Find a TenderAwardedContract award notice
Published 4 Mar 2025, 15:07 GMT

Official UK procurement notice

Remove Existing Foot Path and Install a new Foot Path.

Official notice

Authority: Shifnal Town Council (Local council)

Framework agreementWorksOpen procedureAbove thresholdSME suitableAccelerated
Framework ceiling (notional)£26,000framework ceiling, not attributable revenue
Submissions closed 4 Apr 2025awarded 28 Apr 2025
Awarded to RIO SURFACING LIMITED
Framework period 1 moends 30 May 2025 · starts 12 May 2025

What is being bought

Published requirement description

Shifnal Town Council (The Employer) is seeking a suitably qualified company (The Contractor) to remove the existing tarmac foot path and install a new tarmac foot path.

This is the 1st of 3 phases to replace the existing tarmac foot paths in St. Andrew's churchyard.

The location of the site is St. Andrew's Churchyard, Church Street, Shifnal, Shropshire, TF11 9AB.

CPV: Footpath construction work

How this framework works

From the published notice
Type
Closed framework
Call-offs
every call-off is a further competition among the appointed suppliers
Places
up to 25 suppliers · 5 bids received (0.2 per place) · 1 appointed
Framework period
1 mo from 12 May 2025
Published description of the framework

Matrix scoring as laid out in the main tender document

The lotProcurement structure

single lot · value published
Lot #1Awarded 1 moSMEPublished value£26,000
Contract period: 12 May 2025 – 30 May 2025 (1 mo)Value: £26,000 exc. VAT · £31,200 inc. VAT
Delivery: West MidlandsEligibility: SME eligible

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 50%Price: 50%
Published sub-criteria (4)
  • Specification: 40%
  • Quotation: 10%
  • Questions: 30%
  • Total Cost: 20%
Published award criteria (4)
  • Specification: Complete Appendix 3 in response to each of the required specifications outlined in Section 3.2. Answer with either a 'Yes', 'No' or 'Partial' and notes to accompany response which detail the specifications you are proposing.
  • Questions: 1. Confirm how your company manages supply chains in relation to meeting time frames, quality control, health and safety and assess their performance and output. Please be specific in terms of processes, performance indicators and the personnel involved. 2. Outline details of the experience and qualifications in terms of the company, employees and sub-contractors that will be involved in delivering this project. Provide specific detail on individual qualifications, company memberships and what sector and facilities the company specialise in.
  • Total Cost: Scoring will be made according to the overall cost of project. Scoring on cost will be based on increments that are proportionate and fair to the submissions provided from highest to lowest cost as a percentage of the proposed budget. Example: proposals that are within the budget will score an automatic 5/10 then increase based on the increment of submissions. If the cost difference is deemed minimal (i.e. less than 1%) between suppliers, the scoring will be considered equal.
  • Quotation: Suppliers are to provide: An itemised quotation
What this means for your bid
  • Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
  • “Remove Existing Foot Path and Install a new Foot Path.” is a framework: the contest is a place on its panel, up to 25 suppliers, not a single contract: each call-off is a further competition, so the pricing contest starts after appointment.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
4 Mar 2025, 15:07 GMT
Last source update
29 Apr 2025, 10:13 BST
Award evaluation window
Submission end – 25 Apr 2025
Authority reference
STC001
FTS notice number
2025/S 000-007886
Accelerated
State of urgency
Latest notice
Contract award notice (UK6)
Classification (CPV)
Footpath construction work
Delivery area
West Midlands (UKG)
Official registry OCID
ocds-h6vhtk-04e96e Find a Tender

How it was run

Official notice
Appointment period ends
4 Apr 2025, 16:00 BST
Electronic submission
Not allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Shifnal Town Council

Shifnal Community Hub

Tudor Way

Shifnal

TF11 8DJ

Timeline

4 Mar 2025 → 12 May 2025 · 6 dates
  1. Tender notice published
    4 Mar 2025, 15:07 GMT
  2. Admission / appointment period endsperiod end, not a bid countdown
    4 Apr 2025, 16:00 BST
  3. Award decision expected by
    25 Apr 2025, 23:59 BST
  4. Assessment summaries sent
    28 Apr 2025, 00:00 BST
  5. Latest notice published
    29 Apr 2025, 10:13 BST
  6. Contract starts
    12 May 2025, 00:00 BST

Notice history

6 events · 4 releases on Find a Tender · since 4 Mar 2025
  1. Tender notice published
    4 Mar 2025, 15:07 GMT
    UK4
  2. Tender notice published
    19 Mar 2025, 11:59 GMT
    UK4
  3. Tender notice published
    19 Mar 2025, 12:02 GMT
    UK4
  4. Contract award notice published
    29 Apr 2025, 10:13 BST
    UK6
  5. Status changed to complete
    29 Apr 2025, 10:13 BST
  6. Contract signature expected
    29 Apr 2025, 23:59 BST
    scheduled
Published amendments (2)

IMPORTANT CHANGE: Please not that the square meterage was published incorrectly in the original documents. The correct square meterage is 318m2 not 159m2 as previously published.

IMPORTANT CHANGE: Please note that the square meterage was published incorrectly in the original documents. The correct square meterage is 318m2 not 159m2 as previously published.

Routine re-releases (4)
  • 2025-03: 1 release · 4 Mar 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awarded toValueDateStatus
RIO SURFACING LIMITEDSME12 May 2025 – 30 May 2025£23,44028 Apr 2025Awarded

Bid statistics published by the authority

BidsSMEVCSEValid bid range
5final-stage tenders50—

Contracting authority & participating public bodies

Shifnal Town Council

Contracting authorityPublic authority - sub-central government GB-PPON: PYZX-5164-PHTG Shifnal Community Hub, Tudor Way, Shifnal, West Midlands, TF11 8DJContact name, email, phone

Framework contractors & participating bidders

1 commercial party on the notice
  • RIO SURFACING LIMITEDFramework contractorGB-COH: 01176777GB-PPON: PZYY-4576-QHPN 50 Devon Street, Birmingham, West Midlands, B7 4SLContact email

Official documents & specifications (10)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender