Barking Town Centre District Heating Network – contract for the Design, Supply and Installation of CHPs’s and WSHP

Official notice

Authority: London Borough of Barking and Dagenham (Local council)·Consortium: 2 public authorities

Works
Planned pipeline value£1pipeline notice, not a live tender
Tender notice expected 1 Jan 2025from the planned procurement notice

What is being bought

Published requirement description

The London Borough of Barking and Dagenham (LBBD) will be procuring on behalf of its wholly owned subsidiary energy company, B&D Energy, a contractor to undertake the design, supply and installation of 2 off CHP’s and 1 off WSHP to be installed in a Strategic Energy Centre, and adjoining areas, which is currently under construction in Barking Town Centre. These Works will be tendered as LOT3 of a three-part construction contract for the Barking Town Centre Strategic Heat Network, as follows:

  • LOT1 – the strategic heat network around Barking Town Centre. These Works have been procured and are largely completed, with building connections progressively being installed as developments are built.
  • LOT2 – the Strategic Energy Centre Buildings. These Works have been procured and construction of these are drawing ot a close and will be completed in preparation for the LOT 3 Works. LOT2 includes a Northern building which houses 24 MW of gas fired boilers which have been included in the LOT2 Works, together with utility and heat network connections, chimneys and thermal stores. This also includes a Southern building where the majority of the LOT3 Works will take place.
  • LOT3 – CHP’s and WSHP’s – these Works are to be procured in this tender process and will involve the design, supply and installation of a 600 kW and 1,200 kW CHP units and a 1,750-kW heat pump operating in conjunction with the River Roding as the heat source. These primary items of plant will be installed in the Southern building and the Works will also include the laying of pipework to the riverside, the construction of a heat interface building adjacent to the river and the installation of riverside abstraction and discharge equipment.

The Council on behalf of B&D Energy invites suitably qualified contractors to attend a market engagement event via MS TEAMS on 20/6/2024 between 2pm and 3pm. Contact [email protected] by 12pm on Friday 14/6/2024 to confirm your attendance. See attached for infor

CPV: District heating boiler · District-heating mains construction work

The lotProcurement structure

single lot · no lot value published

Procedure terms & legal framework

From the official record · publisher note attached
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Past planning notice
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
28 May 2024, 10:21 BST
Last source update
28 May 2024, 10:21 BST
FTS notice number
2024/S 000-016578
Classification (CPV)
District heating boilerDistrict-heating mains construction work
Delivery area
London (UKI52)
Official registry OCID
ocds-h6vhtk-046ba2 Find a Tender

Publisher note: The London Borough of Barking and Dagenham (LBBD) will be procuring on behalf of its wholly owned subsidiary energy company, B&D Energy, a contractor to undertake the design, supply and installation of 2 off CHP’s and 1 off WSHP to be installed in a Strategic Energy Centre, and adjoining areas, which is currently under construction in Barking Town Centre. These Works will be tendered as LOT3 of a three-part construction contract for the Barking Town Centre Strategic Heat Network, as follows: • LOT1 – the strategic heat network around Barking Town Centre. These Works have been procured and are largely completed, with building connections progressively being installed as developments are built. • LOT2 – the Strategic Energy Centre Buildings. These Works have been procured and construction of these are drawing ot a close and will be completed in preparation for the LOT 3 Works. LOT2 includes a Northern building which houses 24 MW of gas fired boilers which have been included in the LOT2 Works, together with utility and heat network connections, chimneys and thermal stores. This also includes a Southern building where the majority of the LOT3 Works will take place. • LOT3 – CHP’s and WSHP’s – these Works are to be procured in this tender process and will involve the design, supply and installation of a 600 kW and 1,200 kW CHP units and a 1,750-kW heat pump operating in conjunction with the River Roding as the heat source. These primary items of plant will be installed in the Southern building and the Works will also include the laying of pipework to the riverside, the construction of a heat interface building adjacent to the river and the installation of riverside abstraction and discharge equipment. The Council on behalf of B&D Energy invites suitably qualified contractors to attend a market engagement event via MS TEAMS on 20/6/2024 between 2pm and 3pm. Contact [email protected] by 12pm on Friday 14/6/2024 to confirm your attendance. See attached for infor

How it was run

Official notice
Submission deadline
—

Timeline

28 May 2024 → 1 Jan 2025 · 2 dates
  1. Notice published
    28 May 2024, 10:21 BST
  2. Tender notice expected
    1 Jan 2025

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

2 public bodies on the notice

London Borough of Barking and Dagenham

Contracting authorityLocal CouncilRegional or local authorityGeneral public services Town Hall Square, 1 Clockhouse Avenue, Barking, London, IG11 7LUContact email