Official UK procurement notice
Connexus Major Asset Works Framework
Authority: Connexus Homes Limited (Public body)
What is being bought2 lots · detail below
Published requirement descriptionConnexus is looking to establish a Major Asset Works Framework over a 4-year term for the provision of principal contractor services.
CPV: Builders' carpentry · Building completion work · Building construction work · Construction work · Installation of doors and windows · Installation of doors and windows and related components · Installation of fitted kitchens · Joinery and carpentry installation work · Joinery work · Mechanical engineering installation works · Plastering work · Roof works and other special trade construction works · +1 more
How this framework works
From the published notice- Places
- up to 10 suppliers · 7 bids on the busiest of 2 lots (0.7 per place) · 6 appointed
Lots and requirements (2)Procurement structure
2 lots · no lot values published · same evaluation weights on every lotLot #1Major Asset Works across ShropshireAwardedRenewal
Connexus is looking to establish a Major Asset Works Framework over a 4-year term for the provision of Principal Contractor Services for the delivery of the following elements of work;
- Damp/mould/condensation
- Structural
- Decent Homes
- Windows/Doors
- Roofing
- M&E
- Plastering
- Carpentry
- Groundworks
- Construction- single storey (for example single storey extensions) Additional information: This tender is split into two lots.
Both lots will be assessed separately. Tenderers can bid for one or both lots and can be awarded Lot 1, Lot 2 or both.
Lot #2Major Asset Works across HerefordshireAwardedRenewal
Connexus is looking to establish a Major Asset Works Framework over a 4-year term for the provision of Principal Contractor Services for the delivery of the following elements of work;
- Damp/mould/condensation
- Structural
- Decent Homes
- Windows/Doors
- Roofing
- M&E
- Plastering
- Carpentry
- Groundworks
- Construction- single storey (for example single storey extensions) Additional information: This tender is split into two lots.
Both lots will be assessed separately. Tenderers can bid for one or both lots and can be awarded Lot 1, Lot 2 or both.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 40
- Price: 60
- Economic & financial standing
In accordance with Regulations 58-60 of the Public Contracts Regulations 2015 as set out in the ITT.
- Technical & professional ability
In accordance with Regulations 58-60 of the Public Contracts Regulations 2015 as set out in the ITT.
- Staff
- Names and qualifications of delivery staff must be submitted
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
- “Connexus Major Asset Works Framework” is a framework: the contest is a place on its panel, up to 10 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 16 Aug 2023, 16:51 BST
- Last source update
- 22 Nov 2023, 13:58 GMT
- Award evaluation window
- 15 Sept 2023 – …
- FTS notice number
2023/S 000-034552- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03f06dFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering
- Review procedure
The Contracting Authority will incorporate a minimum ten calendar day standstill period at the point of information on the award of the Contract(s) to be awarded at conclusion of the procurement exercise begun by publication of the contract notice is communicated to tenderers. The Public Contracts Regulations 2015 provides for aggrieved parties who have been harmed or at risk of harm by breach of those regulations to take action in the High Court (England, Wales and Northern Ireland). Generally, any such action much be brought within thirty days from the date the aggrieved party knew or ought to have known about the alleged breach. Where the contract(s) have not been entered into the court may order the setting aside of the award decision or order the contracting authority to amend any document and may award damages. If the contract(s) have been entered into the court may only award damages or where the award procedures have not been followed correctly may in certain circumstances declare the contract to be ‘ineffective’.
Publisher note: Contractors should be Constructionline Accredited to silver level band at time of award of this contract. (MT Ref:230802)
How it was run
Official notice- Appointment period ends
- 15 Sept 2023, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 15 Sept 2023, 12:00 BST
Timeline
15 Sept 2023 → 22 Nov 2023 · 3 dates- Admission / appointment period endsperiod end, not a bid countdown15 Sept 2023, 12:00 BST
- Bids opened15 Sept 2023, 12:00 BST
- Notice published22 Nov 2023, 13:58 GMT
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete22 Nov 2023, 13:58 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Major Asset Works across Shropshire
- Signed
- 8 Nov 2023
- Value
- £8,000,000
- Status
- active
Major Asset Works across Herefordshire
- Signed
- 8 Nov 2023
- Value
- £4,000,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Major Asset Works across Shropshire | 7bids · 7 electronic · 7 from abroad | 7 | — | — |
| 2 · Major Asset Works across Herefordshire | 4bids · 4 electronic · 4 from abroad | 4 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Public Procurement Review ServiceReview body
- Royal Courts of JusticeMediation body
- The Cabinet OfficeReview contact point
Framework contractors & participating bidders
6 commercial parties on the notice- Altior Construction LtdFramework contractor
- Elite Contractors LimitedFramework contractor
- G.P. Thomas ConstructionFramework contractor
- S.Hayward Construction LimitedFramework contractor
- Salopian Maintenance LimitedFramework contractor
- Wade Construction & Development LtdFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.