Find a TenderAwarded
Published 11 Feb 2021, 10:39 GMT

Official UK procurement notice

536_21 Hire of Plant (without operator)

Official notice

Authority: ESPO

Framework agreement19 lotsGoodsOpen procedureSME suitableMax 1 lot to bid
Framework ceiling (notional)£10,000,000total for 19 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 12 Mar 2021awarded 6 Jul 2021
Lots 19max 1 to bid
Framework period 2 yrsends 30 Apr 2023 · extension options published · starts 1 May 2021

What is being bought19 lots · detail below

Published requirement description

ESPO national framework for the hire of a range of general plant (and other associated items and equipment) without operator.

To tender: (a) Go to www.eastmidstenders.org ↗, (b) Register (c) Search for tender opportunity ‘536_21’ d) Express an interest (e) Download the tender from the website.

CPV: Agricultural and forestry machinery for soil preparation or cultivation · Agricultural machinery · Compacting machinery · Crane and dumper trucks · Drilling equipment · Excavating machinery · Floodlights · Generators · Hydraulic equipment · Lifting and handling equipment · Machine tools for working concrete · Machinery for mining, quarrying, construction equipment · +6 more

How this framework works

From the published notice
Bids received
10 bids on the busiest of 18 lots · 8 suppliers appointed
Framework period
2 yrs from 1 May 2021

Lots and requirements (19)Procurement structure

19 lots · 18 with a published value · a supplier may bid for at most 1 of them · same evaluation weights on every lot

Every one of these 17 lots carries the same published figure, £500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Materials Handlers 2 yrsPublished value£1,000,000

Hire of Materials Handlers (and associated items and equipment).

The following is applicable to all lots:

ESPO has established a commercial trading company, ESPO Trading Limited, whose target clients are third sector organisations such as national and local charities, public sector mutual organisations and other organisations involved in the delivery of services to or for the public sector. The successful Supplier may be asked to enter into an additional separate framework agreement (the Second Framework) with ESPO Trading Limited on materially similar terms to that found in the tender pack to be entered into by ESPO itself.

Any Second Framework agreement will be a purely commercial agreement and will, for the avoidance of doubt, not be governed by the Public Contract Regulations 2015 or other public procurement legislation. ESPO Trading Limited may enter into the second framework agreement with the successful supplier and make it available to third sector clients who themselves are not required to follow the Public Contracts Regulations 2015 or other public procurement legislation. Accordingly, this is provided for bidders' information only.

An eAuction process may be used to award subsequent call off contracts following the reopening of competition among the parties to the Framework Agreement.

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #2Excavators 2 yrsceiling above

Hire of Excavators (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #3Kerb & Slab Lifters 2 yrsceiling above

Hire of Kerb & Slab Lifters (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #4Dumper/Skip Loaders 2 yrsceiling above

Hire of Dumper/Skip Loaders (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #5Rollers 2 yrsceiling above

Hire of Rollers (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #6Multi-Tyred Rollers 2 yrsceiling above

Hire of Multi Tyred Rollers (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #7Pumps 2 yrsceiling above

Hire of Excavators (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #8Compactors 2 yrsceiling above

Hire of Compactors (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #9Compressors and Air Tools 2 yrsceiling above

Hire of Compressors and Air Tools (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #10Breakers 2 yrsceiling above

Hire of Breakers (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #11Drilling and Fixing EquipmentAwardedLot estimate not published

Hire of Drilling and Fixing Equipment (and associated items and equipment).

Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.7 includes the option period.
Lot #12Saws / Cutters 2 yrsceiling above

Hire of Saws / Cutters (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #13Concreting Equipment 2 yrsceiling above

Hire of Concreting Equipment (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #14Hydraulic Platforms/Lifts 2 yrsceiling above

Hire of Hydraulic Platforms/Lifts (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #15Trench Support/Access Equipment 2 yrsceiling above

Hire of Trench Support/Access Equipment (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #16Generators and Floodlights 2 yrsceiling above

Hire of Generators and Floodlights (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #17Temporary Site and Office Accommodation 2 yrsceiling above

Hire of Temporary Site and Office Accommodation (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #18Hire of Horticultural and Forestry Equipment (and associated items and equipment) 2 yrsceiling above

Hire of Horticultural and Forestry Equipment (and associated items and equipment).

