Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 1,051–1,065
- Ends · in 114 days
Purbrook Park School - Windows and Door Replacement
Hampshire County Council · Local authority · South East England
Incumbent: Joedan Manufacturing (UK) Ltd
Replacement of single glazed timber and metal windows and external doors with aluminium.
- Published value
- £396k
- Annual run-rate
- —term under 6 months
- Term
- 23 Nov 2026 → 19 Feb 2027 · 3 months
- Reference
ocds-h6vhtk-0789cf
- Ends · in 114 days
England Coastal Paths IOW2
Isle of Wight NHS Trust · Local authority · South East England
Incumbent: M.C.M. CONSTRUCTION LIMITED
the provision of works to the England coastal path section IOW2, Wootton Bridge to Culver. The King Charles III England Coast Path (ECP) is a nationwide initiative to provide a 2,700-mile National Trail and is being funded through Natural E…
- Published value
- £313k
- Annual run-rate
- —term under 6 months
- Term
- 14 Sept 2026 → 19 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-065ddb
- Ends · in 114 days
57 Chase Vale Refurb
Lichfield District Council · Local authority · West Midlands
Incumbent: Tyrer Building Contractors Ltd
Reconfiguration to create a more accessible bungalow. The bungalow will have a level access shower, accessible kitchen and door widenings throughout.
- Published value
- £87k
- Annual run-rate
- —term under 6 months
- Term
- 26 Oct 2026 → 19 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-078e9e
- Estimated end · in 115 days
East Region (Moray and Aberdeenshire)
Forestry and Land Scotland · Scotland
Incumbent: CR Contractors Tain Limited · Last contest: 2 bids (2 SME)
- Published value
- £3.0mlist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 20 Feb 2027 · start not published
- Reference
ocds-h6vhtk-0316a7
- Estimated end · in 115 days
East Region (Moray and Aberdeenshire)
Forestry and Land Scotland · Scotland
Incumbent: CR Contracting North LTD · Last contest: 2 bids (2 SME)
- Published value
- £3.0mlist or panel total repeated on every provider; not this contract's value
- Annual run-rate
- —list or panel total, not a run-rate
- Term
- Estimated end 20 Feb 2027 · start not published
- Reference
ocds-h6vhtk-0316a7
- Estimated end · in 116 daysCall-offPanel · 9 suppliers
South East England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 16 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 116 daysCall-offPanel · 9 suppliers
London
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 17 bids (1 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 116 daysCall-offPanel · 11 suppliers
South West England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BAM CONSTRUCTION LIMITED, Bouygues UK, Galliford Try Construction Limited +8 more · Last contest: 11 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.1bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 116 daysCall-offPanel · 7 suppliers
West Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: AJC Developments (South) Ltd, Halsall Construction Ltd, Kier Construction Ltd +4 more · Last contest: 10 bids (6 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 116 daysCall-offPanel · 6 suppliers
East Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: E.W. Beard Limited, Halsall Construction Ltd, Kier Construction Ltd +3 more · Last contest: 12 bids (5 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 116 daysFramework recordPanel · 16 suppliers
Fusion21 Painting, Decorating and Associated Repairs Framework
Fusion21 Members Consortium · Nationwide (UK)
Panel: A Connolly Limited, Alfred Bagnall & Sons (North West) Limited, Architectural Decorators Ltd +13 more
- Published value
- £125mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-038b4b
- Estimated end · in 116 days
Hydrogen Campus - Site Infrastructure Works
Energy Transition Zone Limited · Scotland
Incumbent: CHAP Group (Aberdeen) Ltd · Last contest: 2 bids (2 SME)
ETZ Ltd has a requirement to appoint a suitably qualified firm who can complete the site infrastructure works, located at ETZ Hydrogen Campus, Aberdeen.
- Published value
- £4.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-05cf1b
- Ends · in 116 days
72 London Road Refurbishment
Cross Keys Homes · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: BSG PROPERTY SERVICES
CKH intends to undertake remedial works to the vacant property at 72 London Road, Peterborough to create a 5 room HMO using Cross Keys Homes' component specifications. The tender is to be priced against all elements of work individually to …
- Published value
- £180k
- Annual run-rate
- —term under 6 months
- Term
- 21 Sept 2026 → 21 Feb 2027 · 5 months
- Reference
ocds-h6vhtk-07773b
- Estimated end · in 117 daysFramework record
Provision of Competitive Land, Design and Build Framework for NIHE Belfast, North and South Regions
Arbour Housing · Northern Ireland
Incumbent: ADVANCE ACCOUNTING NI LTD
- Published value
- £35mpublished ceiling for the whole framework
- Annual run-rate
- —framework or DPS value, not a run-rate
- Term
- Estimated end 22 Feb 2027 · start not published
- Reference
ocds-h6vhtk-04c156
- Ends · in 117 days
Lotherton Hall – Kiosk Replacement
Leeds City Council · Local authority · Yorkshire and the Humber
Incumbent: Igloo Contractors Ltd · Last contest: awarded 11% under the estimate
Leeds Building Services (LBS) have a requirement for a subcontractor to design, supply, and install a replacement visitor kiosk at the Lotherton Hall Estate. The existing kiosk, over 20 years old, has reached the end of its operational life…
- Published value
- £27k
- Annual run-rate
- —term under 6 months
- Term
- 4 Jan 2027 → 22 Feb 2027 · 2 months
- Reference
ocds-h6vhtk-06d853
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.