Find a TenderClosedTender notice
Published 1 Sept 2026, 10:48 BST

Official UK procurement notice

Steel Fabrications · UK public procurement notice

Official notice

Authority: NORTHUMBRIAN WATER LIMITED

Framework agreement2 lotsWorksCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£8,000,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 1 Oct 2026
Lots 2see the lot list below
Framework period 2 yrsends 7 Jan 2029 · up to 7 Jan 2033 with extensions · starts 8 Jan 2027

What is being bought2 lots · detail below

Published requirement description

NWL are looking to appoint suppliers to provide general steel fabrication services to support the delivery of the capital investment programme. Suppliers will ensure projects are being delivered in the most efficient manner, with a suitable and sustainable commercial model driving value for the business. NWL are always looking at how we can use innovation in both working methods and technology while striving to reduce our carbon footprint and we will expect any successful applicants to help us achieve this.

This framework will be split into two sublots:

  • Lot 1A Northumbrian Water Operating Region
  • Lot 1B Essex & Suffolk Operating Region

Scope:

The steel fabrication services framework includes general steel fabrication and covers wide and diverse areas and asset bases including the following:

  • Operational Sites eg Sewage and Water Treatment Works, Pumping Stations, Reservoir Sites
  • Office and Laboratory Buildings (low probability of works on these sites but there may be an adhoc requirement)
  • Leisure Facilities eg Kielder and Hanningfield Reservoirs

The main work disciplines/work types are general steel fabrication services including the design, supply, manufacture, fabrication, galvanising, delivery, offloading, distribution, placement, installation, site supervision and documentation associated with the below:

  • Ladders
  • Handrails
  • Spring loaded gates
  • Gantries
  • Steps
  • Open Mesh Flooring
  • Bespoke covers
  • Chequer plate covers
  • Toe plates
  • Platforms
  • Walkways
  • Companionways
  • Bespoke Louvres
  • Steelwork Access Platforms including Stairs
  • Pipe Supports
  • Pipe Bridges
  • GMS Chequer Plate Flooring
  • Handrailing and Kickplates
  • Wall Restraint Steelwork
  • Launder Trough and Hoppers
  • Pumping Station Access
  • Debris Screens
  • Stainless Steel Electrical Panel Boxes
  • Bespoke Fabrications to suit COPA Sac Installations
  • Stainless Steel Containment for Boreholes
  • MCC Support Steelwork
  • Bespoke Fabricated Pump Chamber/Tank

As well as:

  • On site welding
  • On site burning
  • On site repairs to existing structures
  • On site modifications to existing structures

This is not an exhausted list and other steel products not listed could be requested through the successful contractors.

  • The authority expects to re-tender this requirement around 8 Jan 2027, 23:59 GMT.
  • How the procedure runs: Stage 1: Invitation to Participate & Conditions of Participation This stage begins with the issuing of a Tender Notice. Suppliers who have expressed interest will be invited to complete a Conditions of Participation questionnaire and submit their tenders. The assessment of these responses will identify the top 8 number of suppliers per lot to be invited to participate in Stage 2. Stage 2: Invitation to Submit Initial Tenders Suppliers who were shortlisted at Stage 1 will be invited to Stage 2 to submit their tenders. All tenders must be submitted in line with the Procurement Timetable and instructions contained in this document and any supplementary information provided. After the tender deadline, NWL will assess all submissions using the process and award criteria outlined in the Tender Notice and this document. Stage 3: Invitation to submit a Best and Final Offer (BAFO) Stage 3 will commence with the issuing of a notification requesting bidders to submit their Best and Final Offers. Best and Final offers must be submitted in accordance with the Procurement Timetable and instructions set out in this document and any additional information provided. NWL will also consider whether any supplier (or associated entities relied upon to meet participation conditions) is an excluded or excludable supplier under the Act. If a supplier is excludable solely due to an associated supplier or subcontractor, NWL will notify them and provide a reasonable opportunity to replace that entity. If NWL subsequently disregards a tender due to exclusion, or an associated entity is replaced, NWL will notify the Procurement Review Unit (PRU) within 30 days. NWL will identify the most advantageous tender(s) in line with the stated methodology and disregard any tender from suppliers not meeting the Conditions of Participation. This assessment will identify the supplier(s) successful in each Lot. Following this assessment, NWL will provide an assessment summary to all suppliers who submitted a tender including: • whether they have been awarded the contract, • an explanation of how their tender was assessed against the award criteria, and • information about the most advantageous tender where this differs from their own. A Contract Award Notice will then be published on the Central Digital Platform to commence the mandatory standstill period. Once the standstill period concludes, NWL will enter the preferred supplier stage with the selected supplier. Stage 3: Preferred Supplier Stage The highest scoring supplier(s) will be invited to engage with NWL within the limitations of the Act. This stage concludes with NWL entering into the contract with the preferred supplier.

CPV: Assembly of metal structures · Installation of metal structures · Structural steel erection work · Structural steelworks · Structural works

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Framework period
2 yrs · up to 6 yrs from 8 Jan 2027
Published description of the framework

The pricing and selection process will be as per framework documents.

Lots and requirements (2)Procurement structure

2 lots · all with a published value · same evaluation weights on every lot
Lot #1Steel Fabrications - NWL Operating AreaRenewal North East 2 yrsSMEPublished value£6,400,000
Contract period: 8 Jan 2027 – 7 Jan 2029 (2 yrs) · up to 7 Jan 2033 with extensionsValue: £6,400,000 exc. VAT · £7,680,000 inc. VAT
Delivery: North EastEligibility: SME eligible
Extensions: The duration is 4 years with the option to extend for a further 4 years in any combination of extensions (8 years in total).
Lot #2Steel Fabrications - ESW Operating AreaRenewal East of England 2 yrsSMEPublished value£1,600,000
Contract period: 8 Jan 2027 – 7 Jan 2029 (2 yrs) · up to 7 Jan 2033 with extensionsValue: £1,600,000 exc. VAT · £1,920,000 inc. VAT
Delivery: East of EnglandEligibility: SME eligible
Extensions: The duration is 4 years with the option to extend for a further 4 years in any combination of extensions (8 years in total).

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 2 lots
Quality: 50%Price: 50%
Published award criteria (2)
  • Quality
  • Price
What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Steel Fabrications” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Yes · next expected 8 Jan 2027
First published
1 Sept 2026, 10:48 BST
Last source update
1 Sept 2026, 10:48 BST
Award evaluation window
Submission end – 8 Jan 2027
Authority reference
FA08-33
FTS notice number
2026/S 000-082517
Latest notice
Tender notice (UK4)
Classification (CPV)
Assembly of metal structuresInstallation of metal structuresStructural steel erection workStructural steelworksStructural works
Delivery area
North East (UKC)East of England (UKH1)
Official registry OCID
ocds-h6vhtk-06ef42 Find a Tender
How it runs

Stage 1: Invitation to Participate & Conditions of Participation

This stage begins with the issuing of a Tender Notice. Suppliers who have expressed interest will be invited to complete a Conditions of Participation questionnaire and submit their tenders.

The assessment of these responses will identify the top 8 number of suppliers per lot to be invited to participate in Stage 2.

Stage 2: Invitation to Submit Initial Tenders

Suppliers who were shortlisted at Stage 1 will be invited to Stage 2 to submit their tenders.

All tenders must be submitted in line with the Procurement Timetable and instructions contained in this document and any supplementary information provided.

After the tender deadline, NWL will assess all submissions using the process and award criteria outlined in the Tender Notice and this document.

Stage 3: Invitation to submit a Best and Final Offer (BAFO)

Stage 3 will commence with the issuing of a notification requesting bidders to submit their Best and Final Offers.

Best and Final offers must be submitted in accordance with the Procurement Timetable and instructions set out in this document and any additional information provided.

NWL will also consider whether any supplier (or associated entities relied upon to meet participation conditions) is an excluded or excludable supplier under the Act. If a supplier is excludable solely due to an associated supplier or subcontractor, NWL will notify them and provide a reasonable opportunity to replace that entity.

If NWL subsequently disregards a tender due to exclusion, or an associated entity is replaced, NWL will notify the Procurement Review Unit (PRU) within 30 days.

NWL will identify the most advantageous tender(s) in line with the stated methodology and disregard any tender from suppliers not meeting the Conditions of Participation. This assessment will identify the supplier(s) successful in each Lot.

Following this assessment, NWL will provide an assessment summary to all suppliers who submitted a tender including:

  • whether they have been awarded the contract,
  • an explanation of how their tender was assessed against the award criteria, and
  • information about the most advantageous tender where this differs from their own.

A Contract Award Notice will then be published on the Central Digital Platform to commence the mandatory standstill period.

Once the standstill period concludes, NWL will enter the preferred supplier stage with the selected supplier.

Stage 3: Preferred Supplier Stage

The highest scoring supplier(s) will be invited to engage with NWL within the limitations of the Act.

This stage concludes with NWL entering into the contract with the preferred supplier.

How it was run

Official notice
Run through: SAP Ariba · Who buys & how to bid on SAP Ariba
Electronic submission allowedLanguage: EN
Appointment period ends
1 Oct 2026, 23:59 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Applicants are asked to note that this procurement process will be conduced electronically with all documents and communication being managed through the Northumbrian Water eSourcing Spend Management portal called 'Ariba' (s1.ariba.com ↗).

Expressions of interest from this notice must be sent to the e-mail address [email protected] before the deadline date of the Thursday 24th September 2026 at 12:00hrs. Once expression of interest has been received that contains the details below, applicants will be given access to the Ariba portal within 48 hours from request. This portal will contain all the tender documents associated with this procurement that are available at the time. An email link will also be provided to the email address you provide to access the portal.

When sending expression of interest, applicants must provide the following information: 1) Full company name 2) Main contact details of the person who will be given access to the Ariba portal - Name, job title, E mail address and telephone number. (The deadline for return of the completed PQQ/Conditions of Participation is Thursday 1st October 2026 at 12noon).

Timeline

1 Sept 2026 → 8 Jan 2027 · 4 dates
  1. Tender notice published51 days ago
    1 Sept 2026, 10:48 BST
  2. Admission / appointment period ends20 days ago · period end, not a bid countdown
    1 Oct 2026, 23:59 BST
  3. Today
    22 Oct 2026
  4. Contract startsin 78 days
    8 Jan 2027
  5. Award decision expected byin 79 days
    8 Jan 2027, 23:59 GMT

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    1 Sept 2026, 10:48 BST
    UK4

Contracting authority & participating public bodies

NORTHUMBRIAN WATER LIMITED

Contracting authorityPrivate utility GB-COH: 02366703 · GB-PPON: PRLG-5541-VHHG Northumbria House, Pity Me, North East, DH1 5FJContact name, email

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender