Official UK procurement notice
SC240044 - Local Highway Maintenance Support Contract 2025
Authority: Kent County Council (Local council)
What is being bought6 lots · detail below
Published requirement descriptionClosed opportunity - This means that the contract is currently closed. The buying department may be considering suppliers that have already applied, or no suitable offers were made.
Kent County Council (KCC) as upper tier Authority is the Highway Authority for highways maintainable at public expense and has such duty to maintain highways in accordance with S.41 of the Highways Act 1980. In order to meet and deliver upon these statutory obligations KCC requires competent contractors as there is no internal KCC employed resource to undertake this work
There are around 5,445 miles of local roads in Kent (616 miles of A roads, 279 of B roads, 1,172 of C roads and 3,378 of unclassified roads), making it one of the largest and most heavily trafficked local authority networks in the country.
The workload will be divided into six geographical areas, and awarded separate contracts. Suppliers may bid for any number of areas but will be awarded no more than two. The contract carries an initial term of three years, with options to extend for a further two years.
Works orders are raised by KCC Highway staff. The works will consist of small and medium patching generally within the carriageway. Small elements of footway patching may also be requested. Pre-site inspections will be undertaken, jointly between KCC and the Contractor where necessary, to minimise issues that may prevent the work from being carried out.
The contractors will deliver a programme of works over a 6- to 8-month period, usually between April through to October when the weather and road temperatures are optimal for highway repairs. The contractors will provide sufficient resource to achieve minimal deviation from projected timescales. Operatives are to be fully trained and have the required level of qualifications and expertise to deliver works and will be required to take before and after photos at each site. The key aim of these contracts is to deliver a permanent, quality first-time repair, including adjusting iron works and reinstating all white lining.
The Contractor is responsible for managing all aspects of traffic management according to the Code of Practice for Safety at Street Works & Road Works and the New Roads and Street Works Act 1991.
CPV: Construction work · Repair, maintenance and associated services related to roads and other equipment
Lots and requirements (6)Procurement structure
6 lots · no lot values published · win at most 2 of themLot #1Dartford and GraveshamRenewal
Covering Dartford and Gravesham
Lot #2Sevenoaks and Tunbridge WellsRenewal
Covering Sevenoaks and Tunbridge Wells
Lot #3Maidstone and Tonbridge & MallingRenewal
Covering Maidstone and Tonbridge & Malling
Lot #4Swale and CanterburyRenewal
Covering Swale and Canterbury
Lot #5Thanet and DoverRenewal
Covering Thanet and Dover
Lot #6Ashford and Folkestone & HytheRenewal
Covering Ashford and Folkestone & Hythe
Procedure terms & legal framework
From the official record- Procedure method
- Competitive procedure with negotiation
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Yes
- First published
- 11 Apr 2025, 18:30 BST
- Last source update
- 11 Apr 2025, 18:30 BST
- Authority reference
DN762100- FTS notice number
2025/S 000-014784- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0501fcFind a Tender
How it was run
Official notice- Submission deadline
- 12 Apr 2025, 00:05 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
Timeline
11 Apr 2025 → 12 Apr 2025 · 2 dates- Notice published11 Apr 2025, 18:30 BST
- Submission deadline12 Apr 2025, 00:05 BST
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.