Find a TenderCancelled
Published 11 Oct 2023, 11:04 BST

Official UK procurement notice

YPO - 1211 The Supply of Sports Equipment and Sports Play Equipment, Sports Posts, Nets, Goals and Sports Balls

Official notice

Authority: YPO

Framework agreement28 lotsGoodsOpen procedure
Framework ceiling (notional)£20,000,000total for 28 lots · framework ceiling, not attributable revenue
Submissions closed 13 Nov 2023
Lots 28see the lot list below
Framework period 4 yrsends 31 Dec 2027 · extension options published · starts 1 Jan 2024

What is being bought28 lots · detail below

Published requirement description

YPO are looking for Providers to be appointed onto a Framework Agreement for the supply of Sports Play Equipment and Sports Equipment, including accessories, Sports Posts, Nets, Goals and Balls for use primarily in the education market. On some Lots we require own branding on certain products. We require providers to work with us to further develop all Lots and expand the full YPO range.

This Framework is designed to meet the needs of YPO by establishing an agreement for providers to deliver stock into YPO’s distribution centre in Wakefield, West Yorkshire and/or establishing an agreement for providers to deliver to YPO customers on a direct basis whereby the end customer places the order with YPO and YPO places the order with the provider but the provider delivers direct to the customer.

  • Recurrence: There is a possibility that this framework will be renewed after 3.5 years from the commencement date.

CPV: Athletics equipment · Badminton equipment · Basketballs · Bottles · Field and court sports equipment · Field hockey balls · Field hockey sticks · Field sports equipment · Footballs · Handballs · Racquet and court sports equipment · Sports goods and equipment · +5 more

How this framework works

From the published notice
Framework period
4 yrs from 1 Jan 2024

Lots and requirements (28)Procurement structure

25 of 28 loaded on this page

Showing the first 25 of 28 published lots; the full list is in the JSON and Markdown mirrors of this notice. 28 lots · no lot values published · same evaluation weights on every lot.

Lot #1Sports Play EquipmentCancelledRenewal 4 yrs

Sports Play Equipment

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #2Sports Play Equipment & AccessoriesCancelledRenewal 4 yrs

Sports Play Equipment & Accessories

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #3Water BottlesCancelledRenewal 4 yrs

Water Bottles

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #4Athletics Kits & Athletics AccessoriesCancelledRenewal 4 yrs

Athletics Kits & Athletics Accessories

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #5Tennis & Badminton RacketsCancelledRenewal 4 yrs

Tennis & Badminton Rackets

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #6Tennis & Badminton PostsCancelledRenewal 4 yrs

Tennis & Badminton Posts

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #7Netball & Basketball PostsCancelledRenewal 4 yrs

Netball & Basketball Posts

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #8Football & Rugby PostsCancelledRenewal 4 yrs

Football & Rugby Posts

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #9UPVC PostsCancelledRenewal 4 yrs

UPVC Posts

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #10Hockey SticksCancelledRenewal 4 yrs

Hockey Sticks

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #11Rounders BatsCancelledRenewal 4 yrs

Rounders Bats

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #12Table Tennis BatsCancelledRenewal 4 yrs

Table Tennis Bats

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #13Table Tennis TablesCancelledRenewal 4 yrs

Table Tennis Tables

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #14BasketballsCancelledRenewal 4 yrs

Basketballs

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #15Cricket BallsCancelledRenewal 4 yrs

Cricket Balls

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #16DodgeballsCancelledRenewal 4 yrs

Dodgeballs

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #17Hockey BallsCancelledRenewal 4 yrs

Hockey Balls

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #18NetballsCancelledRenewal 4 yrs

Netballs

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #19Rugby BallsCancelledRenewal 4 yrs

Rugby Balls

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #20HandballCancelledRenewal 4 yrs

Handball

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #21Table Tennis BallCancelledRenewal 4 yrs

Table Tennis Ball

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #22VolleyballCancelledRenewal 4 yrs

Volleyball

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #23Badminton ShuttlecockCancelledRenewal 4 yrs

Badminton Shuttlecock

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #24Tennis BallCancelledRenewal 4 yrs

Tennis Ball

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed
Lot #25Footballs (match, training & other)CancelledRenewal 4 yrs

Footballs (match, training & other)

Contract period: 1 Jan 2024 – 31 Dec 2027 (4 yrs)
Delivery: UK
Extensions: The Framework Agreement will cover the period from 1st January 2024 to 31st December 2025 with two options to extend for an additional 12 months. The first decision to extend the Framework period will be taken by the end of May 2025 and will be dependent on satisfactory completion of all aspects of the Framework to date, the current market conditions for this category and YPO’s contracting structures. The maximum Framework period will therefore be 4 years, from 1st January 2024 to 31st December 2027 (subject to an annual review, incorporating price negotiations and KPI performance). · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.Variant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 28 lots
Quality: 40%Price: 50%Social value: 10%
Published sub-criteria (4)
  • Quality: 25%
  • Delivery and Customer Service: 15%
  • price: 50%
  • Social Value /Sustainability: 10%
Published award criteria (4)
  • Quality: 25%
  • Delivery and Customer Service: 15%
  • Social Value /Sustainability: 10%
  • Price: 50%
Conditions of participation1
  • Suitability

    Organisations must ensure that they are not in breach of any of the mandatory or discretionary exclusions contained in Regulation 57 of the Public Contracts Regulations 2015. Please refer to the

    Tender Documentation/ Online Tender located on our E-Procurement system. The web address can be found under ‘Procurement Documents’ in ‘Communication’ section in this notice.

What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “YPO - 1211 The Supply of Sports Equipment and Sports Play Equipment,…” is a framework: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Cancelled
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · There is a possibility that this framework will be renewed after 3.5 years from the commencement date.
First published
11 Oct 2023, 11:04 BST
Last source update
28 Feb 2024, 13:59 GMT
Award evaluation window
13 Nov 2023 – …
Authority reference
1211
FTS notice number
2024/S 000-006395
Classification (CPV)
Athletics equipmentBadminton equipmentBasketballsBottlesField and court sports equipmentField hockey ballsField hockey sticksField sports equipmentFootballsHandballs
+7 moreRacquet and court sports equipmentSports goods and equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-040af5 Find a Tender
Contract terms
Performance terms

Please refer to the Framework Agreement Terms and Conditions located on our E-Procurement system. The web address can be found under Procurement Documents in ‘Communication’ Section in this notice.

Publisher note: YPO are purchasing on the behalf of other contracting authorities. Please see the below link for details: https://www.ypo.co.uk/about/customers/permissible-users . YPO will incorporate a standstill period at the point of notification of the award of the contract is provided to all bidders. The standstill period will be for a minimum of 10 calendar days, and provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into. The Public Contracts Regulations 2015 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
13 Nov 2023, 14:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
90 days from the deadline
Bids opened
13 Nov 2023, 14:00 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

13 Nov 2023 → 28 Feb 2024 · 4 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    13 Nov 2023, 14:00 GMT
  2. Bids opened
    13 Nov 2023, 14:00 GMT
  3. Contract starts
    1 Jan 2024
  4. Notice published
    28 Feb 2024, 13:59 GMT

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to cancelled
    28 Feb 2024, 13:59 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1

Contracting authority & participating public bodies

YPO

Contracting authorityBody governed by public lawGeneral public services 41 Industrial Park, Wakefield, UK, WF2 0XEContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • High Court of England and WalesReview body London

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria