Find a TenderPlanned procurementPreliminary market engagement notice
Published 21 Oct 2026, 07:52 BST

Official UK procurement notice

PRO005166 - ORiW - Design and Integration Partner

Authority: United Utilities Water Limited (Public body)

Framework agreementServicesAbove thresholdUtilities
Planned pipeline value£600,000,000pipeline notice, not a live tender
Tender notice expected 5 Nov 2026from the planned procurement notice
Framework period 4 yrsends 31 Mar 2031 · up to 31 Mar 2040 with extensions · starts 1 Apr 2027

What is being bought

Published requirement description

This notice relates to market engagement activity for the provision of certain design and integration services, as explained below. United Utilities Water Ltd (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams;

  • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it.
  • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented.
  • Reduced weather dependent flow, surface water management and management and treatment of highways runoff through the use of nature- based solutions where possible across the catchment.
  • Construction of tunnel and rising mains.
  • Upgrade of an existing wastewater treatment works and discharge point. UU anticipates that the ORiW system and the other strategic wastewater transfer and treatment infrastructure required for the ORiW programme (including the tunnel, rising mains, pumping stations, wastewater treatment facilities, associated drainage works and all ancillary infrastructure), will be promoted through a Development Consent Order (DCO) as a Nationally Significant Infrastructure Project (NSIP), subject to Section 35 approval by Defra. UU will shortly be launching a competitive tendering procedure for the appointment of a Design and Integration Partner (D&IP) who will be responsible for supporting the next phase of this programme, designing the ORiW system, including whole system integration, to achieve the programme vision. UU requires the D&IP to complete feasibility, outline design, constructability and other related activities to obtain the necessary approvals and consents for the programme to proceed to the delivery phase for the preferred solution. Accordingly, the D&IP will also be responsible for the delivery of the DCO and planning approvals. As such, the outline design needs to fully support and integrate with the DCO, Town and Country Planning Act (TCPA) and land acquisition and access processes. At a high level, the initial scope of requirements for the D&IP will include, but may not be limited to the following activities across each of the workstreams of the ORiW system;
  • Outline Design
  • Planning, Consents and Land
  • Environmental Impact Assessments (EIA) and surveys
  • Stakeholder and Customer Engagement
  • Land Agency, Referencing and Surveying
  • Preparation and submission of planning applications and all supporting information
  • Preparation and submission of the DCO and all supporting information
  • Ground Investigation (GI)
  • Early Contractor involvement (ECI)
  • Supporting UU in meeting our reporting requirements with Ofwat UU require a D&IP who has the capability and experience to ensure coordination over integration of all elements of the ORiW system and all other related activities that are required. The D&IP will also need to be capable of leading the overall delivery strategy, managing interfaces across the programme, maintaining design consistency, and ensuring that the complete solution meets the requirements to obtain the necessary approvals and consents. UU is continuing to consider its approach to the delivery phase of the programme and anticipates that it may need ongoing support from the D&IP into the delivery phase to provide continuity throughout the programme lifecycle. The precise form that this ongoing support may take will be dependent on the precise delivery model that UU adopts, but this may include (without limitation):
  • The D&IP acting as system integrator and detailed design partner to either UU and/or any prime contractor engaged in relation to the programme.
  • The D&IP acting as a system integrator partner to provide support across different workstreams and work packages forming part of the programme so that the overall programme is delivered as seamlessly as possible.
  • Providing alternative services to support UU’s client-side management of delivery partners engaged to undertake the delivery phase of the programme. It is also conceivable that the D&IP will not be required to provide any ongoing support during the delivery phase. Anticipated value of each role;
  • Design & Integration Partner (pre delivery phase) > 4 years = circa £60-100m
  • System Integrator Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £100m (subject to CPIH)
  • System Integrator and Detailed Design Partner (during delivery phase) > up to a further 9 years in increments at UUs discretion = circa £500m (subject to CPIH) Please note that the total value is given as a range (£60m to £600m) which includes the minimum and maximum total estimated values across those roles. As explained above, the system integrator partner (during delivery phase) and system integrator and detailed design partner roles are alternatives and so the combined value of each is not included in the total (only the higher of the two). This notice does not constitute a call for competition, and does not commit United Utilities to undertake any future procurement.

CPV: Archaeological services · Architectural, construction, engineering and inspection services · Civil engineering consultancy services · Construction consultancy services · Construction economics services · Construction management services · Construction project management services · Construction-related services · Consultative engineering and construction services · Consulting services for water-supply and waste consultancy · Design consultancy services · Design-modelling services · +31 more

How this framework works

From the published notice
Framework period
4 yrs · up to 13 yrs from 1 Apr 2027

The lotProcurement structure

single lot · no lot value published

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “PRO005166 - ORiW - Design and Integration Partner” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How United Utilities Water Limited buys Systems and technical consultancy services (CPV 7222), and who usually turns up

United Utilities Water Limited’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Systems and technical consultancy services (CPV 7222) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerUnited Utilities Water Limited · all categories
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 44 of 69 known-size awards · market: CPV 7222 · North West England, n=6
64%17%

Small firms have won here. Neither number says whether you qualify; it describes who has been winning.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in North West England.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 37 of 60 known-location awards · market: CPV 7222 · North West England, n=5
62%40%

Most of this buyer’s recorded winners are registered in North West England.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 12 decided notices · market: CPV 7222 · UK-wide, n=11
91 days133 days

Half of these awards were announced within 91 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

Both shares are minimums: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: at least 3 of 21 procurements with awards had no recorded rival · market: CPV 7222 · North West England, n=6
14%67%

Missing bid counts may hide more single-bid awards. This share is a minimum.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer9 lots with bid counts · all categories
0% had one bid
The market33 lots with bid counts · CPV 7222 · UK-wide
0% had one bid
Buyer / market · select a colour for counts
1 bid0% / 0%
Buyer: 0 of 9 lots with published bid counts. Market: 0 of 33 lots with published bid counts.
2–30% / 27%
Buyer: 0 of 9 lots with published bid counts. Market: 9 of 33 lots with published bid counts.
4–678% / 24%
Buyer: 7 of 9 lots with published bid counts. Market: 8 of 33 lots with published bid counts.
7+22% / 48%
Buyer: 2 of 9 lots with published bid counts. Market: 16 of 33 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 722248 monthsPublished estimate£600m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 14 past lots.

A forecast, not a list of bidders.

—No model forecast yet36% single-bid risk
Past bids on 14 similar lots
1 bid36%
5 of 14 similar past lots received 1 bid (36%).
2–329%
4 of 14 similar past lots received 2–3 (29%).
4–629%
4 of 14 similar past lots received 4–6 (29%).
7+7%
1 of 14 similar past lots received 7+ (7%).
Comparable past lots usually drew 3 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

No earlier contract of this buyer matches this lot on the published record.

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

Procedure terms & legal framework

From the official record
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
21 Oct 2026, 07:52 BST
Last source update
21 Oct 2026, 07:52 BST
Authority reference
PRO005166
FTS notice number
2026/S 000-099229
Latest notice
Preliminary market engagement notice (UK2)
Classification (CPV)
Archaeological servicesArchitectural, construction, engineering and inspection servicesCivil engineering consultancy servicesConstruction consultancy servicesConstruction economics servicesConstruction management servicesConstruction project management servicesConstruction-related servicesConsultative engineering and construction servicesConsulting services for water-supply and waste consultancy
+33 moreDesign consultancy servicesDesign-modelling services
Delivery area
North West (UKD)
Official registry OCID
ocds-h6vhtk-078c58 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

21 Oct 2026 → 1 Apr 2027 · 4 dates
  1. Planning notice published1 day ago
    21 Oct 2026, 07:52 BST
  2. Today
    22 Oct 2026
  3. Market engagementin 6 days
    27 Oct 2026, 23:59 GMT

    UU would like to invite interested parties to attend a virtual Programme Launch Event that will be held on Thursday 29 October 13:30- 17:00 via Microsoft Teams, to share further information about the ORiW programme and the D&IP procurement. Please note attendees are restricted to 2 individuals per supplier. If you are interested in this opportunity and would like to attend the event, please complete the information requested in the Microsoft form which can be accessed here- forms.cloud.microsoft/e/mdBFVcDfdB ↗. Please note the deadline to register your interest to attend this event is Tuesday 27 October 2026 at 2pm. UU reserves the right (but does not currently intend) to extend the market engagement activity to encompass other events or activities (including further virtual and in-person sessions as well as written engagement such as surveys and questionnaires) as required. Suppliers should ensure that they have registered using the means, and by the deadline, described above if they wish to be included in any of those further events or activities.

  4. Tender notice expectedin 15 days
    5 Nov 2026, 23:59 GMT
  5. Contract startsin 161 days
    1 Apr 2027

Notice history

1 event · 1 release on Find a Tender
  1. Preliminary market engagement notice published
    21 Oct 2026, 07:52 BST
    UK2

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

United Utilities Water Limited

Contracting authorityPrivate utility GB-PPON: PVVB-5589-BWHX Lingley Mere Business Park, Warrington, North West, WA5 3LPContact email