Dorset HealthCare University NHS Foundation Trust: Contract Register & Procurement Profile
NHS ODS: NHS TRUST·Central government·South West England·Poole
Official UK PPONPNYJ-1818-YVWWWebsitedorsethealthcare.nhs.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
90 awarded tenders, 67 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| DHC DH1389 Recovery Houses and Step-Down Bed Provision | 1 Oct 2026 | 1d | £3,860,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
85 Health and social work services3 procedures · 3% · 1 open90 Sewage, refuse, cleaning and environmental1 procedures · 1%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 89 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 100% (89 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Direct award 57% (51 notices)
- Limited / restricted 38% (34 notices)
- Open 3% (3 notices)
- Route not published 1% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 1 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 89 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| SineWave Electrical Contractors Ltd | 4 | 4.4% | 4 | 4 | 22 Sept 2026 |
| A HAMMOND& SONS LTD | 4 | 4.4% | 4 | 4 | 19 Aug 2026 |
| Westmade Ltd | 4 | 4.4% | 4 | 4 | 1 Jun 2026 |
| Spetisbury Construction | 4 | 4.4% | 4 | 4 | 26 Aug 2026 |
| A S Mechanical & Electrical Ltd | 3 | 3.3% | 3 | 3 | 3 Jul 2025 |
| Sci Fire Protection Ltd | 3 | 3.3% | 3 | 3 | 29 May 2026 |
| Southern Piped Services Ltd | 3 | 3.3% | 3 | 3 | 27 Aug 2026 |
| Synertec Limited | 2 | 2.2% | 2 | 2 | 1 Jun 2026 |
The three most frequent suppliers are named on 13% of 90 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 67 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Alderney Hospital Herm Ward New Build & Refurbishment Works | A HAMMOND& SONS LTD | — | 11 mo | £1,384,426 † |
| Winton Clinic Remodel and Refurbishment Works | Spetisbury Construction | — | 5 mo | £1,063,106 † |
| St Anns 1980s Wing Ventilation system replacement works | Dixon Mechanical Services | — | 2 mo | £474,748 † |
| St Anns Replacement Ventilation Plant 1980s Wing Phase 2 Works | DIXON MECHANICALSERVICES LTD | — | 1 mo | £460,434 † |
| Fire Compartmentation Works at Victoria Hospital Wimborne | Sci Fire Protection Ltd | — | 2 mo | £241,880 † |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 85 of 96 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| DM One Medical Physician User Licenses | Nuance Communications Ireland Limited | 12 Oct 2026 | £54,540 |
| Dorset ME Support Group - Self care co-ordinato | Dorset ME Support Group | 30 Oct 2026 | £34,000 |
| St Leonards Electrical Panel Board Replacement Works | SineWave Electrical Contractors Ltd | 31 Oct 2026 | £158,874 |
| Bill Validation & Cost Recovery Service DH1060 | TEAM (Energy Auditing Agency Ltd) | 24 Nov 2026 | £26,666 |
| Wareham Hospital Hot Water Plant Replacement Works | Southern Piped Services Ltd | 30 Nov 2026 | £36,297 |
| Healthcare Communications Annual Support and Monthly usage fees | Healthcare Communications UK Limited | 14 Dec 2026 | £26,153 |
| Phoenix Software Windows 10 Extended Support Licences | Phoenix Software Ltd | 31 Dec 2026 | £54,900 |
| QBTECH ADHD Management System | QBTECH LIMITED | 31 Dec 2026 | £14,752 |
| AP Training Delivery for experienced trainers | QA Limited | 31 Jan 2027 | £11,750 |
| ILM Level 5 Certificate in Effective Coaching and Mentoring | Mission Inc | 16 Feb 2027 | £19,950 |
Soonest 10 of 25 contracts ending within 18 months.
Recent procedures
Latest 50 of 95 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| DHC DH2026-020 Emergency Lighting Replacement- Canford Wd., St Leonards Hospital | Awarded / complete | 9 Mar 2026 | — |
| Fire Compartmentation Works at Victoria Hospital Wimborne | Awarded / complete | 26 Feb 2026 | — |
| St Anns 1980s Wing Ventilation system replacement works | Awarded / complete | 26 Feb 2026 | — |
| Mains Electrical Panel Board Works St Anns Hospital 1980s Wing | Awarded / complete | 26 Feb 2026 | — |
| TAP Training Delivery for experienced trainers | Awarded / complete | 25 Feb 2026 | — |
| Healthcare Communications Annual Support and Monthly usage fees | Awarded / complete | 18 Feb 2026 | — |
| Replacement Fire Detection System for St Anns Hospital | Awarded / complete | 17 Feb 2026 | — |
| Mains Electrical Panel Board for St Anns Hospital 1980s Wing | Awarded / complete | 17 Feb 2026 | — |
| Kings Park Hospital Door Replacement Doors | Awarded / complete | 17 Feb 2026 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£7.9m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 86 award records on 86 procedures (86 to a single canonical supplier, 0 multi-supplier). 86 values come from the contract record when the award carried none.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 85 of 96 published contracts carry a period end; 25 end within 18 months, 17 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (5 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PNYJ-1818-YVWW