Blackfriars Bridge Phase 2 - Refurbishment
Authority: The Mayor and Commonalty and Citizens of the City of London (Local council)
What is being bought
Published requirement descriptionThe project will repaint Blackfriars Bridge (Spans 1, 3 and 4), including the gilding of embellishments where appropriate. This will significantly improve the aesthetics of the structure and protect its fabric.
The project will also repair the parapets to prevent future water ingress and protect the structure. Spans 2 and 5 have been completed under a separate contract. Gateway 5 for the project was approved May 2021.
Previous works contract was tendered for Phase 1 which has now ended with the 40% of the total work completed. The full scope of the project was not completed due to access restrictions i.e. due to Tideway Tunnel project in the Thames adjacent to the Blackfriars Bridge.
CPV: Construction work for bridges
How this dynamic market works
From the published notice- Type
- Dynamic market
- Bids received
- 4 bids received · 1 suppliers appointed
- Market period
- 2 yrs · up to 2 yrs 11 mo from 1 Oct 2025
The lotProcurement structure
single lot · value publishedLot #1AwardedRenewalPublished value£8,000,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (6)
- 1. Experience: 30%
- 2. Refurbishment and Maintenance: 25%
- 3. Organisation’s competency: 10%
- 4. Staff experience and Qualifications: 10%
- 5. Programme: 15%
- 6. Stakeholder Management: 10%
Published award criteria (6)
- 1. Experience: Please give details of the organisation's previous experience of major bridge refurbishment works, with specific reference to major river crossings and heritage Civil Engineering structures, where possible. Please state: - • the names of any clients for whom the organisation has performed the work; • the scope of your company’s involvement (i.e. main or sub-consultant); • the dates and durations the contract(s); • the approximate value of the contract(s); and the range of services offered.
- 2. Refurbishment and Maintenance: Please outline how you would undertake the parapet refurbishment and maintenance painting, including details of the access arrangements and outline site compound proposals.
- 3. Organisation’s competency: Please provide information, that clearly and succinctly confirms your organisation’s competency towards undertaking the specified works, with particular reference to – • your ICATS registration and experience • number and qualifications of the ICATS registered staff, at the time of submission • Bridge and highway structures recoating experience. • Cast Iron refurbishment experience
- 4. Staff experience and Qualifications: Please provide a summary of the staff proposed to work on this project, with a short summary of experience and qualifications for each one. Please also state how work-related training or recruitment opportunities are targeted towards underrepresented groups, NEETS, long term unemployed, ex-offenders etc.
- 5. Programme: Provide your proposed programme of work
- 6. Stakeholder Management: How will stakeholders be managed to ensure optimum continuity of work on site throughout the contract, including obtaining the relevant consents and interfacing with the public?
- “Blackfriars Bridge Phase 2 - Refurbishment” is a dynamic market: the contest is a place on its panel, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Dynamic market
- Who may use this agreement
- Any qualifying supplier may apply while the market is open
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 17 Apr 2025, 14:47 BST
- Last source update
- 7 Jan 2026, 14:22 GMT
- Award evaluation window
- Submission end – 28 Jul 2025
- Authority reference
itt_96- FTS notice number
2025/S 000-021125- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0504f6Find a Tender
- Risks
The closure of spans to river traffic is to be negotiated by the Contractor with the PLA. Closure of spans to river traffic is typically restricted to one navigable span at a time. Span 2 of the bridge is currently closed due to the adjacent Tideway Tunnel Project, but this is expected to re-open to navigation in September 2025.
How it was run
Official notice- Admission period ends
- 30 Jun 2025, 14:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
17 Apr 2025 → 7 Jan 2026 · 10 dates- Planning notice published17 Apr 2025, 14:47 BST
- Market engagement6 May 2025, 23:59 BST
About the Project
The Blackfriars Bridge Refurbishment Project – Phase 2, will fully refurbish three spans (spans 1, 3 and 4) of London’s iconic Blackfriars Bridge.
The works to the three spans will include, as a non-exhaustive list:
i) Repair and renovation of the cast iron parapets.
ii) Creating a suitable temporary access system to the underside of the deck that satisfies requirements of all stakeholders.
iii) Preparation and maintenance painting of the bridge.
Pedestrian and vehicular traffic on the bridge is not to have any significant interruptions during the works.
Blackfriars Bridge was built in 1869 and carries the A201 over the River Thames. The bridge structure is owned by the City Bridge Foundation.
Spans 2 and 5 of the bridge were recently refurbished, with the works completed in 2023. However, spans 1, 3 and 4 of the bridge were last painted in 2000 and are showing rust staining in parts particularly in the outer facias/spandrels. Previous inspections of the bridge have also found the parapets to generally be in poor condition, with a number of the balusters cracked or damaged. Although the parapet does not comply with current standards a recent load test and risk assessment has justified its refurbishment rather than replacement.
About the Bridge
The original five span arch structure is formed from wrought iron spandrels and deck with a decorative cast iron outer spandrel which incorporates a decorative parapet. The structure is supported on masonry piers and abutments with a total span of 285m. The original structure, which was completed in 1869, was 22.86m wide between parapets. The structure, including piers, abutments and foundations, was widened in 1909 by 9.14m with the addition of new steel arches. At the north end of the bridge a new curved approach connecting the Victoria Embankment to the bridge was constructed that cantilevered from the north abutment.
The parapet consists of two continuous hollow cast iron box rails that are supported on balusters. The balusters are set on a plinth that is covered with wrought iron plates. Tie rods connect the rails to the concrete plinth through the hollow balusters. The parapet is approximately 1m high. The parapets are discontinuous across the piers.
The bridge is a key transport link within the City of London, one of the busiest crossings over the River Thames. Transport for London is the Highway Authority for the bridge.
Span 5 is not navigable by large vessels. Span 1 is over the Blackfriars underpass and part of the Tideway site establishment. Currently Span 2 is closed for the Tideway project works, although this is due to re-open in summer 2025. It is expected that this project will commence once the river restrictions from the Tideway project have been removed.
Interested suppliers will be asked to complete a short questionnaire
If you wish to participate in this exercise please send to the person nameed in this notice.
and request a Preliminary Market Engagement (PME) questionnauire.
I expect you to complete and submit your (PME) questuionnaires by the 'Engagement deadline'.
- Next notice expected12 May 2025, 23:59 BST
- Tender notice published14 May 2025, 10:39 BST
- Admission / appointment period endsperiod end, not a bid countdown30 Jun 2025, 14:00 BST
- Award decision expected by28 Jul 2025, 23:59 BST
- Assessment summaries sent390 days ago25 Sept 2025, 00:00 BST
- Contract starts384 days ago1 Oct 2025, 00:00 BST
- Standstill ends377 days ago7 Oct 2025, 23:59 BST
- Latest notice published286 days ago7 Jan 2026, 14:22 GMT
Notice history
11 events · 5 releases on Find a Tender · since 17 Apr 2025- Preliminary market engagement notice published17 Apr 2025, 14:47 BSTUK2
- Tender notice published14 May 2025, 10:39 BSTUK4
- Published value published: £8,000,00014 May 2025, 10:39 BST
- Status changed to active14 May 2025, 10:39 BST
- Procurement method changed14 May 2025, 10:39 BST
- Deadline published: 30 Jun 2025, 14:00 BST14 May 2025, 10:39 BST
- Contract award notice published26 Sept 2025, 15:41 BSTUK6
- Status changed to complete26 Sept 2025, 15:41 BST
- Contract signature expected13 Oct 2025, 23:59 BSTscheduled
- Contract details notice published24 Nov 2025, 15:01 GMTUK7
- Contract details notice published7 Jan 2026, 14:22 GMTUK7
Routine re-releases (5)
- 2025-05: 1 release · 14 May 2025
- 2025-04: 1 release · 17 Apr 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Taziker Industrial22 Oct 2025 – 21 Oct 2027 · up to 23 Oct 2028Extensions: Lack of consnt from stakeholders and additional defects found. | £8,994,168 | 25 Sept 2025standstill to 7 Oct 2025 | Standstill |
Contracts
Blackfriars Bridge Phase 2 - Refurbishment
- Signed
- 6 Nov 2025
- Value
- £8,994,168
- Period
- 6 Nov 2025 – 8 Nov 2027 · up to 8 Nov 2028 with extensions
- Status
- active
- Extensions
- Extensions maybe required in the following circumstainces: Delays in obtaining concents from stakeholders Access constraints Variations Coordination with other projects
- Change Copy of the Redacted Contract has been attached.
No agreed KPIs: It is an exempt contract pursuant to paragraph 38 of Part 2 of Schedule 2 of the Procurement Act 2023.
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 4final-stage tenders | 0 | 0 | — |
Who bid
- did not winBeaver Bridges Ltd · West Midlands
- did not winFM Conway Ltd · South East England
- did not winBAM Nuttall Ltd · South East England
- wonTaziker Industrial Ltd · North West England
Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.
Contracting authority & participating public bodies
Suppliers admitted to the dynamic market
5 commercial parties on the notice · 2 awarded- BAM Nuttall LtdBidder / tenderer
- Beaver Bridges LtdBidder / tenderer
- FM Conway LtdBidder / tenderer
- Taziker Industrial LtdAdmitted to the market
- Taziker Industrial LtdAdmitted to the market
Official documents & specifications (6)
Official links; attachments are not copiedTender pack and attachments
- Signed contract Redacted Agreement
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender