.
  5. The modification extends the scope of the contract considerably – the Authority has satisfied itself that the modification does not extend the scope of the contract considerably as the extension is limited in duration to facilitate the re-procurement process and the specification and commercial terms remain unamended.
  6. As per our comments at 1 above, the modification does not extend the scope of the contract. For the reasons set out above, the proposed modification does not constitute a substantial modification and is permitted by Regulation 72 (1) (e) of the Public Contracts Regulations 2015.
Review and risk notes
Review procedure

The Contracting Authority will conduct itself in accordance with the Public Contracts Regulations 2015.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £25,000,0001 contract exc. VAT
Contracts signed 1latest 30 Dec 2013
Awarded toValueDateStatus
O' Hara Bros Surfacing LimitedSMESubcontracting: declared£25,000,000 †—Awarded

Contracts

Contracting authority & participating public bodies

London Borough of Hillingdon

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Civic Centre, High Street, Uxbridge, London, UB8 1UWContact name, email

Dispute resolution & review bodies

  • Cabinet OfficeReview contact point London
  • High Court of England and WalesMediation bodyReview body London

Bidders & participating suppliers

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.