Find a Tender
complete
Official procurement procedure
W722 - Longbridge Weir Hydroelectric Plant Maintenance
No classification published
Location not published
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Derby City Council: "W722 - Longbridge Weir Hydroelectric Plant Maintenance". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Derby City Council | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Derby City Council
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Derby City Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
9.1Bids / Report
Supplier ConcentrationHigh Concentration
Citizens Advice Mid MerciaTop vendor: 100% of attributable valuePayment Terms
Check noticePublished terms
Coverage: 168 active published awards; 10 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Historical Awarded Suppliers With This Authority:
| Supplier Name | Historic Awards | Attributable GBP Value |
|---|---|---|
| Citizens Advice Mid Mercia | 1 win | £389,500 |
Procedure terms
Contracting AuthorityDerby City Council | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published1 Apr 2026, 11:08 BST | Last source update1 Apr 2026, 11:08 BST | Recurring procurementNot published |
ClassificationNot published | ||
Delivery areaLocation not published | ||
OCIDocds-h6vhtk-0611c0 | ||
What is being bought
The Longbridge Weir Hydropower House was constructed in 2011 to generate renewable electricity, primarily for the Council House. Derwent Hydroelectric Power Ltd was the original designer and constructor of the installation and has provided operation and maintenance services since commissioning.
The plant has now been operational for approximately 14 years. As it approaches the later stages of its asset lifecycle, several major components are at increased risk of failure due to age and will require replacement within the next five years. Ongoing operation and maintenance therefore require specialist technical knowledge of the original design and construction of the installation.
Accordingly, a direct award is permitted under the Procurement Act 2023, Schedule 5, item 6(a), as competition is absent for technical reasons and only a particular supplier can supply the required services. The market for contractors capable of maintaining and upgrading a small-scale hydropower installation of this nature is extremely limited. The plant requires a cost-effective 24-houremergency response capability, which most specialist providers are unable to deliver. Derwent Hydroelectric Power Ltd is locally based, enabling this requirement to be met. As the original constructor, the supplier also has detailed and unique knowledge of the plant, presenting a significant technical barrier to alternative providers. The small scale of the installation further reduces commercial viability for other contractors. These market conditions are not expected to change.
What changed
From the official release history
- Official notice release published
1 Apr 2026, 11:08 BST - Official notice release published
29 Jan 2026, 11:36 GMT - Status changed to complete
29 Jan 2026, 11:09 GMT - Official notice release published
29 Jan 2026, 11:09 GMT - Buyer information updated
29 Jan 2026, 11:09 GMT
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcompletePublished valueNot publishedThe source published no individual title or description for this lot.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
1 Apr 2026, 11:08 BST - Award active
Not published · Not published - Contract active
Signed 19 Mar 2026, 00:00 GMT · £730,000
Commercial outcome and competition
Awards DERWENT HYDROELECTRIC POWER LIMITED Not published · Not published · active |
Contracts W722 - Longbridge Weir Hydroelectric Plant Maintenance £730,000 · signed 19 Mar 2026, 00:00 GMT · active Contract period: 1 Apr 2026, 00:00 BST — 31 Mar 2031, 23:59 BST |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Derby City Council
Contracting authority GB-PPON-PQVM-1383-ZBXPDocuments (1)
Official links; attachments are not copied
Related procedures (0)
No related procedures published
Planning and rationale
Planning budgetNot published |
No-engagement rationaleNot published |
Procedure rationaleThe Longbridge Weir Hydro Power House was built in 2011, primarily to power the Council House. Derwent Hydroelectric Power Ltd were the original contractor for the project and have serviced the plant ever since.
The plant has now been operational for 14 years and some larger parts of the plant are at risk of failure due to age and will require replacement in the coming 5 years.
This contract has been procured twice via a VEAT Notice (now replaced by the Transparency Notice under the Procurement Act 2023) since 2021 and has received no challenges in that time. It was last tendered in 2017, when only two bids were received, and the one not from the incumbent supplier was significantly higher in price. The likely reasons for this are:
- There are a limited number of contractors in this highly specialist field, and the majority are unable to cost effectively provide the 24-hour emergency back-up which the plant requires (Derwent
Hydroelectric Power Ltd are locally based at Matlock Bath).
- Derwent Hydroelectric Power Ltd, having originally constructed the plant are very familiar with its construction, which puts off other contractors.
- The scale of the operation is very small, meaning other contractors consider it a high risk. This situation has not changed in the intervening years and is unlikely to in the future.
In addition to the above, Derwent Hydroelectric Power Ltd has performed well, having worked to improve plant efficiency and reduce operational spend.
Direct award is permitted under the Procurement Act 2023, Schedule 5, item 6 (a) due to an absence of competition for technical reasons, only a particular supplier can supply the goods, services or works required. |