Provision of UPS - MEICA-UPS-01
Authority: BIP SOLUTIONS LIMITED
The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Each UPS shall provide an output fault current of 987 A for 200 ms.
What is being bought
Published requirement descriptionThe Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green.
- Technical Requirements
Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable.
Requirement Stoneleigh Canley Brook Burton Green
Battery sizing load 35 kW 17 kW 70 kW
Connected design load 31 kW TBC 66 kW
Protection breaker 100 A 100 A 250 A
Separate static switch N/A N/A 400 A, 400 V
Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements.
- Batteries
Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations.
- Transformers and Ancillary Equipment
Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated.
Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards.
- Monitoring
Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing.
- Delivery and Coordination
Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture.
- Testing and Handover
Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance.
Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals.
Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture.
Additional information: Please review attached schematic and narrative specification.
CPV: Electrical installations for railways · Special-purpose electrical goods
More open work like this
Other notices open now · live search, filters set
What it takes to wini
Evaluation split and conditions of participation as published; the tender pack may add morei
- Turnover usually expected at this size: about £1,000,000 (twice the annual value).
Turnover is an indicative market norm (≈2× annual value), not a published condition.
Procedure terms & legal framework
From the official record- Procedure method
- Other - Open
- Procurement category
- Goods
- Notice status
- Open for tender
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 19 Nov 2026, 14:23 GMT
- Last source update
- 19 Nov 2026, 14:23 GMT
- Authority reference
C4N123459269- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-b5fd17-8724de8a-4519-4688-9186-05770e349d4eContracts Finder
How to participate & submission route
Official notice- Requests to participate (first stage)
- —
- Tender submission deadline
- 25 Nov 2026, 14:55 GMT
- Clarification deadline
- —
Timeline
19 Nov 2026 → 25 Nov 2026 · 2 dates- Tender notice published8h ago19 Nov 2026, 14:23 GMT
- Today19 Nov 2026
- Submission deadlinein 5 days25 Nov 2026, 14:55 GMT
Notice history
1 event · 1 release on Contracts Finder- First tender notice published19 Nov 2026, 14:23 GMT
Commercial outcome & contract awards
Nothing awarded yet- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedNotices published for this procedure
- Tender notice Opportunity notice on Contracts Finder
- Tender notice Please follow this link to view the notice.