Official UK procurement notice
Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement
Authority: Bazalgette Tunnel Limited t/a Tideway
What is being bought
Published requirement descriptionRapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:
Following completion of the Works on the Thames Tideway Tunnel (TTT) project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36 month period.
Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period.
Tideway is inviting suppliers in relevant industries to respond initially to a market engagement questionnaire so that Tideway can better understand the industry, its capabilities, capacity and appetite for a potential service package.
To express interest in this opportunity and to receive the market engagement documentation, suppliers should register through emailing [email protected] with relevant organisation and individual contact details.
Suppliers who register will then be provided with a market engagement briefing paper which will provide further details of the package in question and a market engagement questionnaire for review and completion for issue back to Tideway. Information provided will assist with internal procurement planning prior to issue of Pre-Qualification Questionnaire, currently planned for March 2024.
Further details of the Thames Tideway Tunnel Project can be found at www.tideway.london ↗.
CPV: Architectural, construction, engineering and inspection services · Civil engineering machinery · Construction equipment · Construction management services · Construction project management services · Cranes · Hire of cranes with operator · Tunnel operation services · Tunnelling works
The lotProcurement structure
single lot · no lot value publishedLot #1Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:Planned
Rapid Response & Tunnel Access Services for the Thames Tideway Tunnel - Market Engagement:
The Thames Tideway Tunnel (TTT) is 25km (15.5m) long, stretching from Acton in west London to Abbey Mills Pumping Station in the east, and is built on a gradient so flows travel west to east. At its deepest, it is 67m underground (33m at its shallowest) and the internal diameter of the tunnel is 7.2m. There are 21 shafts constructed on the project which will be used to divert sewage flows from London’s existing Victorian sewage network to the new 25-kilometre tunnel, which range in depth from c.35-c.65 metres across the project.
Following completion of the Works on the TTT project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36-month period. Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period.
The Service consists of three core elements to be delivered by the Contractor which are summarised as follows:
- Rapid response tunnel access: In support of search and rescue missions that will be carried out by Tideway’s Search & Rescue Contractor.
Tideway’s Search & Rescue Contractor may be called upon at any time to undertake search and rescue missions in the TTT network. For example, they may be called upon to locate and rescue intruders. Whilst the Search & Rescue Contractor will provide the specialist rescue teams and equipment, their entry to and egress from the tunnel network will be facilitated by the Contractor who will provide the lifting plant and people-carrier baskets that can be rapidly deployed at two project locations simultaneously.
- Planned tunnel access: In support of tunnel inspections and repairs that will be carried out by Tideway’s Inspection Services Contractor and Others as appropriate.
Tideway’s Tunnel Inspection Contractor will undertake a detailed inspection of the TTT network under a planned tunnel shutdown during the System Acceptance Period. If the inspections uncover defects and/or high levels of sediment in the tunnels that require removal, then a further planned tunnel shutdown may be required during the System Acceptance Period to facilitate the repairs and sediment removal by Other Contractors.
The Contractor will manage the tunnel shutdowns; provide temporary air ventilation; provide over pumping and tankering; facilitate the Tunnel Inspection Contractor’s and Other Contractors with access to and egress from the tunnels by providing the lifting plant and carrier baskets at up to twenty-one project locations simultaneously.
- Rapid response access to remove blockages: From near surface parts of the tunnel infrastructure.
When instructed by Tideway, the Contractor will be responsible for the removal of blockages from near surface civil structures (called vortex generators) at any time during the System Acceptance Period. The Contractor will provide the plant and the people that can be rapidly deployed to undertake the removal.
Further details of the Thames Tideway Tunnel Project can be found at www.tideway.london ↗.
Procedure terms & legal framework
From the official record · publisher note attached- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Services
- Notice status
- Past planning notice
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 15 Nov 2023, 14:56 GMT
- Last source update
- 15 Nov 2023, 14:56 GMT
- FTS notice number
2023/S 000-033793- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-041a14Find a Tender
Publisher note: Rapid Response & Tunnel Access for the Thames Tideway Tunnel - Market Engagement: Following completion of the Works on the Thames Tideway Tunnel (TTT) project, Tideway is responsible for maintaining the TTT network during the System Acceptance period which currently runs from approximately mid 2025 for a minimum of 18 and up to a 36 month period. Tideway is therefore exploring service delivery options for rapid response & tunnel access capability across the 21 project sites during the System Acceptance period. Tideway is inviting suppliers in relevant industries to respond initially to a market engagement questionnaire so that Tideway can better understand the industry, its capabilities, capacity and appetite for a potential service package. To express interest in this opportunity and to receive the market engagement documentation, suppliers should register through emailing [email protected] with relevant organisation and contact details. Suppliers who register will then be provided with a market engagement briefing paper, which will provide details of the package in question and key dates etc, and a market engagement questionnaire for review and completion. This exercise is being carried out in advance of any formal procurement process. It is not a pre-qualification or tendering exercise. Tideway is under no obligation to issue any procurement opportunity as a result of this engagement exercise, and this exercise should not be taken as any indication of intent. The market engagement process may be terminated or suspended at any time without cost or liability to Tideway. No contractual rights, express or implied, arise out of this Periodic Indicative Notice or the procedures envisaged by it.
How it was run
Official notice- Submission deadline
- —
Timeline
15 Nov 2023 → 26 Feb 2024 · 2 dates- Notice published15 Nov 2023, 14:56 GMT
- Tender notice expected26 Feb 2024
Commercial outcome & contract awards
Pipeline notice- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.