Find a TenderAwardedContract details notice
Published 7 Oct 2025, 15:28 BST

Official UK procurement notice

Supply Chain Partners (Trades) Framework

Official notice

Authority: Wandle Housing Association Limited (Charity / VCSE)·On behalf of: LUMENSOL LTD

Open framework scheme3 lotsWorksOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£57,600,000envelope for 3 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 17 Dec 2025awarded 25 Mar 2026
Awarded to ALL SERVICE 4 U LIMITED +11 more3 awards
Framework period 1 yrends 31 Jul 2027 · up to 31 Jul 2034 with extensions · starts 1 Aug 2026

What is being bought3 lots · detail below

Published requirement description

Wandle Housing Association is responsible for the repair and maintenance of the building(s) and services in accordance with Schedule 6 paragraph 14 of the Housing Act 1985, and in accordance with the landlord's covenants of leases. Wandle Housing Association will establish an Open Framework for the provision of trades.

The Framework will be spilt into three (3) Lots

Lot 1 - Responsive Repairs

Lot 2 - Major Works (Voids and Disrepairs)

Lot 3 - Damp and/or Mould (Works and Surveys)

The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework

Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission.

Wandle is expanding its delivery model for responsive repairs, major works and damp and mould survey and remediation works. Upon commencement of this Framework, Wandle intends to award relevant works and services contracts under this Framework via its new job management system, Total Mobile. Suppliers (whether currently engaged with Wandle or not) are encouraged to submit a Framework submission, in line with the requirements of the specification per Lot.

  • The authority expects to re-tender this requirement around 1 Nov 2026, 23:59 GMT.

CPV: Architectural, construction, engineering and inspection services · Construction work · Installation services (except software) · Repair and maintenance services · Sewage, refuse, cleaning and environmental services

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Bids received
52 bids on the busiest of 3 lots · 41 suppliers appointed
Framework period
1 yr · up to 8 yrs from 1 Aug 2026
Scheme runs until
31 Jul 2034
Supplier levy on call-offs (max %)

This Framework is for the Contracting Authority only, and there will be no fees or rebate levy structure applied to the management of the Framework or any call-off contract.

Published description of the framework

Call-Off Process under this Framework

All call-offs from the Framework will be subject to the criteria published and the processes explained in Schedule 1.

Contracts will be awarded according to the criteria published at the time of the call-off. Full guidance on each call-off will be issued as part of the tender "pack", including details on clarifications, deadlines, award criteria and tendering requirements.

When bidding for a call-off, Suppliers may be asked to confirm if their circumstances have changed since the completion of the Framework Submission and clarify what these changes are. Suitability will be re-evaluated depending on any changes identified.

Call-offs may be conducted in several ways to achieve the best possible outcome for the Contracting Authority. This may include using Expressions of Interest as a call for competition:

Expressions of Interest may be used, where Suppliers will be invited to review the opportunity and then either opt in or opt out of the call-off.

Where an Expression of Interest is used, the Contracting Authority reserves the right to then only invite those that "opt in" to respond to the call-off.

Individual call-off contracts let under the Framework may exceed the lifespan of the Framework, however all call-off contracts must be awarded (contract signed) before the Framework end date. In this instance, the terms and conditions agreed under this Framework will apply to the completion of the works and services.

A call-off contract under this Framework shall be made either by Direct Selection (award without competition), or by way of a Competitive Selection Process (further competition). For the avoidance of doubt, the decision as to whether to select a Framework Contractor by Direct Selection or by way of a Competitive Selection Process shall be entirely at the Contracting Authority's discretion.

Where a call-off procedure results in no award, the Contracting Authority reserves the right to award a contract outside of this Framework.

Direct Selection of a Framework Contractor

The Contracting Authority may award a call-off contract directly to a Framework Contractor, without any further competition between the Framework Contractors, ("Direct Selection") in any of the following circumstances:

where the Contracting Authority can determine which Framework Contractor will provide it with the most advantageous offer for the proposed call-off contract by reference to the Framework Contractors' Framework Submission and having regard to the requirements of the call-off contract in question;

where the Contracting Authority has determined (acting reasonably) that the call-off contract can only be carried out by a particular Framework Contractor for technical reasons (which may include where the Framework Contractor has a unique insight and understanding of the project to which the call-off contract relates and/or the project's key stakeholders);

where the Contracting Authority has invited expressions of interest from Framework Contractors in relation to an intended Competitive Selection Process for a call-off contract, and only one Framework Contractor has responded to express their interest within the requisite timescale set by the Contracting Authority;

where the Framework Contractor is the number one (1) ranked Framework Contractor on the Framework Lot in question. If such Framework Contractor either declines the award of the call-off contract, is excluded from participating in the Award Process or is suspended from the Award Process (pursuant to the Framework terms), the Contracting Authority may award the call-off contract by Direct Selection to the Framework Contractor who is the number two (2) ranked Framework Contractor on the Framework Lot in question, and so on and so forth;

where the call-off contract is for works or services which are a continuation of (or are a subsequent phase of) works or services which the Framework Contractor was previously appointed to carry out, and the Contracting Authority requires continuity of service in respect of the same;

where the Contracting Authority intended to award the call-off contract by way of a Competitive Selection Process, but has determined that only one Framework Contractor satisfies the Conditions of Participation in respect of the call-off contract;

where for reasons of urgency it is not reasonably practicable to award the call-off contract by way of a Competitive Selection Process;

where the estimated value of the Works and Services to be carried out under the call-off contract is less than the amount below which direct awards are permitted by the Contracting Authority's standing orders from time to time;

where for reasons of confidentiality or commercial sensitivity it is not reasonably practicable to award the call-off contract by way of a Competitive Selection Process;

where the Contracting Authority is bound to work with a particular Framework Contractor by reason of any funding condition, or other contractual requirement imposed by another party.

Competitive Selection Process

The Contracting Authority may require Framework Contractors to satisfy certain Conditions of Participation as a pre-condition to being invited to participate, or progressing as part of, a Competitive Selection Process for a Call-off contract.

If the Contracting Authority wishes to award a call-off contract by way of a Competitive Selection Process, the Contracting Authority shall invite all Framework Contractors to take part in the Competitive Selection Process, save for:

any Framework Contractor that is excluded from participating in the Award Process;

any Framework Contractor that is suspended from participating in the Award Process;

any Framework Contractor that does not satisfy the Conditions of Participation in respect of the call-off contract;

any Framework Contractor that has confirmed that they do not wish to be invited to participate, or who has not responded to an expression of interest issued by the Contracting Authority in respect of the Call-off contract.

The invitation to take part in a Competitive Selection Process shall:

be issued in writing via the Portal or such other means as the Contracting Authority may determine;

explain whether the Competitive Selection Process is to comprise of written tender / selection proposals by the Framework Contractors, site visits, interviews or presentations or a combination of any of these things;

where the Competitive Selection Process is to involve the submission of written tender proposals by the Framework Contractors, specify a fixed time limit for submission of such proposals, such time limit being of sufficient duration to allow proposals to be submitted, taking into account factors such as the complexity of the Works and Services in question, the nature of the Contracting Authority's requirements and the time needed to compile and submit proposals;

set out the evaluation criteria on which tenders submitted pursuant to the Competitive Selection Process will be assessed;

contain or make reference to the form of Call-off contract that will be entered into with the successful Framework Contractor.

When invited by the Contracting Authority to participate in a Competitive Selection Process, the Contractor shall provide written confirmation to the party carrying out the tender as to whether or not it wishes to participate.

The cost submitted for the Competitive Selection Process must not exceed any maximum rate stated by the Contracting Authority in pricing methodology as set out in the call-off tender document.

The Contractor shall be responsible for any costs it incurs in participating in a Competitive Selection Process and acknowledges and agrees that the Contracting Authority shall not have any liability for such costs under any circumstances.

The Competitive Selection Process will be assessed on the basis of the evaluation criteria set out in the invitation and all Framework Contractors invited to take part in the Competitive Selection Process will be informed of the outcome of that evaluation.

Lots and requirements (3)Procurement structure

3 lots · all with a published value · same conditions of participation on every lot · same evaluation weights on every lot
Lot #1Responsive RepairsAwardedRenewal 1 yrSMEPublished value£13,600,000

The source published no individual description for this lot.

Contract period: 1 Aug 2026 – 31 Jul 2027 (1 yr) · up to 31 Jul 2034 with extensionsValue: £13,600,000 exc. VAT · £13,600,000 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

  • Technical & professional ability

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

Lot #2Major Works (Voids and Disrepairs)AwardedRenewal 1 yrSMEPublished value£28,800,000

The source published no individual description for this lot.

Contract period: 1 Aug 2026 – 31 Jul 2027 (1 yr) · up to 31 Jul 2034 with extensionsValue: £28,800,000 exc. VAT · £28,800,000 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

  • Technical & professional ability

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

Lot #3Damp and/or Mould Works and SurveysAwardedRenewal 1 yrSMEPublished value£15,200,000

The source published no individual description for this lot.

Contract period: 1 Aug 2026 – 31 Jul 2027 (1 yr) · up to 31 Jul 2034 with extensionsValue: £15,200,000 exc. VAT · £15,200,000 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

  • Technical & professional ability

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 3 lots
Quality: 60%Price: 40%
Published award criteria (2)
  • Quality: As per procurement documents (see Schedule 1 and the ProContract Evaluation Questionnaire).
  • Price: As per procurement documents (see Schedule 1 and the ProContract Evaluation Questionnaire).
Lot distribution rule: Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Wandle is expanding its delivery model for responsive repairs, major works and damp and mould survey and remediation works. Upon commencement of this Framework, Wandle intends to award relevant works and services contracts under this Framework via its new job management system, Total Mobile. Suppliers (whether currently engaged with Wandle or not) are encouraged to submit a Framework submission, in line with the requirements of the specification per Lot.
Conditions of participation · identical on every lot2
  • Economic & financial standing

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

  • Technical & professional ability

    Please refer to full associated tender documents (Schedule 1 and the ProContract Evaluation Questionnaire).

What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “Supply Chain Partners (Trades) Framework” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use the vehicle
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · next expected 1 Nov 2026
First published
7 Oct 2025, 15:28 BST
Last source update
15 Jul 2026, 21:26 BST
Award evaluation window
Submission end – 19 Apr 2026
Authority reference
WHA.COS.R.25.041
FTS notice number
2025/S 000-071351
Latest notice
Contract details notice (UK7)
Classification (CPV)
Architectural, construction, engineering and inspection servicesConstruction workInstallation services (except software)Repair and maintenance servicesSewage, refuse, cleaning and environmental services
Delivery area
London (UKI)
Official registry OCID
ocds-h6vhtk-05a9c1 Find a Tender
Contract terms summary

Please see Schedule 3, Contract (Terms and Conditions)

Review and risk notes
Risks

The following risks have been identified that would impact the performance of the Framework, where the impact cannot be known at this stage but may relate to a modification of the Framework if the risk was to materialise:

  • Risk of legislative changes, regulatory changes or changes in law during the term of the Framework
  • Risk of the impact of Awaab's Law and other legislative changes, regulatory changes or changes in law that cause the value of the Framework to increase during the term of the Framework
  • Risk of unforeseen changes to delivery/operational standards
  • Risk of changes in technology, IT solutions or systems
  • Risk of unforeseen increase in Contracting Authority budgets/increased volume of works/services
  • Risk of unforeseen circumstances that cause the value of the Framework to increase (previous examples include BREXIT, war, pandemic and the cost-of-living crisis)
  • Risk of unforeseen political impact
  • Risk of unforeseen increase in property volume or changes to Boroughs that the Contracting Authority operates in

Any associated risks to call-off contracts that may be awarded will be detailed as part of the call-off procedure.

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Appointment period ends
17 Dec 2025, 12:00 GMT
Clarification deadline
10 Dec 2025, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)

call-off levy · This Framework is for the Contracting Authority only, and there will be no fees or rebate levy structure applied to the management of the Framework or any call-off contract.

Detailed submission instructions & authority contactsFrom official release

A Tender Response must be submitted via ProContract for the Supplier to be considered for the award of the Contract in the Tendering Procedure.

procontract.due-north.com/Opportunities/Index ↗

Tender Responses and communications submitted by Suppliers via any other means will be excluded.

Suppliers that require any technical assistance in using the portal or have any difficulty registering or logging in, should contact the ProContract helpdesk:

0330 005 0352 (9am - 5.30pm Mon - Fri)

[email protected]

"Submit a Ticket" to the helpdesk (via suppliersupport.proactisservicedesk.com/s/ ↗)

Full details around submitting a compliant tender can be found within Schedule 1 of the associated tender documents.

Timeline

7 Oct 2025 → 1 Aug 2026 · 11 dates
  1. Planning notice published374 days ago
    7 Oct 2025, 15:28 BST
  2. Market engagement363 days ago
    17 Oct 2025, 23:59 BST

    On behalf of Wandle Housing Association, SSfH intends to undertake a tender process late 2025 to create a Framework for Supply Chain Partners (Trades).

    This soft market testing process is to help SSfH determine the scope of requirements and inform its approach.

    SSfH is inviting suppliers to respond to the following questions relating to this requirement:

    1. Is your organisation able to provide coverage for all trades?

    a. Electrical (Such as Electrical Appliances, Final Circuits, Internal & External Lighting, Testing & Accessories)

    b. Plumbing, Heating & Water Systems (Such as Hot Water Cylinders, Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework & Plumbing - Client Inspection)

    c. Drainage (Such as Manholes, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV and Testing & Drainage - Client Inspection)

    d. Carpentry & Joinery (Such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Garage Doors and Frames, Windows, Ironmongery, Kitchen Units and Worktops, Miscellaneous Fixtures/Fittings)

    e. Flooring (Such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds & Skirting)

    f. Structural & Exterior Works (such as Chimneys/Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure - Client Inspection)

    g. Groundworks (Such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and Edgings & Gates/Fittings)

    h. Roofing (Such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing)

    i. Painting and Decorating (Such as Internal Decoration, External Decoration, Plasterwork, Rendering and Screeds & Preparation - External and Internal)

    j. Specialist (Such as Timber Treatment, Damp Proofing, Pest Control, Specialist Treatments & Artex Removal)

    k. Cleaning & Environmental Services (Such as Internal & External Cleaning and Clearance, External Garden Clearance and Works, Demolition of Sheds etc., Disinfestation & Environmental Clearance)

    l. Loft Insulation

    1. If not, what trades would your organisation cover (either as listed, or any additional trades not yet detailed)?
    2. Is your organisation able to provide coverage for all current geographical areas?

    a. Croydon

    b. Wandsworth

    c. Lambeth

    d. Merton

    e. Southwark

    f. Lewisham

    g. Sutton

    h. Kingston upon Thames

    i. Bromley

    1. If not, what geographical areas would your organisation be able to cover (as listed)?
    2. What barriers would you perceive, that would prevent your organisation applying to join this Framework?
    3. What information would your organisation need to be able to apply to join this Framework?

    Suppliers are welcome to provide additional comments about this requirement that would encourage them to submit a bid.

    Responses should be submitted by email to [email protected] by 12noon on 17th October 2025. Please state in the email subject line "Supply Chain Partners Soft Market Testing."

    The responses will be treated in confidence and are for information only. They are to help SSfH and Wandle inform its tender approach and to develop the associated tender documents.

    Responses, and lack of responses, will not affect bids received and the evaluation of them when the procurement for this goes live.

    This notice is not an invitation to tender and does not commit SSfH or Wandle Housing Association to a procurement process.

  3. Tender notice published345 days ago
    5 Nov 2025, 15:48 GMT
  4. Next notice expected344 days ago
    5 Nov 2025, 23:59 GMT
  5. Clarification questions by310 days ago
    10 Dec 2025, 17:00 GMT
  6. Admission / appointment period ends303 days ago · period end, not a bid countdown
    17 Dec 2025, 12:00 GMT
  7. Assessment summaries sent205 days ago
    25 Mar 2026
  8. Standstill ends191 days ago
    7 Apr 2026, 23:59 BST
  9. Award decision expected by179 days ago
    19 Apr 2026, 23:59 BST
  10. Latest notice published92 days ago
    15 Jul 2026, 21:26 BST
  11. Contract starts76 days ago
    1 Aug 2026, 00:00 BST

Notice history

12 events · 7 releases on Find a Tender · since 7 Oct 2025
  1. Preliminary market engagement notice published
    7 Oct 2025, 15:28 BST
    UK2
  2. Tender notice published
    5 Nov 2025, 15:48 GMT
    UK4
  3. Status changed to active
    5 Nov 2025, 15:48 GMT
  4. Procurement method changed
    5 Nov 2025, 15:48 GMT
  5. Deadline published: 17 Dec 2025, 12:00 GMT
    5 Nov 2025, 15:48 GMT
  6. Tender notice published
    6 Nov 2025, 10:53 GMT
    UK4
  7. Tender notice published
    6 Nov 2025, 12:38 GMT
    UK4
  8. Contract award notice published
    25 Mar 2026, 15:52 GMT
    UK6
  9. Status changed to complete
    25 Mar 2026, 15:52 GMT
  10. Contract award notice published
    29 Apr 2026, 17:36 BST
    UK6
  11. Contract signature expected
    4 May 2026, 23:59 BST
    scheduled
  12. Contract details notice published
    15 Jul 2026, 21:26 BST
    UK7
Published amendments (2)

Correct link provided: https://procontract.due-north.com/Opportunities/Index?p=18d7f93d-94bb-ef11-8132-005056b64545&v=2 If you are unable to access the portal via this link, please go to https://procontract.due-north.com/Opportunities/Index and search for the opportunity; using the "Portal" filter, selecting "Shared Services for Housing" from the drop down link.

Lot 3 CPV code added for damp and mould surveys: 71000000: Architectural, construction, engineering and inspection services

Routine re-releases (7)
  • 2025-11: 3 releases · 5 Nov 2025, 6 Nov 2025
  • 2025-10: 1 release · 7 Oct 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 413 awards · see the list ↓
Bids received 5247 from SMEs · busiest of 3 lots
Named bidders 64published on the award notice
Contracts signed 3latest 26 Jun 2026
Awarded toValueDateStatus
Lot 1 · Responsive Repairs1 award
ALL SERVICE 4 U LIMITEDSME, ALP GROUP LIMITEDSME, DARETHEALTHCARE UK LIMITEDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK PROPERTY SERVICES LIMITEDSME, LOCKSMITH RESCUE LIMITEDSME +21 moreSupply Chain Partners (Trades) Framework (Lot 1 Responsive Repairs)1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework · Options: Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. The scope of works within Lot 1 includes the following trades : Electrical (Such as Electrical Appliances, Final Circuits, Internal & External Lighting, Testing & Accessories, Nondomestic properties, Street furniture repairs and maintenance ) Plumbing, Heating & Water Systems (Such as Hot Water Cylinders, Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework & Plumbing - Client Inspection, Unvented Cylinders, Tank cleaning/L8 testing) Drainage (Such as Manholes, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV drain surveys and Testing & Drainage - Client Inspection, Draining repairs both excavation and sleeving) Carpentry & Joinery (Such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Garage Doors and Frames, Windows, Ironmongery, Kitchen Units and Worktops, Miscellaneous Fixtures/Fittings, Fire doors with third party accreditation ) Flooring (Such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds & Skirting, Polysafe flooring) Structural & Exterior Works (such as Chimneys/Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure - Client Inspection) Groundworks (Such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and Edgings & Gates/Fittings) Roofing (Such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Recorded Drone surveys) Painting and Decorating (Such as Internal Decoration, External Decoration, Plasterwork, Rendering and Screeds & Preparation - External and Internal) Specialist (Such as Timber Treatment, Damp Proofing, Pest Control, Insulation, Specialist Treatments & Artex Removal, Solar panels, Heat pumps) Cleaning & Environmental Services (Such as Internal & External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc., Disinfestation & Environmental Clearance) Loft Insulations£13,600,000 inc. VAT25 Mar 2026Awarded
Lot 2 · Major Works (Voids and Disrepairs)1 award
ALL SERVICE 4 U LIMITEDSME, ALP GROUP LIMITEDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK PROPERTY SERVICES LIMITEDSME, LOCKSMITH RESCUE LIMITEDSME, RELATIVE GROUNDWORK LIMITEDSME +28 moreSupply Chain Partners (Trades) Framework (Lot 2 Major Works (Voids and Disrepairs))1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework · Options: Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Lot 2 of the Framework is for the delivery of Major Works (Voids and Disrepairs) to Wandle's housing stock. Electrical (Such as Electrical Appliances, Final Circuits, Full or partial rewires, Internal & External Lighting, Testing & Accessories, ventilation systems, socket/switch repairs, consumer units repairs, earthing and bonding, Accessories & Fittings repairs) Plumbing, Heating & Water Systems (Such as Hot Water Cylinders, Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste/overflow Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework, leaks detection and remedials, Bathroom upgrades) Drainage (Such as Manholes, Pipe Relining, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV drain surveys and Testing & Drainage - Client Inspection) Carpentry & Joinery (Such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Security/locksmith, FRA installs and remedials , Garage doors and frames, Windows, Ironmongery, Kitchen Units and Worktops, kitchen upgrades, Miscellaneous Fixtures/Fittings) Flooring (Such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds & Skirting, Polysafe flooring) Structural & Exterior Works (such as Chimneys/Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure - Client Inspection) Groundworks (Such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and Edgings & Gates/Fittings) Roofing (Such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Flashing, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Eco- roofs) Painting and Decorating (Such as Internal Decoration, External Decoration, Tiling, Tanking, Plasterwork, Rendering and Screeds & Preparation - External and Internal) Specialist (Such as Timber Treatment, Damp Proofing, Pest Control, Specialist Treatments, loft and wall insulation, Artex removal) Cleaning & Environmental Services (Such as Internal & External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc, Disinfestation & Environmental Clearance) Gas Servicing (such as CP12, Boiler repairs, Radiator and heating system repairs, Gas appliance repair, Pipework repair)£28,800,000 inc. VAT25 Mar 2026Awarded
Lot 3 · Damp and/or Mould Works and Surveys1 award
ALL SERVICE 4 U LIMITEDSME, BURTON BUILDING CONTRACTS UK LTDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK ELECTRICAL LTDSME, GLITZ 4UT LTDSME, RELATIVE GROUNDWORK LIMITEDSME +21 moreSupply Chain Partners (Trades) Framework (Lot 3 Lot 3 - Damp and/or Mould Works and Surveys)1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034Extensions: The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework · Options: Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Lot 3 of this Framework is for the delivery of Damp and/or Mould works and Surveys to Wandle's housing stock. Awaab's Law is a new legal framework that introduces enforceable time limits for social landlords to investigate and remedy serious hazards in residents' homes. The law follows the tragic death of Awaab Ishak in 2020, which was caused by prolonged exposure to mould. The aim of the legislation is to ensure that residents are protected from unsafe living conditions and ensuring that landlords act quickly when risks to health and safety are identified. Wandle will work with the Contractor to build a triage system to determine the relevant works order priority, which will determine the timescale required for attendance by the Contractor and identify if works are deemed an emergency hazard or significant hazard. The Contractor will be required to undertake the following remediation, and prevention works in relation to Damp and Mould (D&M). This is an indicative list and not exhaustive. Comprehensive Damp and/or Mould survey which includes the following requirements (Awaab's law legal requirement, Initial tenant engagement, Enabling works to allow full survey and investigation, Visual Inspection, Use of Diagnostic Tools (I.e. Moisture meters, Humidity assessments, Hygrometers & infrared cameras), Risk categorisation, Reporting, Remediation Planning) Damp and/or mould works (such as Dehumidifier/drying solutions, Mould make safe, Damp and Mould prevention, Surface treatments, Building fabric repairs, Ventilation/Extraction servicing, repairs and installs) Electrical (such as Electrical Appliances, Final Circuits, Full or partial rewires, Testing and Accessories, Internal & External Lighting, Ventilation Systems, Socket/Switches repairs, Consumer unit repairs, Earthing & bonding, Accessories & Fittings repairs) Plumbing and Bathrooms (such as Heating & Water Systems (Such as Hot Water Cylinders), Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste/Overflow Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework, Leak detection and remedials, Bathroom Upgrades) Drainage (such as Manholes, Pipe Relining, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV and Testing & Drainage - Client Inspection,) Carpentry and Joinery (such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Security/locksmith, FRA Installs and remedials, Garage Doors and Frames, Windows, Ironmongery, Kitchen Units and Worktops, Miscellaneous Fixtures/Fittings, Kitchen Upgrades) Flooring (such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds and Skirting, Polysafe flooring) Structural and Exterior Works (such as Chimneys /Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure, Client Inspection) Groundworks (such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and edgings, Gates/Fittings) Roofing (such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Flashing, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Eco Roofs) Painting and Decorating (such as Internal Decoration, External Decoration, Tiling, Tanking, Plasterwork, Rendering and Screeds, Preparation - External and Internal) Specialist Treatments (such as Timber Treatment, Damp Proofing, Pest Control, Specialist Treatments, Loft and wall Insulation, Artex Removal) Cleaning and Environmental Services (such as Internal and External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc, Disinfestation and Environmental Clearance)£15,200,000 inc. VAT25 Mar 2026Awarded

Contracts

  • Lot 1 - Responsive Repairs · ALL SERVICE 4 U LIMITEDSME, ALP GROUP LIMITEDSME, DARETHEALTHCARE UK LIMITEDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK PROPERTY SERVICES LIMITEDSME, LOCKSMITH RESCUE LIMITEDSME +21 more

    Signed
    26 Jun 2026
    Value
    £13,600,000 inc. VAT
    Period
    1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034 with extensions
    Status
    active
    Extensions
    The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks), taking it to a maximum of 31/07/2034. Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
    Options
    Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. The scope of works within Lot 1 includes the following trades : Electrical (Such as Electrical Appliances, Final Circuits, Internal & External Lighting, Testing & Accessories, Nondomestic properties, Street furniture repairs and maintenance ) Plumbing, Heating & Water Systems (Such as Hot Water Cylinders, Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework & Plumbing - Client Inspection, Unvented Cylinders, Tank cleaning/L8 testing) Drainage (Such as Manholes, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV drain surveys and Testing & Drainage - Client Inspection, Draining repairs both excavation and sleeving) Carpentry & Joinery (Such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Garage Doors and Frames, Windows, Ironmongery, Kitchen Units and Worktops, Miscellaneous Fixtures/Fittings, Fire doors with third party accreditation ) Flooring (Such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds & Skirting, Polysafe flooring) Structural & Exterior Works (such as Chimneys/Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure - Client Inspection) Groundworks (Such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and Edgings & Gates/Fittings) Roofing (Such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Recorded Drone surveys) Painting and Decorating (Such as Internal Decoration, External Decoration, Plasterwork, Rendering and Screeds & Preparation - External and Internal) Specialist (Such as Timber Treatment, Damp Proofing, Pest Control, Insulation, Specialist Treatments & Artex Removal, Solar panels, Heat pumps) Cleaning & Environmental Services (Such as Internal & External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc., Disinfestation & Environmental Clearance) Loft Insulations
    3 agreed KPIs: R1. Completed in Target - Routine Repairs · R2. Appointments Kept · R3. Responsive Recalls
    • R1. Completed in Target - Routine Repairs, P
    • R2. Appointments Kept, P
    • R3. Responsive Recalls, P
  • Lot 2 - Major Works (Voids and Disrepairs) · ALL SERVICE 4 U LIMITEDSME, ALP GROUP LIMITEDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK PROPERTY SERVICES LIMITEDSME, LOCKSMITH RESCUE LIMITEDSME, RELATIVE GROUNDWORK LIMITEDSME +28 more

    Signed
    26 Jun 2026
    Value
    £28,800,000 inc. VAT
    Period
    1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034 with extensions
    Status
    active
    Extensions
    The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
    Options
    The right to additional purchases while the contract is valid. Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Lot 2 of the Framework is for the delivery of Major Works (Voids and Disrepairs) to Wandle's housing stock. Electrical (Such as Electrical Appliances, Final Circuits, Full or partial rewires, Internal & External Lighting, Testing & Accessories, ventilation systems, socket/switch repairs, consumer units repairs, earthing and bonding, Accessories & Fittings repairs) Plumbing, Heating & Water Systems (Such as Hot Water Cylinders, Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste/overflow Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework, leaks detection and remedials, Bathroom upgrades) Drainage (Such as Manholes, Pipe Relining, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV drain surveys and Testing & Drainage - Client Inspection) Carpentry & Joinery (Such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Security/locksmith, FRA installs and remedials , Garage doors and frames, Windows, Ironmongery, Kitchen Units and Worktops, kitchen upgrades, Miscellaneous Fixtures/Fittings) Flooring (Such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds & Skirting, Polysafe flooring) Structural & Exterior Works (such as Chimneys/Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure - Client Inspection) Groundworks (Such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and Edgings & Gates/Fittings) Roofing (Such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Flashing, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Eco- roofs) Painting and Decorating (Such as Internal Decoration, External Decoration, Tiling, Tanking, Plasterwork, Rendering and Screeds & Preparation - External and Internal) Specialist (Such as Timber Treatment, Damp Proofing, Pest Control, Specialist Treatments, loft and wall insulation, Artex removal) Cleaning & Environmental Services (Such as Internal & External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc, Disinfestation & Environmental Clearance) Gas Servicing (such as CP12, Boiler repairs, Radiator and heating system repairs, Gas appliance repair, Pipework repair)
    3 agreed KPIs: MR1. End-to-End time Major Repairs · V1. Completed in Target - both Minor and Major · V2. Voids Post Inspections (Quality) - Satisfactory Handovers
    • MR1. End-to-End time Major Repairs, P
    • V1. Completed in Target - both Minor and Major, P
    • V2. Voids Post Inspections (Quality) - Satisfactory Handovers, P
  • Lot 3 - Damp and/or Mould Works and Surveys · ALL SERVICE 4 U LIMITEDSME, BURTON BUILDING CONTRACTS UK LTDSME, ETEC CONTRACT SERVICES LTDSME, GALMARK ELECTRICAL LTDSME, GLITZ 4UT LTDSME, RELATIVE GROUNDWORK LIMITEDSME +21 more

    Signed
    26 Jun 2026
    Value
    £15,200,000 inc. VAT
    Period
    1 Aug 2026 – 31 Jul 2027 · up to 31 Jul 2034 with extensions
    Status
    active
    Extensions
    The duration of this Framework is for an initial term of one (1) year with options to re-open annually (as per 2.7 of schedule 1 ), up to a maximum eight (8) years term in total (across the scheme of Frameworks). Any decision regarding the re-opening of the Framework, as outlined above, remains entirely at the discretion of the Contracting Authority and will be exercised in accordance with its strategic and operational requirements which may change during the initial set term of the Framework
    Options
    The right to additional purchases while the contract is valid. Suppliers are to note that they will not be required to deliver all trades within a particular Lot; Suppliers will be required to detail the trades they can deliver as part of the Framework Submission. Lot 3 of this Framework is for the delivery of Damp and/or Mould works and Surveys to Wandle's housing stock. Awaab's Law is a new legal framework that introduces enforceable time limits for social landlords to investigate and remedy serious hazards in residents' homes. The law follows the tragic death of Awaab Ishak in 2020, which was caused by prolonged exposure to mould. The aim of the legislation is to ensure that residents are protected from unsafe living conditions and ensuring that landlords act quickly when risks to health and safety are identified. Wandle will work with the Contractor to build a triage system to determine the relevant works order priority, which will determine the timescale required for attendance by the Contractor and identify if works are deemed an emergency hazard or significant hazard. The Contractor will be required to undertake the following remediation, and prevention works in relation to Damp and Mould (D&M). This is an indicative list and not exhaustive. Comprehensive Damp and/or Mould survey which includes the following requirements (Awaab's law legal requirement, Initial tenant engagement, Enabling works to allow full survey and investigation, Visual Inspection, Use of Diagnostic Tools (I.e. Moisture meters, Humidity assessments, Hygrometers & infrared cameras), Risk categorisation, Reporting, Remediation Planning) Damp and/or mould works (such as Dehumidifier/drying solutions, Mould make safe, Damp and Mould prevention, Surface treatments, Building fabric repairs, Ventilation/Extraction servicing, repairs and installs) Electrical (such as Electrical Appliances, Final Circuits, Full or partial rewires, Testing and Accessories, Internal & External Lighting, Ventilation Systems, Socket/Switches repairs, Consumer unit repairs, Earthing & bonding, Accessories & Fittings repairs) Plumbing and Bathrooms (such as Heating & Water Systems (Such as Hot Water Cylinders), Fittings, Equipment and Appliances for Services, Water Storage Tanks, Waste/Overflow Pipework and Fittings, Stopcocks and Valves, Sundry Works, Pipework, Leak detection and remedials, Bathroom Upgrades) Drainage (such as Manholes, Pipe Relining, Foul Drainage Above Ground, Drainage Below Ground, Land Drainage and Soakaways, Rainwater Gutters, Clearing Blockages (Inc Sewage/Spills), CCTV and Testing & Drainage - Client Inspection,) Carpentry and Joinery (such as Reglaze Doors and Windows, External Doors, Internal Timber Doors, Security/locksmith, FRA Installs and remedials, Garage Doors and Frames, Windows, Ironmongery, Kitchen Units and Worktops, Miscellaneous Fixtures/Fittings, Kitchen Upgrades) Flooring (such as Flooring Treatment, Works to Sub-Floors, Floor Tiles, Timber Board, Sheet Flooring, Proprietary Safety Flooring, Floor Renewals, Laminate Flooring, Floor Screeds and Skirting, Polysafe flooring) Structural and Exterior Works (such as Chimneys /Fireplaces, Brick/Block Walling, Foundations in Trenches, Excavation, Concrete Repairs, Meter Cupboards, Airbricks and Vents, Structure, Foundation Sundries, Brickwork and Structure, Client Inspection) Groundworks (such as Fencing, Metal Stairs and Walkways and Balustrades, Paths and Paving, Steps, Stairs and Ramps, Kerbs, Channels and edgings, Gates/Fittings) Roofing (such as Scaffolding, Tower, Platforms Lifts, Inspections- Photographic Surveys, Flashing, Fascia, Soffit and Bargeboards, Rainwater Pipework, Gutters, Remedial Works, Felt Roofing, Sheet Roofing, Leadwork, Asphalt Roofing, Roof Tiling, Slate Roofing, Eco Roofs) Painting and Decorating (such as Internal Decoration, External Decoration, Tiling, Tanking, Plasterwork, Rendering and Screeds, Preparation - External and Internal) Specialist Treatments (such as Timber Treatment, Damp Proofing, Pest Control, Specialist Treatments, Loft and wall Insulation, Artex Removal) Cleaning and Environmental Services (such as Internal and External Cleaning and Clearance, External Garden Clearance and Works, Hazardous waste removal, Demolition of Sheds etc, Disinfestation and Environmental Clearance)
    3 agreed KPIs: DM1. Completed in Target - Damp & Mould Repairs · DM2. End-to-End time Damp & Mould - Routine Repairs · DM3. End-to-End time Damp & Mould - Significant Hazard
    • DM1. Completed in Target - Damp & Mould Repairs, P
    • DM2. End-to-End time Damp & Mould - Routine Repairs, P
    • DM3. End-to-End time Damp & Mould - Significant Hazard, A = sum of the total number of working days taken to complete all D&M Repairs in the period B = count of the total number of D&M Repairs completed in the period

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Responsive Repairs45final-stage tenders · 46 at stage one420—
2 · Major Works (Voids and Disrepairs)52final-stage tenders470—
3 · Damp and/or Mould Works and Surveys49final-stage tenders440—

Who bid (first 60 of 64)

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

3 public bodies on the notice

Wandle Housing Association Limited

Contracting authorityPublic authority - sub-central government GB-CHC: 19225R · GB-PPON: PQDH-2497-GBTX Second Floor, London, London, SE18NWContact email

Other public bodies

  • LUMENSOL LTDProcuring entityLumensol is acting as the technical consultant, operational consultant and evaluator on behalf of the Contracting Authority for this tender opportunity.GB-COH: 11349433GB-PPON: PNQM-5627-XBNJ Newport Pagnell, South EastContact email
  • SHARED SERVICES FOR HOUSING LIMITEDProcess contact pointProcuring entityShared Service for Housing (SSfH) is acting as the managing and contact organisation on behalf of the Contracting Authority for this tender opportunity, carrying out the role as Procurement Consultant.GB-COH: 16356505GB-PPON: PGNT-9288-TPMJ London, LondonContact email

Framework contractors & participating bidders

64 commercial parties on the notice · 31 awarded

The first 50 of 64 commercial parties (by name); the JSON mirror lists them all.

  • ABBINS MAINTENANCE LIMITEDBidder / tendererGB-COH: 07671309GB-PPON: PBCY-3775-MZCJ Riverside Business Centre, Tilbury, East of England, RM18 7ND
  • ALL SERVICE 4 U LIMITEDFramework contractorGB-COH: 07565878GB-PPON: PYRG-3494-TJRG Office 226, Building 3 North London Business Park, London, London, N11 1GNContact email
  • ALP GROUP LIMITEDFramework contractorGB-COH: 10048573GB-PPON: PQQQ-2798-MTJP 65 Broadway, London, London, E15 4BQContact email
  • ARBTRON LTDBidder / tendererGB-COH: 16218285GB-PPON: PJLB-1347-RJTG 653 Queens Road, Sheffield, Yorkshire & Humber, S2 4DX
  • Arvag LtdFramework contractorGB-COH: 8295783GB-PPON: PCRT-3483-CMYG The Old Barn, Off Wood Street, Swanley, South East, BR8 7PAContact email
  • BEST CHOICE CLEANING COMPANY LIMITEDBidder / tendererGB-COH: 11061251GB-PPON: PQQP-2127-BQCH 11 Carlton Terrace, London, London, SE26 4EH
  • BURTON BUILDING CONTRACTS UK LTDFramework contractorGB-COH: 11054230GB-PPON: PRQW-9642-ZJZV C/O Mills & Co Accountants Ltd Kao Hockham Building, Harlow, East of England, CM20 2NQContact email
  • C BIRKBY ELECTRICAL LTDBidder / tendererGB-COH: 10299842GB-PPON: PJTN-2552-JNRG Weald Cottage Maidstone Road, Tonbridge, South East, TN12 0RE
  • CCR PROPERTY SERVICES LTDFramework contractorGB-COH: 07563020GB-PPON: PTGD-5151-VMBN Unit 1 Repton Close, Basildon, East of England, SS13 1LEContact email
  • CHIGWELL (LONDON) PLCFramework contractorGB-COH: 09812304GB-PPON: PTRM-8451-ZBZY Aaron House ,Unit 8 Hainault Business Park, Ilford, London, IG6 3JPContact email
Show 40 more suppliers
  • DARETHEALTHCARE UK LIMITEDFramework contractorGB-COH: 05963297GB-PPON: PVGW-8699-QXLZ 115 Kentlea Road, London, London, SE28 0JFContact email
  • ENVIRON PROPERTY SERVICES LIMITEDFramework contractorGB-COH: 08601905GB-PPON: PTZD-6816-PWWG Unit 12 Parsons Green Depot, London, London, SW6 4HHContact email
  • ETEC CONTRACT SERVICES LIMITEDFramework contractorGB-COH: 05392794GB-PPON: PTRJ-1317-LMRY Suite 7, Elmhurst, South Woodford, London, E18 2QHContact email
  • FIRST FIX HEROES LTDBidder / tendererGB-COH: 14085986GB-PPON: PNDL-8764-CTLR C/O Sjt Accounting Solutions Ltd Abbey House, Redhill, South East, RH1 1QZ
  • FLAMESTAR LTDBidder / tendererGB-COH: 15321673GB-PPON: PNPP-1647-GZBZ 142-143 Parrock Street, Gravesend, South East, DA12 1EY
  • FSG PROPERTY SERVICES LIMITEDFramework contractorGB-COH: 04521341GB-PPON: PGZH-8875-JXDG Unit 2 Blackhill Drive Wolverton Mill, Milton Keynes, South East, MK12 5TSContact email
  • G.J.RUNHAM PLUMBING AND HEATING SERVICES LIMITEDBidder / tendererGB-COH: 11043007GB-PPON: PXGW-5249-LYGQ 101 Thorndike, Slough, South East, SL2 1SR
  • GALMARK ELECTRICAL LTDFramework contractorGB-COH: 12510447GB-PPON: PDBL-7664-CVQM Unit 8 Bybow Farm, Orchard Way, Dartford, South East, DA2 7ERContact email
  • GALMARK PROPERTY SERVICES LIMITEDFramework contractorGB-COH: 05197535GB-PPON: PJBN-6274-NGZD The Old Barn, Swanley, South East, BR8 7PAContact email
  • GLITZ 4UT LTDFramework contractorGB-COH: 12665344GB-PPON: PNQL-5431-NWJG 240-250 Romford Road, London, London, E7 9HZContact email
  • HEALTHY INDOOR ENVIRONMENTS LIMITEDBidder / tendererGB-COH: 07846006GB-PPON: PJWQ-4711-MYZJ 71-75 Shelton Street, London, London, WC2H 9JQ
  • HIVE PROCUREMENT LTDFramework contractorGB-COH: 14149335GB-PPON: PRZG-1897-XRVM Create Business Hub, Ground Floor 5 Rayleigh Road, Brentwood, East of England, CM13 1ABContact email
  • HOLLINGTON & SONS (BUILDERS) LIMITEDFramework contractorGB-COH: 03370671GB-PPON: PCML-4816-ZZNP 3rd Floor 86 - 90 Paul Street, LONDON, London, EC2A 4NEContact email
  • HYDRO CLEANSING LIMITEDBidder / tendererGB-COH: 03916897GB-PPON: PHXM-9861-JPCN HCL House, Beddington Farm Road, Croydon, London, CR0 4XB
  • HYGIENE PRO CLEAN LIMITEDBidder / tendererGB-COH: 10220371GB-PPON: PMYJ-8613-GJQR Unit C Hunter Terrace, Coventry, West Midlands, CV5 6SP
  • KC HOME SOLUTIONS LTDBidder / tendererGB-COH: 15158405GB-PPON: PWVL-7245-MJBW 13 Acorn Avenue, Crawley, South East, RH10 4AL
  • KILNBRIDGE FIRE PROTECTION LTDFramework contractorGB-COH: 16281195GB-PPON: PBMD-8975-VRYG Mcdermott House South Crescent, London, London, E16 4TLContact email
  • KILNBRIDGE STRUCTURES LTDFramework contractorGB-COH: 16262816GB-PPON: PMLM-9476-VNHL Mcdermott House South Crescent, London, London, E16 4TLContact email
  • LOCKSMITH RESCUE LIMITEDFramework contractorGB-COH: 09393117GB-PPON: PPLR-5661-RQDT 34 Ardent Avenue, Deal, South East, CT14 7UEContact email
  • LONDON DRAINAGE FACILITIES LIMITEDFramework contractorGB-COH: 05419271GB-PPON: PCZW-2378-MDTJ 11-12a Hallsford Bridge Industrial Estate, Ongar, East of England, CM5 9RXContact email
  • LPC MAINTENANCE LIMITEDBidder / tendererGB-COH: 03096922GB-PPON: PXYH-3659-VXVY London North Studios The Ridgeway, London, London, NW7 1RP
  • MCLOUGHLIN DECORATING LIMITEDFramework contractorGB-COH: 03120141GB-PPON: PDLJ-6831-LBTV 142 St Marks Road, Enfield, London, EN1 1BJContact email
  • MCLOUGHLIN PLANNING LTDFramework contractorGB-COH: 06964115GB-PPON: PHLD-7538-DNCX De La Bere House, Cheltenham, South West, GL50 3AWContact email
  • MSJ DRAIN CLEARANCE LIMITEDBidder / tendererGB-COH: 05628837GB-PPON: PRML-3469-RBDM 9 High Street, Downe, London, BR6 7US
  • MULALLEY & CO. LIMITEDFramework contractorGB-COH: 01534913GB-PPON: PDVH-1753-WZJH Teresa Gavin House, Woodford Green, London, IG8 8FAContact email
  • NRT BUILDING SERVICES GROUP LIMITEDFramework contractorGB-COH: 03229578GB-PPON: PVCZ-2738-ZJND Castle House, Banstead, South East, SM7 3BTContact email
  • PARAGON BUILDING SOLUTIONS LTDBidder / tendererGB-COH: 10427270GB-PPON: PXWV-4921-LMZQ Unit4 Gourley Place, London, London, N15 5NF
  • PINPOINT ENVIRONMENTAL SERVICES LTDBidder / tendererGB-COH: 12198361GB-PPON: PZPT-4596-VXYT 7 Findhorn Avenue, Hayes, London, UB4 0DG
  • PROFESSIONAL CONSTRUCT LTDBidder / tendererGB-COH: 12518026GB-PPON: PXTB-7961-DQWT 17 Felicia Way Chadwell, Grays, East of England, RM16 4JE
  • PURDY CONTRACTS LIMITEDFramework contractorGB-COH: 01830283GB-PPON: PNTN-7178-WHJD Norfolk House, 13 Southampton Place, London, London, WC1A 2AJContact email
  • QUANTUM BUILD SERVICES LTDBidder / tendererGB-COH: 13965997GB-PPON: PJNG-6539-CQMQ 513 London Road, Sutton, London, SM3 8JR
  • R. & M.A. STEWART LIMITEDFramework contractorGB-COH: 01891284GB-PPON: PWPQ-8819-TZZP Unit 10 Bessemer Park, Herne Hill, London, SE24 0HGContact email
  • R. BENSON PROPERTY MAINTENANCE LIMITEDFramework contractorGB-COH: 04296835GB-PPON: PPGV-7628-XQNM Unit 1 Anglo Business Park, Asheridge Road, Chesham, South East, HP5 2QAContact email
  • RELATIVE GROUNDWORK LIMITEDFramework contractorGB-COH: 04392972GB-PPON: PQMZ-4832-BPNH Relative House, Orpington, London, BR6 0JPContact email
  • RIGFORD LTDFramework contractorGB-COH: 09897346GB-PPON: PWGC-1499-ZXGN 255 Green Lanes, London, London, N13 4XEContact email
  • SER CONTRACTOR LTDFramework contractorGB-COH: 07468643GB-PPON: PWRQ-4833-WBYX Hunters Hall Farm, Epping, East of England, CM16 6PLContact email
  • SKYSCAN SOLUTIONS LTDBidder / tendererGB-COH: 15925315GB-PPON: PLYH-8923-ZMJP 26 Letchmere Close, Wolverhampton, West Midlands, WV6 7AJ
  • STARS ROOFING LTDFramework contractorGB-COH: 14116495GB-PPON: PJXH-8319-CTLP 53 Courthill Road Courthill Road, London, London, SE13 6DNContact email
  • T Gilmartin LtdFramework contractorGB-COH: 4169879GB-PPON: PHJZ-2252-GCDY Gilmartins Building, Houghton Hall Park, Houghton Regis, Dunstable, East of England, LU5 5YGContact email
  • T W DRAINAGE LTDBidder / tendererGB-COH: 07457728GB-PPON: PXYH-2165-ZXCW TWWorks, Holmesdale Road, South Darenth, Dartford, South East, DA4 9JP

Official documents & specifications (17)

Official links; attachments are not copied

Tender pack and attachments

  • Signed contract contractSigned contractPDFYear 1 Framework
  • Signed contract contractSigned contractPDFYear 1 Framework
  • Bidding documents and specifications tenderBidding documents and specificationsAll documentation can be found within the attachments section of ProContract, with a list of Schedules/Appendices within Schedule 1.
  • Signed contract contractSigned contractPDFCopy of final contract document for the Framework, year 1

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 5 more notices
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Preliminary market engagement notice planningPreliminary market engagement noticeUK2Preliminary market engagement notice on Find a Tender