Official UK procurement notice
BM.23.039 SWEC Programme: East Road Building – Base Build
Authority: The Trustees of the British Museum
What is being bought
Published requirement descriptionPlease note this is a Contract Award Notice, not a new opportunity to participate in a procurement.
The works at East Road within the British Museum estate comprise construction of a new building as part of the Museum’s overall South South-West Energy Centre (SWEC) Programme. The basement, ground and first floor building will provide accommodation for mechanical, electrical and fire systems plant, plus carpentry, electrical, locksmith workshop/maintenance facilities. The works relate to the base building only to be delivered as a waterproof shell. It excludes all fit out and MEP to serve the building and primary MEP central plant.
CPV: Building construction work
The lotProcurement structure
single lot · value publishedLot #1The East Road Building (ERB) is part of the British Museum’s overall South West Energy…AwardedPublished value£4,658,000
The East Road Building (ERB) is part of the British Museum’s overall South West Energy Centre (SWEC) Programme. The SWEC programme is an estate-wide array of projects to decarbonise the British Museum’s Bloomsbury Estate. The East Road Building project comprises the replacement of the existing East Road building located in the north-east corner of the Bloomsbury site with a new building, circa 680sm, spread over basement, ground and first floors. The East Road building will primarily provide space for site-wide central plant room as well as workshops spaces for carpentry, electrical and locksmiths and maintenance facilities; and welfare, changing and WC facilities. Summary of work elements in this tender:
- Basement excavation and construction
- Reinforced concrete structural frame
- Brickwork cladding, external doors and windows
- Roof finishes and rooflights Refer to the indicative design information uploaded with this SQ for further details of the proposed building. This procurement process relates to the base building to be delivered as a waterproof shell. It excludes all fit out and MEP to serve the building and primary MEP central plant.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality: 65%
- Cost: 35%
Published award criteria (2)
- Quality: 65
- Cost: 35
- Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 16 Jun 2023, 19:04 BST
- Last source update
- 28 May 2024, 14:05 BST
- FTS notice number
2024/S 000-016622- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03d741Find a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
Publisher note: To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=864883978 GO Reference: GO-2024528-PRO-26332547
How it was run
Official notice- Submission deadline
- 18 Jul 2023, 12:00 BST
- Submission channel
- {"written"}
- Accepted languages
- en
Timeline
18 Jul 2023 → 28 May 2024 · 2 dates- Submission deadline18 Jul 2023, 12:00 BST
- Notice published28 May 2024, 14:05 BST
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete28 May 2024, 14:05 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Quinn (London) LimitedSME | — | — | Awarded |
Contracts
Contract 016622-2024-1 · Quinn (London) LimitedSME
- Signed
- 1 May 2024
- Value
- —
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| The East Road Building (ERB) is part of the British Museum’s overall South West Energy… | 5bids · 5 electronic · 5 from abroad | 5 | — | £2,725,202 – £4,155,345 |
| Whole notice | — | — | — | £2,725,202 – £4,155,345 |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Chartered Institute of ArbitratorsMediation body
- The British MuseumReview body
Bidders & participating suppliers
1 commercial party on the notice- Quinn (London) LimitedAwarded supplier
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.