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed
Lot #19Other items 2 yrsceiling above

Hire of Other Items (and associated items and equipment). This includes (but is not limited to) meters, monitors, measuring devices and equipment, blowtorches, bowsers, and splitters.

Contract period: 1 May 2021 – 30 Apr 2023 (2 yrs)
Delivery: UK
Extensions: The framework agreement has the option to extend for up to a further 24 months. The total estimated value stated in Section II.1.5 includes the option period.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 19 lots
Quality: 25%Price: 70%Social value: 5%
Published award criteria (3)
  • Quality: 25
  • Social value: 5
  • Price: 70
What this means for your bid
  • Price carries 70 of 100 points: a 10% discount moves about 7 points. This one is won on the number: sharpen the price before polishing the prose.
  • “536_21 Hire of Plant (without operator)” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
11 Feb 2021, 10:39 GMT
Last source update
27 Jul 2021, 18:14 BST
Award evaluation window
12 Mar 2021 – …
Authority reference
536_21
FTS notice number
2021/S 000-002738
Classification (CPV)
Agricultural and forestry machinery for soil preparation or cultivationAgricultural machineryCompacting machineryCrane and dumper trucksDrilling equipmentExcavating machineryFloodlightsGeneratorsHydraulic equipmentLifting and handling equipment
+8 moreMachine tools for working concreteMachinery for mining, quarrying, construction equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-029219 Find a Tender
Contract terms
Performance terms

This contract will operate on-going contract monitoring procedures following award, to ensure financial stability requirements are maintained.

Credit rating checks will be carried out on a regular basis, using the credit rating agency, Creditsafe Business Solutions Limited.

Any changes will be assessed (compared with a baseline credit rating score obtained at contract award stage) and significant changes or sustained degradation will be investigated.

ESPO shall monitor the financial stability of the awarded Suppliers during the period of the Agreement by reference to credit ratings agency reports. ESPO shall obtain a credit score for the Supplier on or before the Framework start date as a base score and where a significant change in the credit score is identified over the life of the Framework Agreement, ESPO reserves the right to investigate the reasons for this significant change. Depending on the severity of the changes, it will be at the sole discretion of ESPO to suspend or even permanently remove the Supplier from the Framework Agreement.

ESPO shall monitor the Suppliers’ performance against the set framework key performance indicators.

Review and risk notes
Review procedure

ESPO will incorporate a minimum 10 calendar day standstill period at the point information on the award of the contract is communicated to tenderers. Applicants who are unsuccessful shall be informed by ESPO as soon as possible after the decision has been made as to the reasons why the applicant was unsuccessful. If an appeal regarding the award of the contract has not been successfully resolved, The Public Contracts Regulations 2015 (SI 2105 No. 102) provide for aggrieved parties who have been harmed or are at risk of harm by breach of the rules to take legal action. Any such action must be brought within the applicable limitation period. Where a contract has not been entered into, the Court may order the setting aside of the award decision or order for any document to be amended and may award damages, make a declaration of ineffectiveness, order for a fine to be paid, and/or order the duration of the contract be shortened. The purpose of the standstill period referred to above is to allow the parties to apply to the Courts to set aside the award decision before the contract is entered into.

Publisher note: As a Central Purchasing Body as defined in the Public Contracts Regulations 2015, the Framework Agreement is open for use by Public Bodies (defined at https://www.espo.org/ESPO/media/Documents/FAQs/ESPO-s_powers_to_trade__website_-2016-12-22.pdf) that also fall into one of the following classifications of user throughout all administrative regions of the UK: Local Authorities; Educational Establishments (including Academies); Central Government Departments and Agencies; Police, Fire & Rescue and Coastguard Emergency Services; NHS and HSC Bodies, including Ambulance Services; Registered Charities; Registered Social Landlords; The Corporate Office of the House of Lords, The Corporate Officer of the House of Commons; or any public body established by or under the Scotland Act 1998 or any Act of the Scottish Parliament. Details of the classification of end user establishments and geographical areas are available at: http://www.espo.org/About-us-%281%29/FAQs/Legal

How it was run

Official notice
Run through: East Midlands Tendering
Supplier login requiredLanguage: EN
Access & registration note: Free regional portal
Appointment period ends
12 Mar 2021, 12:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
120 days from the deadline
Bids opened
12 Mar 2021, 12:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

12 Mar 2021 → 27 Jul 2021 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    12 Mar 2021, 12:00 GMT
  2. Bids opened
    12 Mar 2021, 12:00 GMT
  3. Contract starts
    1 May 2021, 00:00 BST
  4. Notice published
    27 Jul 2021, 18:14 BST

Notice history

6 events · 4 releases on Find a Tender · since 11 Feb 2021
  1. Deadline published: 15 Mar 2021, 12:00 GMT
    11 Feb 2021, 12:41 GMT
  2. Status changed to complete
    27 Jul 2021, 13:52 BST
  3. Procurement method changed
    27 Jul 2021, 13:52 BST
  4. Published value published: £10,000,000
    27 Jul 2021, 18:14 BST
  5. Status changed to active
    27 Jul 2021, 18:14 BST
  6. Deadline moved to 12 Mar 2021, 12:00 GMT
    27 Jul 2021, 18:14 BST
    -3 days · was 15 Mar 2021, 12:00 GMT
Published amendments (2 · 1 deadline change)
WhenWhatBeforeAfterShift
—TextInformation about lots · II.1.6Tenders may be submitted for one lot onlyTenders may be submitted for all lots
—DeadlineTime limit for receipt of projects or requests to participate · IV.2.212 Mar 202115 Mar 2021+3 d
—Bid openingConditions for opening of tenders · IV.2.712 Mar 202115 Mar 2021+3 d

2 amendments published without a description.

Routine re-releases (4)
  • 2021-02: 1 release · 11 Feb 2021

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 8admitted to the panel · see the list ↓
Bids received 106 from SMEs · busiest of 18 lots
Contracts signed 18latest 6 Jul 2021

18 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 17 of these contracts carry the same published figure, £500,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Materials Handlers

    Signed
    6 Jul 2021
    Value
    £1,000,000
    Period
    … – 30 Apr 2023
    Status
    active
  • Breakers

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Drilling and Fixing Equipment

    Signed
    6 Jul 2021
    Value
    ceiling above
    Status
    active
  • Saws / Cutters

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Concreting Equipment

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Hydraulic Platforms/Lifts

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Trench Support/Access Equipment

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Generators and Floodlights

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Hire of Horticultural and Forestry Equipment (and associated items and equipment)

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Other items

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Excavators

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Kerb & Slab Lifters

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Dumper/Skip Loaders

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Rollers

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Multi-Tyred Rollers

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Pumps

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Compactors

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active
  • Compressors and Air Tools

    Signed
    6 Jul 2021
    Value
    ceiling above
    Period
    … – 30 Apr 2023
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Materials Handlers10bids · 10 electronic6——
2 · Excavators10bids · 10 electronic6——
3 · Kerb & Slab Lifters10bids · 10 electronic6——
4 · Dumper/Skip Loaders10bids · 10 electronic6——
5 · Rollers10bids · 10 electronic6——
6 · Multi-Tyred Rollers10bids · 10 electronic6——
7 · Pumps10bids · 10 electronic6——
8 · Compactors10bids · 10 electronic6——
9 · Compressors and Air Tools10bids · 10 electronic6——
10 · Breakers10bids · 10 electronic6——
11 · Drilling and Fixing Equipment10bids · 10 electronic6——
12 · Saws / Cutters10bids · 10 electronic6——
13 · Concreting Equipment10bids · 10 electronic6——
14 · Hydraulic Platforms/Lifts10bids · 10 electronic6——
15 · Trench Support/Access Equipment10bids · 10 electronic6——
16 · Generators and Floodlights10bids · 10 electronic6——
18 · Hire of Horticultural and Forestry Equipment (and associated items and equipment)10bids · 10 electronic6——
19 · Other items10bids · 10 electronic6——

Contracting authority & participating public bodies

ESPO

Contracting authorityRegional or local authorityLocal Authority Services Barnsdale Way, Grove Park, Enderby, Leicester, East Midlands, LE19 1ESContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • The Royal Court of JusticeReview body London

Framework contractors & participating bidders

12 commercial parties on the notice
Show 2 more suppliers

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria