Find a TenderAwarded
Published 19 Jul 2022, 19:05 BST

Official UK procurement notice

Arc123 - Mechanical and Electrical Engineering Framework

Official notice

Authority: Scape Group Limited (trading as SCAPE) (Public body)

Framework agreement4 lotsWorksOpen procedureSME suitableMax 2 lots per supplier
Framework ceiling (notional)£16,000,000total for 4 lots · framework ceiling, not attributable revenue
Submissions closed 26 Aug 2022awarded 16 Nov 2022
Lots 4max 2 won per supplier

What is being bought4 lots · detail below

Published requirement description

SCAPE is procuring this framework on behalf of Arc Property Services Partnership Limited (Arc Partnership).

Arc Partnership is an innovative joint venture developed by Nottinghamshire County Council and Scape Group. This framework is for the provision of mechanical and electrical engineering works for Arc Partnership.

Applications are invited from experienced providers of Mechanical and Elelctrical Engineering works and services who can provide high quality, whilst using a customer focused approach particularly in the public sector.

The specific works and services that may be procured under the Framework cannot be clearly defined at this stage, however the nature and types of works that may be required may include those services identified by CPV code on or in connection with any land or property and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.

CPV: Architectural, construction, engineering and inspection services · Building completion work · Building installation work · Construction work · Construction-related services · Consulting services for water-supply and waste consultancy · Electrical installation work · Electrical machinery, apparatus, equipment and consumables; lighting · Engineering services · Installation services of electrical and mechanical equipment · Mechanical installations · Plumbing and heating materials · +7 more

How this framework works

From the published notice
Bids received
2 bids on the busiest of 4 lots · 3 suppliers appointed

Lots and requirements (4)Procurement structure

4 lots · all with a published value · win at most 2 of them · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £5,500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Mechanical Engineering WorksAwardedceiling above

Places of performance: UKF14 (Nottingham), UKF15 (North Nottinghamshire), UKF16 (South Nottinghamshire), UKE3 (South Yorkshire), UKF1 (Derbyshire and Nottinghamshire), UKF22 (Leicestershire CC and Rutland), and UKF3 (Lincolnshire CC).

The works will comprise a range of mechanical engineering as noted. In addition, ancillary services will be made available by the framework partner through their own supply chain. The specific works that may be procured under the framework cannot be clearly defined at this stage. The nature and type of services may include those identified by CPV codes on or in connection with any land or property, infrastructure and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.

The Common Procurement Vocabulary codes stated are deemed to include, for the avoidance of doubt and unless otherwise stated, the Category and Sub-category codes below the CPV codes stated, i.e. 71000000, construction related services is deemed to include 71300000, engineering services and 71314310 Heating engineering services for buildings.

This is a framework opportunity that will utilise a mix of mini-competition and direct award to allocate projects. A parallel lotting model has been adopted, wherein Lots 1 and 2 are mirrored Lots that cover the same scope of works. The model works on the framework pre-tendered net labour, materials and subcontractor costs, with overheads and profit and any design (only where required), being priced separately. At this stage, Arc anticipate that one supplier/entity will be awarded Lot 1 to provide the required services at the conclusion of the procurement process themselves, through their supply chain or via a consortium/joint venture arrangement. The supplier/entity will be expected to work for and cooperate with public sector clients, in-house and external consultants, contractors and other partner providers. All contract performance will be monitored using a set of comprehensive performance indicators. Works shall be delivered by the contractor and their supply chain. All services will be performed in accordance with the framework agreement.

Individual commissions called-off under the framework may be as little as 2,500 GBP or exceed 250,000 GBP.

Bidders applying for this Lot are required to have a minimum annual turnover of 1,000,000 GBP. Additional information: This is an award notice, meaning this opportunity has now been awarded.

Delivery: East Midlands · EAST MIDLANDS (ENGLAND)
Variant bids: not allowed
Lot #2Mechanical Engineering WorksAwardedceiling above

Places of performance: UKF14 (Nottingham), UKF15 (North Nottinghamshire), UKF16 (South Nottinghamshire), UKE3 (South Yorkshire), UKF1 (Derbyshire and Nottinghamshire), UKF22 (Leicestershire CC and Rutland), and UKF3 (Lincolnshire CC).

The works will comprise a range of mechanical engineering as noted. In addition, ancillary services will be made available by the framework partner through their own supply chain. The specific works that may be procured under the framework cannot be clearly defined at this stage. The nature and type of services may include those identified by CPV codes on or in connection with any land or property, infrastructure and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.

The Common Procurement Vocabulary codes stated are deemed to include, for the avoidance of doubt and unless otherwise stated, the Category and Sub-category codes below the CPV codes stated, i.e. 71000000, construction related services is deemed to include 71300000, engineering services and 71314310 Heating engineering services for buildings.

This is a framework opportunity that will utilise a mix of mini-competition and direct award to allocate projects. A parallel lotting model has been adopted, wherein Lots 1 and 2 are mirrored Lots that cover the same scope of works. The model works on the framework pre-tendered net labour, materials and subcontractor costs, with overheads and profit and any design (only where required), being priced separately. At this stage, Arc anticipate that one supplier/entity will be awarded Lot 2 to provide the required services at the conclusion of the procurement process themselves, through their supply chain or via a consortium/joint venture arrangement. The supplier/entity will be expected to work for and cooperate with public sector clients, in-house and external consultants, contractors and other partner providers. All contract performance will be monitored using a set of comprehensive performance indicators. Works shall be delivered by the contractor and their supply chain. All services will be performed in accordance with the framework agreement.

Individual commissions called-off under the framework may be as little as 2,500 GBP or exceed 250,000 GBP.

Bidders applying for this Lot are required to have a minimum annual turnover of 1,000,000 GBP. Additional information: This is an award notice, meaning this opportunity has now been awarded.

Delivery: East Midlands · EAST MIDLANDS (ENGLAND)
Variant bids: not allowed
Lot #3Electrical Engineering WorksAwardedPublished value£2,500,000

Places of performance: UKF14 (Nottingham), UKF15 (North Nottinghamshire), UKF16 (South Nottinghamshire), UKE3 (South Yorkshire), UKF1 (Derbyshire and Nottinghamshire), UKF22 (Leicestershire CC and Rutland), and UKF3 (Lincolnshire CC).

The works will comprise a range of electrical engineering as noted. In addition, ancillary services will be made available by the framework partner through their own supply chain. The specific works that may be procured under the framework cannot be clearly defined at this stage. The nature and type of services may include those identified by CPV codes on or in connection with any land or property, infrastructure and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.

The Common Procurement Vocabulary codes stated are deemed to include, for the avoidance of doubt and unless otherwise stated, the Category and Sub-category codes below the CPV codes stated, i.e. 71000000, construction related services is deemed to include 71300000, engineering services and 71314310 Heating engineering services for buildings.

This is a framework opportunity that will utilise a mix of mini-competition and direct award to allocate projects. A parallel lotting model has been adopted, wherein Lots 3 and 4 are mirrored Lots that cover the same scope of works. The model works on the framework pre-tendered net labour, materials and subcontractor costs, with overheads and profit and any design (only where required), being priced separately. At this stage, Arc anticipate that one supplier/entity will be awarded Lot 3 to provide the required services at the conclusion of the procurement process themselves, through their supply chain or via a consortium/joint venture arrangement. The supplier/entity will be expected to work for and cooperate with public sector clients, in-house and external consultants, contractors and other partner providers. All contract performance will be monitored using a set of comprehensive performance indicators. Works shall be delivered by the contractor and their supply chain. All services will be performed in accordance with the framework agreement.

Individual commissions called-off under the framework may be as little as 2,500 GBP or exceed 100,000 GBP.

Bidders applying for this Lot are required to have a minimum annual turnover of 400,000 GBP. Additional information: This is an award notice, meaning this opportunity has now been awarded.

Delivery: East Midlands · EAST MIDLANDS (ENGLAND)
Variant bids: not allowed
Lot #4Electrical Engineering WorksAwardedPublished value£2,500,000

Places of performance: UKF14 (Nottingham), UKF15 (North Nottinghamshire), UKF16 (South Nottinghamshire), UKE3 (South Yorkshire), UKF1 (Derbyshire and Nottinghamshire), UKF22 (Leicestershire CC and Rutland), and UKF3 (Lincolnshire CC).

The works will comprise a range of electrical engineering as noted. In addition, ancillary services will be made available by the framework partner through their own supply chain. The specific works that may be procured under the framework cannot be clearly defined at this stage. The nature and type of services may include those identified by CPV codes on or in connection with any land or property, infrastructure and related asset owned, rented, leased or developed by Nottinghamshire County Council and Arc Partnership.

The Common Procurement Vocabulary codes stated are deemed to include, for the avoidance of doubt and unless otherwise stated, the Category and Sub-category codes below the CPV codes stated, i.e. 71000000, construction related services is deemed to include 71300000, engineering services and 71314310 Heating engineering services for buildings.

This is a framework opportunity that will utilise a mix of mini-competition and direct award to allocate projects. A parallel lotting model has been adopted, wherein Lots 3 and 4 are mirrored Lots that cover the same scope of works. The model works on the framework pre-tendered net labour, materials and subcontractor costs, with overheads and profit and any design (only where required), being priced separately. At this stage, Arc anticipate that one supplier/entity will be awarded Lot 4 to provide the required services at the conclusion of the procurement process themselves, through their supply chain or via a consortium/joint venture arrangement. The supplier/entity will be expected to work for and cooperate with public sector clients, in-house and external consultants, contractors and other partner providers. All contract performance will be monitored using a set of comprehensive performance indicators. Works shall be delivered by the contractor and their supply chain. All services will be performed in accordance with the framework agreement.

Individual commissions called-off under the framework may be as little as 2,500 GBP or exceed 100,000 GBP.

Bidders applying for this Lot are required to have a minimum annual turnover of 400,000 GBP. Additional information: This is an award notice, meaning this opportunity has now been awarded.

Delivery: East Midlands · EAST MIDLANDS (ENGLAND)
Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 4 lots
Quality: 70%Price: 30%
Published sub-criteria (2)
  • Overall Quality: 70%
  • Price: 30%
Published award criteria (2)
  • Overall Quality: 70
  • Price: 30
Conditions of participation1
  • Suitability

    The procuring body expects that each bidder is suitably qualified in the field of their respective services, is registered with a relevant trade body, and can evidence this as a part of the bid.

Staff
Names and qualifications of delivery staff must be submitted
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • “Arc123 - Mechanical and Electrical Engineering Framework” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
19 Jul 2022, 19:05 BST
Last source update
23 Nov 2022, 12:05 GMT
Award evaluation window
26 Aug 2022 – …
Authority reference
Arc123
FTS notice number
2022/S 000-033199
Classification (CPV)
Architectural, construction, engineering and inspection servicesBuilding completion workBuilding installation workConstruction workConstruction-related servicesConsulting services for water-supply and waste consultancyElectrical installation workElectrical machinery, apparatus, equipment and consumables; lightingEngineering servicesInstallation services of electrical and mechanical equipment
+9 moreMechanical installationsPlumbing and heating materials
Delivery area
East Midlands (UKF)
Official registry OCID
ocds-h6vhtk-0353a0 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Performance terms

Arc will include a set of performance measures in the framework agreement and these will be used to manage the performance of the supplier, set improvement targets and drive continuous improvement. These will be the minimum indicators and other measures may be offered by bidders as part of their ITT. Performance against these indicators will be reviewed with the successful bidder at regular review meetings, together with the comparative performance that will enable benchmarking against:

— other companies engaged in Arc or other frameworks,

— the overall performance of all Arc or other frameworks,

— national performance measures where they are available.

The successful bidder will be required to collate and submit their own performance data in accordance with the performance management requirements set out in the contract. Further details can be found within the procurement documents.

Review and risk notes
Review procedure

The contracting authority will incorporate a minimum 10 calendar day standstill period at the point that an award decision notice is communicated to tenderers. The award decision notice will specify the criteria for the award of the framework agreement, the reasons for the decision, including the characteristics and relative advantages, the name and score of the successful tender and will specify when the standstill period is expected to end or the date before which the contracting authority will not conclude the framework agreement. If an appeal regarding the award of a contract has not been successfully resolved, the Public Contracts Regulations 2015, set out the time frame within which aggrieved parties who have been harmed or are at risk of a breach of the rules may take action in the High Court (England, Wales and Northern Ireland). Any such action must be brought within 30 days from the date when the economic operator in question first knew or ought to have known that grounds for the bringing of proceedings had arisen. The Court may extend the 30-day period in a particular case if it considers that there is good reason for so doing, up to a period of 3 months from the actual or deemed date of knowledge of the economic operator. The Court may order the setting aside of the award decision or may order the contracting authority to amend any document and may award damages. If the framework agreement has been entered into the Court may make a declaration of

ineffectiveness or may order that the duration of any relevant specific contract be shortened and additionally may award damages. The time limit for seeking such a declaration is generally 30 days from notification of the award (either by award decision notification or contract award notice depending on the circumstances) or otherwise 6 months. Proceedings may be instigated by the issue of a Claim Form meeting the requirements of the Court Procedure Rules (‘CPR’) within 30 days from when the relevant economic operator first knew or ought to have known that grounds for proceedings had arisen.

Publisher note: This is an award notice, meaning this contract has now been awarded. To view this notice, please click here: https://www.delta-esourcing.com/delta/viewNotice.html?noticeId=738573458 GO Reference: GO-20221123-PRO-21543420

How it was run

Official notice
Appointment period ends
26 Aug 2022, 12:00 BST
Submission channel
{"written"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
26 Aug 2022, 12:01 BST

Timeline

26 Aug 2022 → 23 Nov 2022 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    26 Aug 2022, 12:00 BST
  2. Bids opened
    26 Aug 2022, 12:01 BST
  3. Notice published
    23 Nov 2022, 12:05 GMT

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    23 Nov 2022, 12:05 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 3admitted to the panel · see the list ↓
Bids received 22 from SMEs · busiest of 4 lots
Contracts signed 4latest 16 Nov 2022

4 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 2 of these contracts carry the same published figure, £5,500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Mechanical Engineering Works

    Signed
    16 Nov 2022
    Value
    ceiling above
    Status
    active
  • Mechanical Engineering Works

    Signed
    16 Nov 2022
    Value
    ceiling above
    Status
    active
  • Electrical Engineering Works

    Signed
    16 Nov 2022
    Value
    £2,500,000
    Status
    active
  • Electrical Engineering Work

    Signed
    16 Nov 2022
    Value
    £2,500,000
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Mechanical Engineering Works1bids · 1 electronic1——
2 · Mechanical Engineering Works1bids · 1 electronic1——
3 · Electrical Engineering Works2bids · 2 electronic2——
4 · Electrical Engineering Works2bids · 2 electronic2——

Contracting authority & participating public bodies

Scape Group Limited (trading as SCAPE)

Contracting authorityPublic bodyBody governed by public lawScape Group is a public sector owned, built environment specialist supplier of framework solutions. 05660357 2nd Floor, East West Building, 1 Tollhouse Hill, Nottingham, Nottingham, East Midlands, NG1 5ATContact email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The High Court of England and WalesReview body London

Framework contractors & participating bidders

3 commercial parties on the notice

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria