W722 - Longbridge Weir Hydroelectric Plant Maintenance
Authority: Derby City Council (Local council)
What is being bought
Published requirement descriptionThe Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning.
The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation.
Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-houremergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.
The lotProcurement structure
single lot · no lot value publishedProcedure terms & legal framework
From the official record- Procedure method
- Direct award
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 29 Jan 2026, 11:09 GMT
- Last source update
- 1 Apr 2026, 11:08 BST
- Authority reference
W722- FTS notice number
2026/S 000-030223- Latest notice
- Contract details notice (UK7)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0611c0Find a Tender
- Why no open competition
- Switching Direct Award
- Published justification
The Longbridge Weir Hydro Power House was built in 2011, primarily to power the Council House. Derwent Hydroelectric Power Ltd were the original contractor for the project and have serviced the plant ever since.
The plant has now been operational for 14 years and some larger parts of the plant are at risk of failure due to age and will require replacement in the coming 5 years.
This contract has been procured twice via a VEAT Notice (now replaced by the Transparency Notice under the Procurement Act 2023) since 2021 and has received no challenges in that time. It was last tendered in 2017, when only two bids were received, and the one not from the incumbent supplier was significantly higher in price. The likely reasons for this are:
- There are a limited number of contractors in this highly specialist field, and the majority are unable to cost effectively provide the 24-hour emergency back-up which the plant requires (Derwent
Hydroelectric Power Ltd are locally based at Matlock Bath).
- Derwent Hydroelectric Power Ltd, having originally constructed the plant are very familiar with its construction, which puts off other contractors.
- The scale of the operation is very small, meaning other contractors consider it a high risk. This situation has not changed in the intervening years and is unlikely to in the future.
In addition to the above, Derwent Hydroelectric Power Ltd has performed well, having worked to improve plant efficiency and reduce operational spend.
Direct award is permitted under the Procurement Act 2023, Schedule 5, item 6 (a) due to an absence of competition for technical reasons, only a particular supplier can supply the goods, services or works required.
How it was run
Official notice- Submission deadline
- —
Timeline
9 Feb 2026 → 1 Apr 2026 · 2 dates- Standstill ends259 days ago9 Feb 2026, 23:59 GMT
- Notice published208 days ago1 Apr 2026, 11:08 BST
Notice history
4 events · 3 releases on Find a Tender · since 29 Jan 2026- Transparency notice published29 Jan 2026, 11:09 GMTUK5
- Contract award notice published29 Jan 2026, 11:36 GMTUK6
- Contract signature expected19 Mar 2026, 23:59 GMTscheduled
- Contract details notice published1 Apr 2026, 11:08 BSTUK7
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| DERWENT HYDROELECTRIC POWER LIMITED1 Apr 2026 – 31 Mar 2031 | £730,000 | 7 Jan 2026 | Awarded |
Contracts
W722 - Longbridge Weir Hydroelectric Plant Maintenance · DERWENT HYDROELECTRIC POWER LIMITED
- Signed
- 19 Mar 2026
- Value
- £730,000
- Period
- 1 Apr 2026 – 31 Mar 2031
- Status
- active
No agreed KPIs: Contract not above £5 million
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- DERWENT HYDROELECTRIC POWER LIMITEDAwarded supplier
Official documents & specifications (3)
Official links; attachments are not copiedNotices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Transparency notice Transparency notice on Find a Tender