Official UK procurement notice
Supply of Smart Water Meters; Goods & Services
Authority: THAMES WATER UTILITIES LIMITED
What is being bought2 lots · detail below
Published requirement descriptionThe supply of Smart Water Meters (SWM) including Local Communication Equipment (LCE) and Head End Systems (HES) to support collection of measurement data and meter events over LPWA networks employing NB-IoT (Narrow Band Internet of Things) for eventual submission to Thames Water applications.
The estimated gross value of this contract is £181.8 million broken down by each lot :
Lot Gross Value over 8 Year Term (ex-Vat)
Lot 1 (a) £133,346,309
Lot 1 (b) £48,499,826
- Recurrence: 3-8 years
CPV: Data management services · Meter reading service · Meters · Water meters
How this framework works
From the published notice- Places
- up to 2 suppliers · 2 appointed (full)
Lots and requirements (2)Procurement structure
2 lots · all with a published value · win at most 2 of themLot #1Supply of Concentric Smart Meters, NB-Iot Radio Modules (LCE) and associated Head End SystemAwardedRenewalPublished value£133,000,000
The supply of Concentric Smart Water Meters (SWM) including Local Communication Equipment (LCE) and Head End System (HES) to support collection of meter data information (AMR/AMI) into Thames Waters Meter Data Management System (MDMS) enabling on going operational management of meters and LCE deployed over a NB-IoT LPWA network.
It is estimated that during the initial term up to 177,500 concentric meters of various sizes with an associated LCE (NB-IoT) and Head End service may be purchased at an estimated contract value of £18.5million over the initial three-year term and over the maximum term of the framework this could exceed £133.3 million. Additional information: The business objective of this agreement during the initial term is defined by Green Economic Recovery (GER) funding made available to the Purchaser by Ofwat whose scope is for supply of 204,700 meters that are capable of connecting via Vodafone UK NB-IoT Network. All meters have to be installed and operational by March 2025. Additional meters may be funded through other Purchaser programs and asset management plans (AMP)
Lot #2Supply of In-Line Meters, NB-Iot Radio Modules (LCE) and associated Head End SystemAwardedRenewalPublished value£48,500,000
The supply of In-Line Smart Water Meters (SWM) including Local Communication Equipment (LCE) and Head End System (HES) to support collection of meter data information (AMR/AMI) into Thames Waters Meter Data Management System (MDMS) enabling on going operational management of meters and LCE deployed over a LPWA network employing NB-IoT.
It is estimated that during the initial term up to 26,500 in-line meters of various sizes with an associated LCE (NB-IoT) Head End service may be purchased at an estimated contract value of £6.7million over the initial contract term and over the maximum term of the framework this could exceed £48.5 million. Additional information: The business objective of this agreement during the initial term is defined by Green Economic Recovery (GER) funding made available to the Purchaser by Ofwat whose scope is for supply of 204,700 meters that are capable of connecting via Vodafone UK NB-IoT Network. All meters have to be installed and operational by March 2025. Additional meters may be funded through other Purchaser programs and Asset Management Plans (AMP).
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
As detailed in the PQQ
- Legal form for consortia
- Consortia may be required to form a legal entity prior to award
- Shortlisting
- As detailed in section VI.3 and the PQQ
- Successive reduction
- Candidates will be reduced successively across stages
- “Supply of Smart Water Meters; Goods & Services” is a framework: the contest is a place on its panel, up to 2 suppliers, not a single contract.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Negotiated procedure with prior call for competition
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Goods
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Yes · 3-8 years
- First published
- 7 Jul 2023, 10:43 BST
- Last source update
- 4 Nov 2024, 11:53 GMT
- Authority reference
FA1763- FTS notice number
2024/S 000-035625- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03dfb1Find a Tender- Contract terms summary
Specified in Invitation to Negotiate Document
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As detailed in the ITN
- Review procedure
Thames Water Utilities Ltd will incorporate a standstill period at the point information on the award of the contract is communicated to tenderers. That notification will provide full information on the award decision. The standstill period, which will be for a minimum of 10 calendar days, provides time for unsuccessful tenderers to challenge the award decision before the contract is entered into.
The Utilities Contracts Regulations 2016 provide for aggrieved parties who have been harmed or are at risk of harm by a breach of the rules to take action in the High Court (England, Wales and Northern Ireland).
Publisher note: **** Please note - this is a Contract Award Notice ****
How it was run
Official notice- Appointment period ends
- 28 Jul 2023, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Supplier levy on call-offs (max %)
- document
- Bid validity
- 270 days from the deadline
- Deposits and guarantees
- Bonds and/or parent company guarantees of performance and financial standing may be required
Timeline
28 Jul 2023 → 4 Nov 2024 · 2 dates- Admission / appointment period endsperiod end, not a bid countdown28 Jul 2023, 12:00 BST
- Notice published4 Nov 2024, 11:53 GMT
Notice history
1 event · 2 releases on Find a Tender- Status changed to complete4 Nov 2024, 11:53 GMT
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast2 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Supply of In-Line Meters, NB-Iot Radio Modules (LCE) and associated Head End System
- Signed
- 17 Sept 2024
- Value
- —
- Status
- active
Supply of Concentric Smart Meters, NB-Iot Radio Modules (LCE) and associated Head End System
- Signed
- 24 Aug 2024
- Value
- —
- Status
- active
Contracting authority & participating public bodies
Framework contractors & participating bidders
2 commercial parties on the notice- Elster Water Meter LtdFramework contractor
- Sensus UK LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria