Contracts FinderOpen for tender
Published 19 Nov 2026, 14:23 GMT

Official UK procurement notice

Provision of UPS - MEICA-UPS-01

Official notice

Authority: BIP SOLUTIONS LIMITED

GoodsOther - Open
Published estimate£500,000exc. VAT
Submission deadline 25 Nov 202614:55 GMT · 5 days left
Notice summaryFrom the published notice

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green. Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable. Each UPS shall provide an output fault current of 987 A for 200 ms.

What is being bought

Published requirement description

The Subcontractor shall design, manufacture, supply, deliver, test and commission 4 No. complete UPS systems: 1 No. at Stoneleigh, 1 No. at Canley Brook and 2 No. at Burton Green.

  1. Technical Requirements

Each UPS shall be rated at 210 kVA, 400 V, with 4 x 60 kW power modules and N+1 hot-swappable architecture. The Subcontractor shall demonstrate that the required connected load remains supported with one power module unavailable.

Requirement Stoneleigh Canley Brook Burton Green

Battery sizing load 35 kW 17 kW 70 kW

Connected design load 31 kW TBC 66 kW

Protection breaker 100 A 100 A 250 A

Separate static switch N/A N/A 400 A, 400 V

Each UPS shall provide an output fault current of 987 A for 200 ms. Supplier submissions shall demonstrate compatibility with the project protection requirements.

  1. Batteries

Provide complete VRLA battery systems, including racks/enclosures, interconnections, isolation and protection, delivering 90 minutes' autonomy at the specified battery sizing load. Batteries shall recharge to 95% within 900 minutes. Submit sizing and recharge calculations.

  1. Transformers and Ancillary Equipment

Provide 250 kVA, 1:1, Dzn0 input and output isolation transformers, together with ATS, static switching and external maintenance bypass arrangements required by the approved site-specific drawings. ATS shall be 400 A, four-pole where indicated.

Include all interconnecting cables, battery cables, protective devices and terminations identified as the UPS supplier's responsibility. Coordinate interfaces with incoming supplies and UPS switchboards.

  1. Monitoring

Provide BMS interfaces for battery DC voltage, charge percentage, battery alarms/faults and charger status/alarms. Include communications protocols, interface hardware and point schedules for the UPS, ATS and UPS switchboard, with interface testing.

  1. Delivery and Coordination

Scheduled UPS cabinet dimensions are 1,200 W x 1,996 H x 1,100 D mm. Confirm complete equipment footprints, weights, clearances and delivery requirements before manufacture.

  1. Testing and Handover

Include FAT, commissioning, SAT and resistive load bank testing, with all temporary equipment, connections and removal. Demonstrate capacity, autonomy, recharge, redundancy, transfer/bypass operation, alarms and communications. Provide evidence of fault-current performance.

Submit equipment drawings, schematics, protection data, test procedures/results, commissioning records, as-built information and O&M manuals.

Suppliers shall identify proposed equipment and deviations. Confirm the missing Canley Brook design load, whether Burton Green loads apply per UPS, and site-specific equipment quantities and supply boundaries before manufacture.

Additional information: Please review attached schematic and narrative specification.

CPV: Electrical installations for railways · Special-purpose electrical goods

More open work like this

Other notices open now · live search, filters set

What it takes to win
i

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • Turnover usually expected at this size: about £1,000,000 (twice the annual value).

Turnover is an indicative market norm (≈2× annual value), not a published condition.

Procedure terms & legal framework

From the official record
Procedure method
Other - Open
Procurement category
Goods
Notice status
Open for tender
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
19 Nov 2026, 14:23 GMT
Last source update
19 Nov 2026, 14:23 GMT
Authority reference
C4N123459269
Classification (CPV)
Electrical installations for railwaysSpecial-purpose electrical goods
Delivery area
West Midlands
Official registry OCID
ocds-b5fd17-8724de8a-4519-4688-9186-05770e349d4e Contracts Finder

How to participate & submission route

Official notice
Requests to participate (first stage)
—
Tender submission deadline
25 Nov 2026, 14:55 GMT
Clarification deadline
—

Timeline

19 Nov 2026 → 25 Nov 2026 · 2 dates
  1. Tender notice published8h ago
    19 Nov 2026, 14:23 GMT
  2. Today
    19 Nov 2026
  3. Submission deadlinein 5 days
    25 Nov 2026, 14:55 GMT

Notice history

1 event · 1 release on Contracts Finder
  1. First tender notice published
    19 Nov 2026, 14:23 GMT

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

BIP SOLUTIONS LIMITED

Contracting authority GB-SRS: sid4gov.cabinetoffice.gov.uk/8u5J6V4e 25 Watling Street, London, EC4M9BRContact name, email, phone

Official documents & specifications (2)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeOpportunity notice on Contracts Finder
  • Tender notice tenderTender noticePlease follow this link to view the notice.