Refurbishment of Lysons Enterprise Estate
Authority: Guildford Borough Council (Local council)
Guildford Borough Council are seeking expression of interest from D&B Contractors for the refurbishment of 19 light industrial units constructed in the 1980’s which have now reached the end of their useful life and require significant upgrading works. The Council intends to follow a 2-stage Design & Build procurement route comprising a Stage 1 PCSA followed by a Stage 2 Design & Build Contract The contractor will be required to assume responsibility for completion of the design and delivery of the works under a Design & Build contract. The units are currently failing the Minimum Energy Efficiency Standards (MEES) regulations.
What is being bought
Published requirement descriptionGuildford Borough Council are seeking expression of interest from D&B Contractors for the refurbishment of 19 light industrial units constructed in the 1980’s which have now reached the end of their useful life and require significant upgrading works. The Council intends to follow a 2-stage Design & Build procurement route comprising a Stage 1 PCSA followed by a Stage 2 Design & Build Contract The contractor will be required to assume responsibility for completion of the design and delivery of the works under a Design & Build contract.
Arranged in three terraces, to provide individual self-contained units, the construction is steel frame with powder coated, profiled steel sheeting and incorporating glazed panels. Each unit has an up and over loading door (manually operated) along with personnel door. Internally the units are single storey and open plan except for a WC block. Electricity and gas are connected. The eaves height is approx. 3.2 m. The units were originally built with lighting but no heating, though over the years some tenants have installed heating and internal fit outs to varying degrees. Externally there is parking, circulation areas and landscaping.
Floor areas: Buildings: 1,155 sq m GIA (Combined units)
Total Site area: 4,611 sq m (1.14 acres).
The units are currently failing the Minimum Energy Efficiency Standards (MEES) regulations.
The Council is now undertaking a programme of refurbishment to upgrade the existing accommodation to a standard that meets occupier requirements, ensuring compliance with MEES regulation, whilst seeking to achieve an EPC rating of ‘A’ across the estate.
Scope of works:
Unit mix:
- 8 single bay (mid terrace) 56 sqm
- 3 single bay (end terrace) 59 sqm
- 3 twin bay 117 sqm
- 1 triple bay 172 sqm
Total number of units:15
Total gross internal area: 1,148 sqm (all ground floor as per existing).
The appointment is expected to be split into a 2 stage tender:
Stage 1: Appointment under a Pre-Construction Services Agreement (PCSA) to develop the design, support planning, undertake surveys, develop the contractor's proposals, programme and target cost/open book pricing. This is to include but is not limited to:
- Develop designs and submit planning application
- Review buildability
- Undertake surveys
- Develop construction methodology
- Review phasing and tenant impacts
- Develop programme
- Develop package procurement strategy
- Produce open-book pricing
- Identify risks and value engineering opportunities
Stage 2: Subject to successful completion of Stage 1, approval of the developed design, agreed contract sum and governance approvals, the Council may enter into a Design & Build Contract with the Stage 1 contractor to deliver the works.
The construction works are likely to include:
- Recladding of the three existing terraces including associated work to mechanical and electrical services, if required, and repairs to external works.
- New doors and windows
- PV panels to upgrade to EPC A only as required
- Limited landscaping works and tree works
- No new service connections
- No significant external works other than making good and repair
Draft Timescales:
Soft market engagement: October 2026
Executive Approval: October 2026
ITT for PCSA Stage 1: October– December 2026
PCSA Stage 1: Contract Award: January 2027
RIBA 1-3 (until planning submission): February – March 2027
Stage 2 Contract Negotiation, Governance and Award: April – September 2027
Construction: January 2028 – December 2028
CPV: Electrical installation work · Facade work · Installation of doors and windows and related components · Landscaping work · Office block construction work · Solar panel roof-covering work
The lotProcurement structure
single lot · no lot value publishedPipeline intelligence · planning stage: how this market runs before the tender is published
How Guildford Borough Council buys Building construction work (CPV 4521), and who usually turns up
Guildford Borough Council’s published record next to the market for the same work. Frameworks and DPS are left out: they draw different bid counts. Whole-market view: Building construction work (CPV 4521) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
Local means the winner is registered in the region where that award was delivered. The market figure counts awards delivered in South East England (authority’s region).
Most of this buyer’s recorded winners were registered in the region where that award was delivered.
i
Half of these awards have an award date within 82 days of the bid deadline.
i
Both shares are minimums: some awards have no bid count.
Direct awards or one recorded bid are common here. Check the route before spending time on a bid.
How many bids did past lots attract?
i
1 bid18% / 15%
2–318% / 31%
4–618% / 33%
7+45% / 21%
How did awards compare with estimates?
i
Below estimate39%
Within ±2%21%
Above estimate39%
Assess each lot i
i
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1CPV 45Estimate not published
This lot lists more than one class in CPV 45. The comparison uses that group.
i
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 325 past lots.
1 bid12%
2–323%
4–629%
7+36%
i
No comparable awards for this lot yet.
Who has supplied this buyer on similar work? i
i
No earlier contract of this buyer matches this lot on the published record.
Who could compete for this lot? i
i
Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.
About this data
- Estimates, labelled. The price range, possible competitors and earlier-work matches are our estimates from past awards, not published facts, win chances or price advice. The buyer’s own record and the wider market are shown apart, never mixed.
- Source. Official UK public procurement notices (Find a Tender and Contracts Finder), reused under the Open Government Licence v3.0, updated through the day and rebuilt nightly. Not every figure uses both feeds, and each one shows how many records it rests on: see the methodology. Spotted something wrong? Tell us.
Coming up in this sector
Contracts ending within 12 months · Retender Radar, sector filter set
Procedure terms & legal framework
From the official record- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Planned procurement
- Procurement threshold
- Below threshold
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 30 Sept 2026, 09:59 BST
- Last source update
- 30 Sept 2026, 09:59 BST
- Authority reference
CRPN-00711- FTS notice number
2026/S 000-092174- Latest notice
- Preliminary market engagement notice (UK2)
- Classification (CPV)
- Delivery area
- Not published
- Official registry OCID
ocds-h6vhtk-077d1fFind a Tender
How it was run
Official notice- Submission deadline
- —
Timeline
30 Sept 2026 → 31 Jan 2027 · 3 dates- Planning notice published45 days ago30 Sept 2026, 09:59 BST
- Market engagement35 days ago10 Oct 2026, 00:59 BST
Interested contractors are invited to submit an expression of interest by email to [email protected] by 9 October 2026. Please provide the following information:
- Company name
- Name and job title of the principal contact
- Contact email address
The Council may provide further information to interested parties and may arrange a market engagement activity in October. Details of any such event, including the date, time, location and joining instructions, will be communicated directly to interested parties.
- Today14 Nov 2026
- Contract startsin 77 days31 Jan 2027
Notice history
1 event · 1 release on Find a Tender- Preliminary market engagement notice published30 Sept 2026, 09:59 BSTUK2
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (1)
Official links; attachments are not copiedNotices published for this procedure
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender