Official UK procurement notice
Asbestos Management Framework · UK public procurement notice
Authority: Tai Hedyn Limited (Public body)
What is being bought2 lots · detail below
Published requirement descriptionIntroduction
Tai Hedyn Limited (Hedyn) was created on the 1st of April 2025 through the merger of Melin Homes Limited and Newport City Homes Housing Association Limited.Hedyn provides homes and services to customers across South-east Wales. With approximately 15,000 homes, it is the second largest housing association in Wales, and
operates across five local authorities: Blaenau Gwent, Monmouthshire, Newport, Powys,and Torfaen.
Framework Details
Hedyn wishes to establish a standalone framework for the provision of Asbestos Management. The proposed framework will be for a maximum duration of 48 months.
The duration of the framework will be for 24 months. with options to extend for up to a maximum of a further 24 months. Extension options will be offered at the discretion of the Association and may be offered incrementally or in full. This and will be subject to satisfactory contractor performance and the framework continuing to meet the requirements of the Association.
This framework will be used by all areas of the Association to identify, inspect, manage and remediate asbestos containing materials. Areas of the Association that will use the framework include the building safety team, reactive and planned maintenance teams, voids team, capital works team and estates team. Services and works under this framework may range from 'ad-hoc' single tasks to full programmes of works and will vary year on year due to the demands and requirements of the Association.
Contractors appointed to each of the lots will not be guaranteed any minimum volumes or values of work.
Asbestos management services and works are required to comply with the general duties under the Health and Safety at Work Act 1974 (as mended) and more specifically incompliance with duties under the Control of Asbestos Regulations 2012 ('CAR 2012').
The association has an Asbestos Management Plan ('AMP') which sets out the management of Asbestos in its property portfolio.
All services and works must be carried out in accordance with all current and any future legislation, regulations or industry guidance as may be brought into force or issued from time to time.
The framework will be split into the following lots:
Lot 1 - Asbestos Air Monitoring, Surveying and Bulk Sampling.
Lot 2 - Asbestos Removal and Reinstatement Works
CPV: Asbestos removal services · Asbestos-removal work
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 5 suppliers · 11 bids on the busiest of 2 lots (2.2 per place) · 5 appointed (full)
- Framework period
- 2 yrs · up to 4 yrs from 1 Dec 2025
- Supplier levy on call-offs (max %)
- Not applicable
Published description of the framework
Appointed Framework Contractors are ranked in each lot. Services and Works estimated by the Association to be less than 5000 GBP using the Framework's Schedules of Rates will be awarded to the Contractor ranked in first place in the relevant lot, If the first placed Contractor is unable to accept the contract then it will be offered to the Contractor in second place and son of the relevant lot..
Services and Works estimated by the Association to be more than 5000 GBP using the Framework's Schedules of Rates will be be subject to a mini competition between the contractors in the relevant lot on a price only basis .
For emergency call out services and works, regardless of value, the services and works will be offered to the first placed contractor in the relevant lot, if the first place contractor is unable to undertake the services and works, they will be offered to the second place contractor and so on for the relevant lot
Lots and requirements (2)Procurement structure
2 lots · all with a published value · a supplier may bid for at most 1 and win at most 1 of them · same conditions of participation on every lot · same evaluation weights on every lotLot #1Air Monitoring, Asbestos Surveys and Bulk SamplingAwardedRenewalPublished value£800,000
Air Monitoring
The Association commissions asbestos air monitoring within its properties in order to ensure compliance with CAR 2012 and Asbestos: The Analysts' Guide - HSG248.Requirements usually take the form of but are not limited to the following:
- Personal sampling for the assessment of respirator protection;
- Static sampling to assess background levels;
- Air monitoring during asbestos removal works;
- Air monitoring after asbestos removal works is complete;
- Four-stage clearances;
- Certificates of re-occupation.
Surveys
The Association commissions asbestos surveys of owned or managed properties in order to ensure compliance with CAR 2012 and Regulations 3 & 10 of the Management of Health and Safety at Work Regulations 1999.Non-Domestic Survey requirements take the form of management surveys, management survey re-inspections, management surveys with targeted Refurbishment and Demolition (R&D) elements or full (R&D) surveys as set out in HSG264 either to parts of or the whole of buildings unless otherwise specified and agreed. Asbestos survey requirements will follow the HSG264 standard, and will take the form of the following;
- Management surveys update / review of domestic property.
- Management survey update / review of non-domestic communal areas,
blocks and commercial units.
- Management survey with intrusive inspections to pre-defined work
area(s).
- Localised refurbishment and demolition surveys;
- Full R&D survey.
Bulk Sampling
Bulk sample analysis requirements usually take the form of analysis requests for completion within a set time of one or more samples of suspected ACMs collected by P402 trained staff. Bulk sample analysis must be undertaken by a UKAS or equivalent accredited laboratory.
For full details please refer to the Invitation to Tender (ITT) Documents.
The maximum number of contractors to be appointed to this lot is two (2).
- Economic & financial standing
As stated in the Invitation to Tender (ITT) Documents
- Technical & professional ability
As stated in the Invitation to Tender (ITT) Documents
Lot #2Asbestos Removal and Reinstatement WorksAwardedRenewalPublished value£1,200,000
Hedyn will commission asbestos removals within their domestic and non-domestic properties in order to ensure compliance with CAR 2012.
Asbestos removal requirements will typically take the form of licensed work, non notifiable licensed work (NNLW) and non licensed work in or on:
- Domestic properties;
- Non-domestic properties;
- Common parts and communal areas of Association owned buildings.
- Commercial units and offices;
- Removal of fly-tipped waste from the association's property and land.
Works must be carried out in accordance with HSG247 and HSG210.
The Association aims to use the services of Licenced Asbestos Removal Companies (LARC) who can provide asbestos removal and reinstatement work, this provides benefits by means of ease of work co-ordination, reduced work timescales, less disruption to Customers, easier purchase ordering and invoicing.
Examples of re-instatement work may include:
- Re-instatement and plastering of ceilings and walls;
- Self levelling of floors;
- Insulation of roof spaces;
- Replacement of loft hatches.
Please note not all removal work will require re-instatement work.
The LARC can have their own in-house trades or can use subcontractors to provide reinstatement. Where sub-contractors are used the association will expect the LARC to manage the whole process and undertake due diligence in relation to their competence to undertake the work. Hedyn will expect to see regular evidence of due diligence for subcontractors.
The maximum number of contractors to be appointed to this lot is three (3).
- Economic & financial standing
As stated in the Invitation to Tender (ITT) Documents
- Technical & professional ability
As stated in the Invitation to Tender (ITT) Documents
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Price: Commercial Response Schedule of Rates (S0R).
- Quality: Quality questions relating to the subject matter of the framework and service delivery.
- Economic & financial standing
As stated in the Invitation to Tender (ITT) Documents
- Technical & professional ability
As stated in the Invitation to Tender (ITT) Documents
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “Asbestos Management Framework” is a framework: the contest is a place on its panel, up to 5 suppliers, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 18 Apr 2025, 12:22 BST
- Last source update
- 6 Mar 2026, 16:38 GMT
- Award evaluation window
- Submission end – 15 Oct 2025
- Authority reference
HEDYN/CYCL/2506- FTS notice number
2025/S 000-050308- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-050545Find a Tender- Contract terms summary
As stated in the Invitation to Tender (ITT) Documents
- Risks
As stated in the Invitation to Tender (ITT) Documents
How it was run
Official notice- Appointment period ends
- 16 Sept 2025, 12:00 BST
- Clarification deadline
- 9 Sept 2025, 17:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- cy, en
- Supplier levy on call-offs (max %)
- call-off levy · Not applicable
www.delta-esourcing.com/delta/respondToList.… ↗
The Invitation to Tender (ITT) documents can be obtained for each lot using the weblinks below for Hedyn's E-Tender Portal. This is also the portal where Tender Response must be submitted.
Timeline
18 Apr 2025 → 6 Mar 2026 · 11 dates- Planning notice published18 Apr 2025, 12:22 BST
- Market engagement7 May 2025, 23:59 BST
If you would like to attend the event, please complete the registration form for the relevant lot that you are interested in attending for. Suppliers may register attendance for both lots if they wish. The number of attendees is limited to 2 for each supplier. Therefore, please ensure that the appropriate representatives from your organisation are nominated to attend.
Suppliers wishing to attend must register for the event no later than 12 Noon, on Wednesday 7th May 2025.
Please use the following link to the E-Tender Portal to register for the event:
www.delta-esourcing.com/tenders/UK-title/53W… ↗
and complete and submit the Supplier Registration Form (Questionnaire) in the portal.
Event Details
The Preliminary Market Engagement event is to be held on 21st May 2025, between 0930hrs and 1300hrs
The location is to be confirmed subject to the number of suppliers registering to attend the event. Suppliers that have registered to attend the event will be notified directly to confirm the location. Therefore, it is important that Suppliers when registering for the event must provide email contact details
Session Details
Lot 1 – 0930hrs Wednesday, 21st May 2025
Lot 2 – 1100hrs Wednesday 21st May 2025
Event Format
- Presentations by Technical Leads and Procurement
- Question and Answers
Pre-Market Engagement Event Objectives
The objectives for the event are for the Association to:
- gauge and generate market interest in the framework agreement;
- gain an understanding of your experience of similar frameworks,
incorporating any lessons learnt to drive improvements and efficiencies.
- listen, reflect and mitigate any foreseeable risks within the procurement
process for the proposed framework agreement to ensure that the
services and works to be delivered meet the Associations requirements
and offer value for money.
Following the event will be circulated to all attendees via the E-Tender Portal. Also presentation documentation will be included within the Tender Pack when it is published via the E-Tender Portal.
- Next notice expected30 May 2025, 23:59 BST
- Tender notice published20 Aug 2025, 16:17 BST
- Clarification questions by9 Sept 2025, 17:00 BST
- Admission / appointment period endsperiod end, not a bid countdown16 Sept 2025, 12:00 BST
- Award decision expected by372 days ago15 Oct 2025, 23:59 BST
- Assessment summaries sent328 days ago28 Nov 2025
- Contract starts325 days ago1 Dec 2025
- Standstill ends315 days ago10 Dec 2025, 23:59 GMT
- Latest notice published230 days ago6 Mar 2026, 16:38 GMT
Notice history
10 events · 4 releases on Find a Tender · since 18 Apr 2025- Preliminary market engagement notice published18 Apr 2025, 12:22 BSTUK2
- Tender notice published20 Aug 2025, 16:17 BSTUK4
- Published value published: £2,000,00020 Aug 2025, 16:17 BST
- Status changed to active20 Aug 2025, 16:17 BST
- Procurement method changed20 Aug 2025, 16:17 BST
- Deadline published: 16 Sept 2025, 12:00 BST20 Aug 2025, 16:17 BST
- Contract award notice published28 Nov 2025, 16:53 GMTUK6
- Status changed to complete28 Nov 2025, 16:53 GMT
- Contract signature expected15 Jan 2026, 23:59 GMTscheduled
- Contract details notice published6 Mar 2026, 16:38 GMTUK7
Routine re-releases (4)
- 2025-04: 1 release · 18 Apr 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Air Monitoring, Asbestos Surveys and Bulk Sampling1 award | |||
| ENQUIN ENVIRONMENTAL LIMITEDSME, Life Environmental Services LtdSMELot 1 - Asbestos Air Monitoring, Surveying and Bulk Sampling1 Mar 2026 – 29 Feb 2028 · up to 28 Feb 2030Extensions: The framework may be extended by up to a maximum of 24 months. Extension options will be offered at the discretion of the Association and may be offered incrementally or in full. This and will be subject to satisfactory contractor performance and the framework continuing to meet the requirements of the association | £800,000 | 21 Nov 2025 | Awarded |
| Lot 2 · Asbestos Removal and Reinstatement Works1 award | |||
| Omega Environmental Services LtdSME, Severn Insulation Co LtdSME, Woods Building Services Limited1 Mar 2026 – 29 Feb 2028 · up to 28 Feb 2030Extensions: The framework may be extended by up to a maximum of 24 months. Extension options will be offered at the discretion of the Association and may be offered incrementally or in full. This and will be subject to satisfactory contractor performance and the framework continuing to meet the requirements of the association | £1,200,000 | 21 Nov 2025 | Awarded |
Contracts
Lot 1. Air Monitoring, Asbestos Surveys and Bulk Sampling · ENQUIN ENVIRONMENTAL LIMITEDSME, Life Environmental Services LtdSME
- Signed
- 19 Feb 2026
- Value
- £800,000
- Period
- 1 Mar 2026 – 29 Feb 2028 · up to 28 Feb 2030 with extensions
- Status
- active
- Extensions
- The framework may be extended by up to a maximum of 24 months. Extension options will be offered at the discretion of the Association and may be offered incrementally or in full. This and will be subject to satisfactory contractor performance and the framework continuing to meet the requirements of the Association.
Lot 2. Asbestos Removal and Reinstatement Works · Omega Environmental Services LtdSME, Severn Insulation Co LtdSME, Woods Building Services Limited
- Signed
- 19 Feb 2026
- Value
- £1,200,000
- Period
- 1 Mar 2026 – 29 Feb 2028 · up to 28 Feb 2030 with extensions
- Status
- active
- Extensions
- The framework may be extended by up to a maximum of 24 months. Extension options will be offered at the discretion of the Association and may be offered incrementally or in full. This and will be subject to satisfactory contractor performance and the framework continuing to meet the requirements of the Association.
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Air Monitoring, Asbestos Surveys and Bulk Sampling | 5final-stage tenders | 5 | 0 | — |
| 2 · Asbestos Removal and Reinstatement Works | 11final-stage tenders | 11 | 0 | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
5 commercial parties on the notice- Enquin Environmental LimitedFramework contractor
- Life Environmental Services LimitedFramework contractor
- Omega Environmental Services LimitedFramework contractor
- Severn Insulation Co LimitedFramework contractor
- Woods Building Services Ltd. t/a AA WoodsFramework contractor
Official documents & specifications (7)
Official links; attachments are not copiedTender pack and attachments
- Technical specificationsAs stated in the Invitation to Tender (ITT) Documents
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender