Official UK procurement notice
UK public contract notice
Authority: Scottish Hydroelectric Transmission Plc·Consortium: 5 public authorities
What is being bought6 lots · detail below
Published requirement descriptionThe tendered works include for the design, supply, installation, testing and commissioning of electricity transmission underground cable works as part of the Skye 132kV Reinforcement scheme.
The works consist of 24km of new 132kV double circuit, two cable per phase (see figure 1 below).
These works include:
• Undergrounding of the section of the new 132kV double circuit from the East side of Loch Ainort for15km to the West side of Loch Sligachan. Including a single fibre optic cable.
• Laying of haul roads and accesses to the cables and sealing end compounds.
• All associated substation and SEC tie in works
• Reinstatement on completion of all works.
CPV: Construction work for electricity power lines · Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork · Electricity distribution · Electricity distribution and control apparatus · High-voltage cable · Installation of cable laying
How this framework works
From the published notice- Electronic auction
- yes
Lots and requirements (6)Procurement structure
6 lots · no lot values publishedLot #1Skye 132kV ReinforcementCancelled
- Extensions
- The contract is divided into two parts: Part A (design) Part B (construction) Under Part A, the Employer retains the right to use the option of progressing to Part B works.
- Variant bids
- not allowed
Lot #2Skye 132kV Reinforcement
- Variant bids
- not allowed
Lot #3Skye 132kV Reinforcement
- Variant bids
- not allowed
Lot #4Skye 132kV Reinforcement
- Variant bids
- not allowed
Lot #5Skye 132kV Reinforcement
- Variant bids
- not allowed
Lot #6Skye 132kV Reinforcement
- Variant bids
- not allowed
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published — the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Technical — 30
- Price — 70
- price — 70
Published award criteria (3)
- Price — 70
- Technical — 30
- price — 70
Procedure terms & legal framework
From the official record- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 22 Jul 2024, 16:35 BST
- Last source update
- 22 Jul 2024, 16:35 BST
- Award evaluation window
- 29 Apr 2022, 12:00 BST — …
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0323f0
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
How it was run
- Appointment period ends
- 25 Mar 2022, 12:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 360 days from the deadline
- Bids opened
- 29 Apr 2022, 12:00 BST
Timeline
3 published dates · Europe/London- Admission / appointment period endsperiod end, not a bid countdown25 Mar 2022, 12:00 GMT
- Bids opened29 Apr 2022, 12:00 BST
- Notice published22 Jul 2024, 16:35 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics — not a forecast4 suppliers are admitted to this framework without individual award values or dates — see the supplier list below.
Contracts
OO-CONSTRUCTION -132KV OHL REINFORCEMENT WORKS LT000091 SKYE - 1026
- Signed
- 3 Jun 2024
- Value
- —
- Status
- active
OO-CONSTRUCTION -132KV UGC REINFORCEMENT WORKS LT000091 SKYE - 1026
- Signed
- 3 Jun 2024
- Value
- —
- Status
- active
OO-CONSTRUCTION -132KV UGC REINFORCEMENT WORKS LT000091 SKYE - 0728
- Signed
- 9 Apr 2024
- Value
- —
- Status
- active
CALL OFF CONTRACT FOR CO Skye Reinforcement Substation Projects 0726
- Signed
- 28 Mar 2024
- Value
- —
- Status
- active
Notice history
10 events · 6 releases on Find a Tender · since 23 Mar 2022- Buyer details updated22 Jul 2024, 16:35 BST
- Buyer details updated22 Jul 2024, 16:27 BST
- Buyer details updated22 Jul 2024, 16:11 BST
- Status changed to complete27 Jun 2024, 15:19 BST
- Procurement method changed27 Jun 2024, 15:19 BST
- Buyer details updated27 Jun 2024, 15:19 BST
- Published value updated23 Mar 2022, 08:28 GMTwas £245,000,000
- Status changed23 Mar 2022, 08:28 GMT
- Procurement method changed23 Mar 2022, 08:28 GMT
- Deadline withdrawn23 Mar 2022, 08:28 GMT
Published amendments (1 · 0 deadline changes)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DateIV2.2 | 25 Mar 2022 | 29 Apr 2022 | +35 d |
Regarding Notice reference: 2022/S 000-007510, for the Skye 132kV Reinforcement works, published to FTS on 18/03/2022 at 11.14pm. Closing date (in section IV.2 Administrative Information) should read 29/04/2022.
Routine re-releases (6)
- 2024-06: 1 release · 27 Jun 2024
- 2022-03: 2 releases · 18 Mar 2022 — 23 Mar 2022
Contracting authority & participating public bodies
3 public bodies on the noticeConsortium members and other public bodies
- SSE plcContracting authorityElectricity
- Scottish Hydroelectric plcContracting authorityElectricity
Framework contractors & participating bidders
4 commercial parties on the notice- BALFOUR BEATTY UTILITY SOLUTIONS LIMITEDFramework contractor
- BALFOUR BEATTY UTILITY SOLUTIONS LIMITED AS AGENT OF BALFOUR BEATTY GROUP LIMITEDFramework contractor
- UK Grid Solutions LimitedFramework contractorReview body
- WOOD TRANSMISSION AND DISTRIBUTION LIMITEDFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.