Find a TenderClosedTender notice
Published 16 Jan 2026, 11:49 GMT

Official UK procurement notice

Tamar Bridge Toll Collection Service

Official notice

Authority: Cornwall Council (Local council)·Consortium: 2 public authorities

ServicesOpen procedureAbove thresholdSME suitable
Published estimate£8,350,221≈ £2.8m / year · £10,380,265 inc. VAT · 1 value update
Submissions closed 26 Aug 2026
Next notice expected 17 Jun 2026
Contract term 3 yrsends 31 Mar 2030 · up to 31 Mar 2035 with extensions · starts 1 Apr 2027

What is being bought

Published requirement description

Tamar Crossings and Cornwall Council, on behalf of the parent authorities of Cornwall Council and Plymouth City Council, invites tender submissions from suitable suppliers to provide a replacement contract for toll collection services at Tamar Bridge, as the current contract is reaching the end of its full term.

Tolls collected at the Tamar Bridge represent the major source of income for the Tamar Bridge and a physical presence is still required in each of the five mixed mode toll lanes and to support our two automated lanes. Tolls are collected in one direction only following crossing, from a plaza located on the eastern (Plymouth) side of the river.

A secondary element of office and rest facility cleaning has allowed contractors to productively engage reserve support staff in this activity. The routine presence of contractor’s supervisors and the pool of capable staff ensures cleaning is completed to appropriate levels of quality and there is robust continuity for both toll collection and cleaning provided by the appointed contractor.

This high-profile 24/7/365 service has been contracted out since 1986, with the current contract expiring on 31 March 2027 a new arrangement is required with an initial contract term of three years, with optional extensions of up to five years in total, in any combination, giving a maximum possible duration of eight years.

The structure and flexibility of the extension options are necessary due to ongoing investigations into the potential implementation of an Open Road Tolling (ORT) system. Introduction of ORT would directly affect future service requirements, and the potential for change requires that the Authority retain discretion over if, and for how long, the extension options are exercised.

For the avoidance of doubt, suppliers should be aware that Tamar Bridge have a maximum available budget of £944,671 for the initial year of this opportunity and that no contingency beyond this sum exists.

An inflation mechanism exists within the contact, allowing adjustment to apply annually from the first anniversary of the starting date to take account of cost inflation with the percentage change to the National Living Wage applied to 50% of the contract price and the percentage change over 12 months to the Consumer Price Index (CPI) applied to 50% of the contract price. Any such adjustment will be facilitated by discussion and agreement with the contract manager. Please refer to the Invitation to Tender and Contract document for further information.

It should be noted that the estimated total value of the requirement over the maximum available term of eight (8) years as advertised in this notice is a value of £8,350,221. This figure is without VAT and includes an allowance of 4% per annum compound indexation of the contract price and should be taken as best estimate only.

The Authority anticipates that the Transfer of Undertakings (Protection of Employment) Regulations 2006 (TUPE) may apply to this contract.

It should also be noted the Authorities reserve the right on giving written notice to the Supplier from time to time to require changes to the Services (including by way of the removal of Services, the addition of new Services, or increasing or decreasing the Services or specifying the order in which the Services are to be performed or the locations where the Services are to be provided) for any reason whatsoever.

In the event of a Variation the Contract Price may also be varied. Such variation in the Contract Price shall be calculated by the Supplier and agreed in writing with the Authorities and shall be such amount as properly and fairly reflects the nature and extent of the Variation in all the circumstances.

CPV: Bridge toll services · Toll-collection services

The lotProcurement structure

single lot · value published
Lot #1Renewal 3 yrsSMEPublished value£8,350,221
Contract period: 1 Apr 2027 – 31 Mar 2030 (3 yrs) · up to 31 Mar 2035 with extensionsValue: £8,350,221 exc. VAT · £10,380,265 inc. VAT
Delivery: South WestEligibility: SME eligible
Extensions: Due to ongoing investigations into the potential implementation of an Open Road Tolling (ORT) system. Introduction of ORT would directly affect future service requirements, and the potential for change requires that the Authority retain discretion over if, and for how long, the extension options are exercised. Therefore the procurement includes five one year optional extensions providing a maximum extension of up to five years in total. For clarity these may be taken cumulatively or flexibly as required, meaning multiple extension periods might be taken up simultaneously and in any combination, giving a maximum possible duration of eight years including the initial term. The Authority gives no guarantee that the Contract will be extended in line with the available options.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Suppliers must demonstrate sufficient economic and financial standing to perform the contract.

    This will be assessed through financial information, including turnover, liquidity, gearing and profitability, based on the supplier’s last two years’ accounts, no more than 18 months old.

    Suppliers must pass at least three of the four financial tests and achieve a minimum score of 70 in order to meet the conditions of participation. Full details are set out in the procurement documents.

    Suppliers may rely on other entities (e.g. group companies or guarantors) to meet these requirements, subject to provision of appropriate evidence and guarantees.

    Confirmation of, or commitment to obtain, the following minimum insurance levels:

    Employer’s Liability: £10,000,000

    Public Liability: £10,000,000

    Full details are set out in the procurement documents.

  • Technical & professional ability

    Suppliers must demonstrate sufficient technical and professional ability by providing up to three contract examples from the last three years evidencing delivery of similar services, including at least one example or a clear explanation where this is not possible, together with verifiable customer references.

    Suppliers must also be able to evidence one of the following:

    • You have within the last twelve months successfully completed a prequalification application undertaken by an assessment provider able to demonstrate that its information gathering process conforms to CAS (Common Assessment Standard).
    • You have within the last twelve months, successfully met the assessment requirements of a scheme in registered membership of the Safety Schemes in Procurement (SSIP) forum.
    • You hold a UKAS or equivalent, accredited independent third-party certificate of compliance, such as ISO 45001.

    Where subcontracting is proposed, suppliers must also demonstrate effective supply chain management, including performance monitoring and prompt payment practices.

    These requirements will be assessed on a pass/fail basis as conditions of participation.

    Full details of all requirements are set out in the procurement documents.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
  • PQP: Supplier's responses to quality and social value criteria will be scored and weighted to generate a total weighted quality score. The tender price will then be divided by the total weighted quality score to calculate a Price per Quality Point score. Tenders will be ranked based on this calculation, with the contract awarded to the supplier achieving the lowest Price per Quality Point score, representing the Most Advantageous Tender. Please refer to the Invitation to Tender for full details of assessment criteria.
Conditions of participation2
  • Economic & financial standing

    Suppliers must demonstrate sufficient economic and financial standing to perform the contract.

    This will be assessed through financial information, including turnover, liquidity, gearing and profitability, based on the supplier’s last two years’ accounts, no more than 18 months old.

    Suppliers must pass at least three of the four financial tests and achieve a minimum score of 70 in order to meet the conditions of participation. Full details are set out in the procurement documents.

    Suppliers may rely on other entities (e.g. group companies or guarantors) to meet these requirements, subject to provision of appropriate evidence and guarantees.

    Confirmation of, or commitment to obtain, the following minimum insurance levels:

    Employer’s Liability: £10,000,000

    Public Liability: £10,000,000

    Full details are set out in the procurement documents.

  • Technical & professional ability

    Suppliers must demonstrate sufficient technical and professional ability by providing up to three contract examples from the last three years evidencing delivery of similar services, including at least one example or a clear explanation where this is not possible, together with verifiable customer references.

    Suppliers must also be able to evidence one of the following:

    • You have within the last twelve months successfully completed a prequalification application undertaken by an assessment provider able to demonstrate that its information gathering process conforms to CAS (Common Assessment Standard).
    • You have within the last twelve months, successfully met the assessment requirements of a scheme in registered membership of the Safety Schemes in Procurement (SSIP) forum.
    • You hold a UKAS or equivalent, accredited independent third-party certificate of compliance, such as ISO 45001.

    Where subcontracting is proposed, suppliers must also demonstrate effective supply chain management, including performance monitoring and prompt payment practices.

    These requirements will be assessed on a pass/fail basis as conditions of participation.

    Full details of all requirements are set out in the procurement documents.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Unspecified in notice
First published
16 Jan 2026, 11:49 GMT
Last source update
15 Jul 2026, 16:31 BST
Award evaluation window
Submission end – 7 Dec 2026
Authority reference
DN803005
FTS notice number
2026/S 000-066943
Latest notice
Tender notice (UK4)
Classification (CPV)
Bridge toll servicesToll-collection services
Delivery area
South West (UKK41)
Official registry OCID
ocds-h6vhtk-060785 Find a Tender
Contract terms summary

Contract terms and risks:

The contract will be a services contract for toll collection services with a secondary cleaning element and will have an initial term of three years and options to extend for up to five further one-year periods, either cumulatively or flexibly as required.

The contract incorporates the successful supplier’s tender submission and is based on a fixed annual price model subject to indexation.

Key risks are allocated to the supplier, including workforce provision (with TUPE applying), delivery of service schedules, performance against KPIs and service levels, and service continuity during mobilisation. Contractual remedies, including service credits, will apply where performance requirements are not met. The contract also includes flexibility to accommodate future changes to the tolling model, including potential early termination.

For detailed information please refer to the tender documents including the invitation to tender, the draft contract and specification.

Payment terms:

Payment will be made monthly in arrears within 30 days of receipt of a valid invoice.

For detailed information please refer to the draft contract within the tender document

Review and risk notes
Risks

The principal risks to contract performance relate to workforce availability and retention in a labour‑intensive 24/7 operational environment (with TUPE applying, including risks associated with the transfer of the existing workforce), failure to meet required service schedules, and maintaining consistent performance against defined service levels and KPIs, recognising that service failure may directly impact toll revenue collection.

Additional risks include demand variability requiring operational flexibility, cost pressures over the contract term, incident and operational management on site, and ensuring service continuity during mobilisation and ongoing delivery.

There is also a strategic risk associated with potential future changes to the tolling model, which may impact service delivery requirements during the contract term.

These risks are managed through contractual performance mechanisms, including KPIs, service levels and associated remedies, together with requirements for robust workforce planning, mobilisation, incident management and operational management by the supplier. Low Service Credit obligations are associated with some of the KPIs.

Please review tender documents for further information.

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Submission deadline
26 Aug 2026, 12:00 BST
Clarification deadline
19 Aug 2026, 12:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

This opportunity can be found on www.supplyingthesouthwest.org.uk ↗

  • Search Latest Opportunities
  • Search for Project reference DN803005 (Tamar Bridge Toll Collection Services 2027)

Direct Link:

procontract.due-north.com/Advert ↗

Timeline

16 Jan 2026 → 1 Apr 2027 · 8 dates
  1. Planning notice published284 days ago
    16 Jan 2026, 11:49 GMT
  2. Market engagement249 days ago
    20 Feb 2026, 23:59 GMT

    Tamar Crossings is conducting a soft market assessment to gain an understanding of the potential level of interest across all sectors in provision of toll collection services (TCS) at the Tamar Bridge. The Crossings does so on behalf of the owning Authorities, Cornwall Council and Plymouth City Council. The TCS is for the provision of staff to process vehicles and payments to meet a 24/7/365 operating schedule at toll booths located at the eastern (Plymouth) extremity of the Tamar suspension bridge.

    Whilst this service is well established and has been provided by third parties over several decades, it is intended that the responses supplied will enable the Crossings to further develop and refine a business proposal. The proposal would be subject to the development and approval of a refreshed business case, and, as such, this exercise implies no commercial commitment.

    This is not a formal tender document and participation of this soft market assessment will not prejudice suppliers participating in any future procurement.

    Please visit our procurement portal (Proactis.com) www.supplyingthesouthwest.org.uk ↗ – Project No. DN803005, Tamar Bridge Toll Collection Service, here after expressing an interest you will be able to access and download the Soft Market Test documents.

    Please then return your completed Soft Market Test document by close of Friday 20th February 2026, via the procurement portal (Proactis.com) www.supplyingthesouthwest.org.uk ↗ – Project No. DN803005, Tamar Bridge Toll Collection Service.

  3. Next notice expected132 days ago
    17 Jun 2026, 23:59 BST
  4. Tender notice published104 days ago
    15 Jul 2026, 16:31 BST
  5. Clarification questions by69 days ago
    19 Aug 2026, 12:00 BST
  6. Submission deadline62 days ago
    26 Aug 2026, 12:00 BST
  7. Today
    28 Oct 2026
  8. Award decision expected byin 40 days
    7 Dec 2026, 23:59 GMT
  9. Contract startsin 154 days
    1 Apr 2027, 00:00 BST

Notice history

6 events · 3 releases on Find a Tender · since 16 Jan 2026
  1. Pipeline notice published
    16 Jan 2026, 11:49 GMT
    UK1
  2. Preliminary market engagement notice published
    23 Jan 2026, 10:55 GMT
    UK2
  3. Tender notice published
    15 Jul 2026, 16:31 BST
    UK4
  4. Published value updated to £8,350,221
    15 Jul 2026, 16:31 BST
    was £7,050,080
  5. Status changed to active
    15 Jul 2026, 16:31 BST
  6. Deadline published: 26 Aug 2026, 12:00 BST
    15 Jul 2026, 16:31 BST

Contracting authority & participating public bodies

2 public bodies on the notice

Cornwall Council

Contracting authorityPublic authority - sub-central government GB-PPON: PYRH-9827-DWLP County Hall, Truro, South West, TR1 3AYContact name, email

Consortium members and other public bodies

  • Plymouth City CouncilContracting authorityPublic authority - sub-central governmentGB-PPON: PBQP-8499-TLMP Plymouth, South WestContact name, email

Official documents & specifications (5)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specifications tenderBidding documents and specificationsTender documents are available from the 'Supplying the South West Portal': https://www.supplyingthesouthwest.org.uk/ DN803005 Tamar Bridge Toll Collection Services 2027.
  • Technical specifications tenderTechnical specificationsTender documents are available from the 'Supplying the South West Portal': https://www.supplyingthesouthwest.org.uk/ DN803005 Tamar Bridge Toll Collection Services 2027.

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Preliminary market engagement notice planningPreliminary market engagement noticeUK2Preliminary market engagement notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender