TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

W722 - Longbridge Weir Hydroelectric Plant Maintenance

No classification published
Location not published
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Derby City Council: "W722 - Longbridge Weir Hydroelectric Plant Maintenance". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityDerby City CouncilScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Derby City Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Derby City Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
9.1Bids / Report
0% of reports have one bid
Supplier ConcentrationHigh Concentration
Citizens Advice Mid MerciaTop vendor: 100% of attributable value
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 168 active published awards; 10 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers With This Authority:
Supplier NameHistoric AwardsAttributable GBP Value
Citizens Advice Mid Mercia1 win£389,500
Procedure terms
Contracting AuthorityDerby City Council
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published1 Apr 2026, 11:08 BST
Last source update1 Apr 2026, 11:08 BST
Recurring procurementNot published
ClassificationNot published
Delivery areaLocation not published
OCIDocds-h6vhtk-0611c0
What is being bought
The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning. The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation. Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-houremergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.
What changed
From the official release history
  1. Official notice release published
    1 Apr 2026, 11:08 BST
  2. Official notice release published
    29 Jan 2026, 11:36 GMT
  3. Status changed to complete
    29 Jan 2026, 11:09 GMT
  4. Official notice release published
    29 Jan 2026, 11:09 GMT
  5. Buyer information updated
    29 Jan 2026, 11:09 GMT
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    complete
    Published valueNot published
    The source published no individual title or description for this lot.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    1 Apr 2026, 11:08 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £730,000
Commercial outcome and competition
Awards
DERWENT HYDROELECTRIC POWER LIMITED
Not published · Not published · active
Contracts
W722 - Longbridge Weir Hydroelectric Plant Maintenance
£730,000 · signed 19 Mar 2026, 00:00 GMT · active
Contract period: 1 Apr 2026, 00:00 BST31 Mar 2031, 23:59 BST
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Derby City Council

Contracting authority GB-PPON-PQVM-1383-ZBXP
View buyer profile
  • Derby City Council
    buyer

    GB-PPON: PQVM-1383-ZBXP
    The Council House - Corporation Street, Derby, UKF11, DE1 2FS, GB
  • DERWENT HYDROELECTRIC POWER LIMITED
    supplier

    GB-COH: 02227448 · GB-PPON: PHZG-3177-ZGZQ
    Sir Richard Arkwright's Masson Mills, Matlock Bath, UKF13, DE4 3PY, GB
Documents (1)
Official links; attachments are not copied
  • Not published

    tender
    conflictOfInterest
Related procedures (0)
No data
No related procedures published
Planning and rationale
Planning budgetNot published
No-engagement rationaleNot published
Procedure rationaleThe Longbridge Weir Hydro Power House was built in 2011, primarily to power the Council House. Derwent Hydroelectric Power Ltd were the original contractor for the project and have serviced the plant ever since. The plant has now been operational for 14 years and some larger parts of the plant are at risk of failure due to age and will require replacement in the coming 5 years. This contract has been procured twice via a VEAT Notice (now replaced by the Transparency Notice under the Procurement Act 2023) since 2021 and has received no challenges in that time. It was last tendered in 2017, when only two bids were received, and the one not from the incumbent supplier was significantly higher in price. The likely reasons for this are: - There are a limited number of contractors in this highly specialist field, and the majority are unable to cost effectively provide the 24-hour emergency back-up which the plant requires (Derwent Hydroelectric Power Ltd are locally based at Matlock Bath). - Derwent Hydroelectric Power Ltd, having originally constructed the plant are very familiar with its construction, which puts off other contractors. - The scale of the operation is very small, meaning other contractors consider it a high risk. This situation has not changed in the intervening years and is unlikely to in the future. In addition to the above, Derwent Hydroelectric Power Ltd has performed well, having worked to improve plant efficiency and reduce operational spend. Direct award is permitted under the Procurement Act 2023, Schedule 5, item 6 (a) due to an absence of competition for technical reasons, only a particular supplier can supply the goods, services or works required.