Find a TenderAwardedContract details notice
Published 30 Apr 2026, 15:38 BST

Official UK procurement notice

The Repair of Operational Infrastructure Equipment

Official notice

Authority: Ministry of Defence (Central government)

Framework agreementServicesCompetitive flexible procedureAbove thresholdDefence & securityReserved for supported employment providersSME suitable
Sectors: Repair & Maintenance (50) Delivery: UK
Framework ceiling (notional)£2,747,000framework ceiling, not attributable revenue
Submissions closed 26 May 2026awarded 24 Aug 2026
Awarded to G3 Systems Limited
Framework period 4 yrsends 6 Jul 2030 · up to 5 Jul 2032 with extensions · starts 7 Jul 2026

What is being bought

Published requirement description

Babcock Land Defence Limited - acting as agent to the UK Ministry of Defence ("the Authority") , has awarded a 4 Year plus 2 x 1 Year Options Framework Agreement for The Repair of Operational Hygiene System (OHS) Laundry Transportable, Personal Sanitation Portable (PSP), Operational Field Catering System (OFCS) Equipment. The repair provision is to include all types of repairs on the equipment:

CPV code applicable to this contract is:50532400 - Repair and maintenance services of electrical distribution equipment

This Framework Agreement includes 8 items identified as being in scope:

3510‐99‐908‐6830 OHS Laundry Transportable

5419‐99‐745‐1624 OHS Personnel Sanitation Portable

4520‐12‐368‐4888 Burner Module

7310‐99‐503‐8900 OFCS Oven

6120‐99‐316‐0134 OFCS Power Supply Unit

6110‐99‐684‐4060 OFCS Slave Start Distribution Box

7310‐99‐934‐8969 OFCS Burner C/W Burner Box

4520‐99‐498‐9618 Field Water Heater

The Authority reserves the right to add items of a similar nature during the lifetime of the contract following Request for Quotations (RFQ).

The contract value: £2,747,000.00.

The resulting Framework Agreement shall contain a set of Key Performance Indicators to measure performance in areas such as delivery and quality and shall include remedies for poor performance.

The Authority shall award the Framework Agreement in accordance with the evaluation criteria which will be detailed in the Invitation to Tender.

QA standards or equivalent: The contractor shall hold and maintain a certification to ISO 9001:2015 or equivalent quality accreditation to a correct scope relevant to this requirement.

No business whatsoever is guaranteed under any resulting Framework Agreement indeed there is no guarantee that any Framework Agreement will be put in place in relation to this notice. No compensation etc. will be paid if a tender or resulting Framework Agreement is withdrawn for any reason. Bidders should take part in this process only on the basis that they fully understand and accept this position.

Contract name: IRM23/7660

RAR-VZ9JRJ2

Cyber Risk Profile: Level 0 (basic)

  • How the procedure runs: The Authority intends to conduct the procurement in 2 stages. Stage 1 is the Procurement Specific Questionnaire, Stage 2 is the issue of the Invitation to Tender The Competitive Flexible Procedures in the Public Procurement Act 23 outline a structured approach to procurement, while allowing for flexibility to adapt to changing requirements. The detailed steps involved in the process: The Procurement Specific Questionnaire (PSQ) Assessment of Suppliers: The PSQ is assessed based on the selection criteria within the PSQ itself. Each question in the questionnaire is evaluated to determine if the supplier meets the required conditions of participation. Down Selection Process: The intention is to down select suppliers on a pass/fail basis. Only those suppliers who meet the necessary criteria will move forward to the next stage. Invitation to Tender (ITT) Shortlisted Suppliers: Once the PSQ stage is completed, the shortlisted suppliers who meet the criteria are invited to submit their full tender. Tender Documents: The full procurement documents, including requirements, specifications, and terms, are provided to the suppliers. Clarifications: Suppliers can ask questions or seek clarifications to ensure they fully understand the requirements and any flexibility involved in the process. Evaluation and Award Criteria A Framework Agreement will be awarded to the bidder who submits the most advantageous tender. Evaluation will consider: Pricing and supply details for the items as specified in the tender. Responses to the Technical Questions: Compliance to OEM Specification Initial Set up Times Turnaround Times Schedule Adherence

CPV: Repair and maintenance services of electrical distribution equipment

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs are awarded directly to appointed suppliers, without further competition
Bids received
2 bids received · 1 suppliers appointed
Framework period
4 yrs · up to 6 yrs from 7 Jul 2026
Supplier levy on call-offs (max %)
1% of call-off value
Published description of the framework

Offer pricing shall be Firm for the first year of the contact, with subseqent annual price adjustment effective from each contract anniversary, aligned to : 1 Year Firm price, fixed against PPI INDEX for Years 2-4

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 4 yrsPublished value£2,747,000
Contract period: 7 Jul 2026 – 6 Jul 2030 (4 yrs) · up to 5 Jul 2032 with extensionsValue: £2,747,000 exc. VAT · £3,296,400 inc. VAT
Delivery: South East
Extensions: 4 Year plus 2 x 1 Year Options · 4 Year plus 2 x 1 Year Options

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 45%Price: 55%
Published sub-criteria (2)
  • Technical: 45%
  • Comercial: 55%
Published award criteria (2)
  • Comercial
  • Technical
What this means for your bid
  • Price carries 55 of 100 points: a 10% discount moves about 5.5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “The Repair of Operational Infrastructure Equipment” is a framework: the contest is a place on its panel, not a single contract, and call-offs are awarded directly: getting appointed is the whole game.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Defence & security
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
30 Apr 2026, 15:38 BST
Last source update
8 Oct 2026, 09:16 BST
Award evaluation window
Submission end – 29 Jun 2026
Authority reference
IRM23/7660
FTS notice number
2026/S 000-040060
Latest notice
Contract details notice (UK7)
Classification (CPV)
Repair and maintenance services of electrical distribution equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-068f8e Find a Tender
How it runs

The Authority intends to conduct the procurement in 2 stages. Stage 1 is the Procurement Specific Questionnaire, Stage 2 is the issue of the Invitation to Tender

The Competitive Flexible Procedures in the Public Procurement Act 23 outline a structured approach to procurement, while allowing for flexibility to adapt to changing requirements. The detailed steps involved in the process:

The Procurement Specific Questionnaire (PSQ)

Assessment of Suppliers: The PSQ is assessed based on the selection criteria within the PSQ itself. Each question in the questionnaire is evaluated to determine if the supplier meets the required conditions of participation.

Down Selection Process: The intention is to down select suppliers on a pass/fail basis. Only those suppliers who meet the necessary criteria will move forward to the next stage.

Invitation to Tender (ITT)

Shortlisted Suppliers: Once the PSQ stage is completed, the shortlisted suppliers who meet the criteria are invited to submit their full tender.

Tender Documents: The full procurement documents, including requirements, specifications, and terms, are provided to the suppliers.

Clarifications: Suppliers can ask questions or seek clarifications to ensure they fully understand the requirements and any flexibility involved in the process.

Evaluation and Award Criteria

A Framework Agreement will be awarded to the bidder who submits the most advantageous tender. Evaluation will consider: Pricing and supply details for the items as specified in the tender. Responses to the Technical Questions:

Compliance to OEM Specification

Initial Set up Times

Turnaround Times

Schedule Adherence

How it was run

Official notice
Run through: Defence Sourcing Portal · Who buys & how to bid on MOD DSP
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · registration requires an NCAGE code — obtain in advance · before you can bid: NCAGE
Requests to participate (first stage)
26 May 2026, 16:00 BST
Appointment period ends
26 May 2026, 16:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · 1% of call-off value
Detailed submission instructions & authority contactsFrom official release

contracts.mod.uk ↗

Tender must be submitted electronically via the Defence Sourcing Portal (DSP) by date and time. The Authority reserves the right to reject any Tender received after the stated date and time.

Hard copy, paper or delivered digital Tenders (e.g. email, DVD) at OFFICIAL SENSITIVE classification are no longer required and will not be accepted by the Authority.

Tenderers are required to submit an electronic online Tender in response to ITT IRM23/7660

Timeline

30 Apr 2026 → 8 Oct 2026 · 6 dates
  1. Tender notice published174 days ago
    30 Apr 2026, 15:38 BST
  2. Admission / appointment period ends148 days ago · period end, not a bid countdown
    26 May 2026, 16:00 BST
  3. Award decision expected by114 days ago
    29 Jun 2026, 23:59 BST
  4. Contract starts107 days ago
    7 Jul 2026, 00:00 BST
  5. Assessment summaries sent41 days ago
    11 Sept 2026, 00:00 BST
  6. Latest notice published13 days ago
    8 Oct 2026, 09:16 BST

Notice history

5 events · 3 releases on Find a Tender · since 30 Apr 2026
  1. Tender notice published
    30 Apr 2026, 15:38 BST
    UK4
  2. Contract award notice published
    11 Sept 2026, 08:50 BST
    UK6
  3. Status changed to complete
    11 Sept 2026, 08:50 BST
  4. Contract signature expected
    24 Sept 2026, 23:59 BST
    scheduled
  5. Contract details notice published
    8 Oct 2026, 09:16 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 11 award · see the list ↓
Bids received 22 from SMEs
Contracts signed 1latest 5 Oct 2026
Awarded toValueDateStatus
G3 Systems Limited24 Sept 2026 – 23 Sept 2030Options: 4 Years plus 2 x 1 Years Options£2,747,00024 Aug 2026Awarded

Contracts

  • Contract 1 · G3 Systems Limited

    Signed
    5 Oct 2026
    Value
    £2,747,000
    Period
    5 Oct 2026 – 4 Oct 2030
    Status
    active
    Options
    2 x 1 Year Options Framework Agreemen

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders20—

Contracting authority & participating public bodies

Ministry of Defence

Contracting authorityPublic authority - central government GB-PPON: PHVX-4316-ZVGZ Building B15, Donnington, Telford, West Midlands, TF2 8JTContact email

Framework contractors & participating bidders

1 commercial party on the notice
  • G3 Systems LtdFramework contractorGB-PPON: PCDC-3686-QJVH Osprey Quay, Portland, South West, DT5 1PYContact email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender