Find a TenderAwardedContract details notice
Published 10 Feb 2026, 13:30 GMT

Official UK procurement notice

3015 Multiaxial Axial-Torsional Fatigue Testing System

Official notice

Authority: Nottingham Trent University (Education)

GoodsOpen procedureAbove thresholdSME suitable
Published estimate£300,000≈ £97k / year · £360,000 inc. VAT10% below published estimate
Submissions closed 9 Mar 2026awarded 18 May 2026
Awarded to Instron
Contract term 3 yrs 1 moends 30 Sept 2029 · starts 15 Sept 2026

What is being bought

Published requirement description

A fatigue-rated electromechanical (non-hydraulic) axial-torsional testing system capable of simultaneous and independently controlled axial and torsional loading, suitable for static and dynamic testing in tension, compression, and combined modes.

  • No preliminary market engagement: Time constraints for an externally funded project

CPV: Machines and apparatus for testing and measuring · Strength estimation apparatus · Structure estimation apparatus

The lotProcurement structure

single lot · value published
Lot #1Awarded 3 yrs 1 moSMEPublished value£300,000
Contract period: 15 Sept 2026 – 30 Sept 2029 (3 yrs 1 mo)Value: £300,000 exc. VAT · £360,000 inc. VAT
Delivery: East MidlandsEligibility: SME eligible
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    See Tender Documentation

  • Technical & professional ability

    See tender Documentation

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 65%Price: 35%
Published sub-criteria (7)
  • Technical Compliance: 21%
  • Technical Compliance: 12%
  • Technical Compliance: 8%
  • Value Added: 4%
  • Service Delivery: 10%
  • Strategic Commitments: 10%
  • Commercial Offer: 35%
Published award criteria (7)
  • Technical Compliance: Loading
  • Technical Compliance: Control
  • Technical Compliance: Software & PC hardware
  • Value Added: Collaboration and Strategic Partnership
  • Service Delivery: Details of delivery lead times, installation, commissioning, training, warranty and maintenance packages.
  • Strategic Commitments: Sustainability
  • Commercial Offer: Whole Life Costing (up to five years)
Conditions of participation2
  • Economic & financial standing

    See Tender Documentation

  • Technical & professional ability

    See tender Documentation

What this means for your bid
  • Price carries 35 of 100 points: a 10% discount moves about 3.5 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
10 Feb 2026, 13:30 GMT
Last source update
5 Aug 2026, 12:00 BST
Award evaluation window
Submission end – 15 Apr 2026
Authority reference
3015
FTS notice number
2026/S 000-011884
Latest notice
Contract details notice (UK7)
Classification (CPV)
Machines and apparatus for testing and measuringStrength estimation apparatusStructure estimation apparatus
Delivery area
East Midlands (UKF14)
Official registry OCID
ocds-h6vhtk-064c8f Find a Tender
Contract terms summary

30 days in arrears from the submission of a correct invoice

Review and risk notes
Risks

Delivery of the equipment is to be made at the earliest possible convenience but must be no later than the 15th of September 2026 due to the requirements of delivering projects

How it was run

Official notice
Run through: EU-Supply (CTM) · Who buys & how to bid on EU-Supply
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free · 5–10 minutes
Submission deadline
9 Mar 2026, 10:00 GMT
Clarification deadline
2 Mar 2026
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

10 Feb 2026 → 15 Sept 2026 · 8 dates
  1. Tender notice published254 days ago
    10 Feb 2026, 13:30 GMT
  2. Clarification questions by235 days ago
    2 Mar 2026
  3. Submission deadline227 days ago
    9 Mar 2026, 10:00 GMT
  4. Award decision expected by190 days ago
    15 Apr 2026, 23:59 BST
  5. Assessment summaries sent158 days ago
    18 May 2026, 00:00 BST
  6. Standstill ends147 days ago
    28 May 2026, 23:59 BST
  7. Latest notice published78 days ago
    5 Aug 2026, 12:00 BST
  8. Contract starts38 days ago
    15 Sept 2026

Notice history

5 events · 3 releases on Find a Tender · since 10 Feb 2026
  1. Tender notice published
    10 Feb 2026, 13:30 GMT
    UK4
  2. Contract award notice published
    18 May 2026, 10:27 BST
    UK6
  3. Status changed to complete
    18 May 2026, 10:27 BST
  4. Contract signature expected
    29 May 2026, 23:59 BST
    scheduled
  5. Contract details notice published
    5 Aug 2026, 12:00 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £270,1221 award exc. VAT
Bids received 21 from SMEs
Contracts signed 1latest 29 Jul 2026
Awarded toValueDateStatus
InstronPurchase of an Multiaxial Axial-Torsional Fatigue Testing System1 Jun 2026 – 31 Jul 2029£270,12218 May 2026Awarded

Contracts

  • 3015 Multiaxial Axial-Torsional Fatigue Testing System · Instron

    Signed
    29 Jul 2026
    Value
    £326,834
    Period
    29 Jul 2026 – 31 Jul 2031
    Status
    active
    3 agreed KPIs: Engineer response time to site under warranty. · Re-calibration of all transducers (load cells, extensometers etc) · On-site warranty repair includes all travel, parts, and labour.
    • Engineer response time to site under warranty., 1 to 3 working days
    • Re-calibration of all transducers (load cells, extensometers etc), Part of extended warranty in years 2 and 3 and maintenance contract in years 4 and 5.
    • On-site warranty repair includes all travel, parts, and labour.

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders10—

Contracting authority & participating public bodies

Nottingham Trent University

Contracting authorityPublic authority - sub-central government GB-PPON: PLJN-1931-JMHG 50 Shakespeare Street, Nottingham, East Midlands, NG1 4FQContact name, email, phone

Bidders & participating suppliers

1 commercial party on the notice
  • InstronAwarded supplierGB-PPON: PGGX-2826-LVCT CORONATION ROAD HP12 3SY, HIGH WYCOMBE, BUCKINGHAMSHIRE, South East, HP12 3SYContact email, phone

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender