Operational Property Inspections Framework
Authority: NETWORK RAIL INFRASTRUCTURE LIMITED (Central government)
What is being bought
Published requirement descriptionNetwork Rail intends to procure a framework for the provision of Operational Property Inspection (OPI) services across its estate. The services will include the inspection, assessment, reporting and management of operational property assets to support statutory compliance, asset condition monitoring and maintenance planning. The framework will be delivered by suitably qualified suppliers in accordance with the specification, service requirements and performance standards set out in the procurement documents.
- How the procedure runs: The procurement will comprise a PSQ stage to assess conditions of participation, followed by an ITT stage for shortlisted suppliers
CPV: Building services · Building services consultancy services · Building-inspection services
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 2 suppliers
- Framework period
- 4 yrs · up to 8 yrs from 1 May 2027
Published description of the framework
Prices are determined by the submission of rates during the tender process
The lotProcurement structure
single lot · value publishedLot #1RenewalPublished value£36,000,000
- Economic & financial standing
Suppliers must pass the financial health check
- Technical & professional ability
Suppliers must have the RICCL codes specified in the Instructions to Participants document by the time of award
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 50%
- Commercial: 50%
Published award criteria (2)
- Technical
- Commercial
- Economic & financial standing
Suppliers must pass the financial health check
- Technical & professional ability
Suppliers must have the RICCL codes specified in the Instructions to Participants document by the time of award
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
- “Operational Property Inspections Framework” is a framework: the contest is a place on its panel, up to 2 suppliers, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Competition analysis · published record, not a forecast of who will bid
How NETWORK RAIL INFRASTRUCTURE LIMITED buys Consultative engineering and construction services (CPV 7131), and who usually turns up
NETWORK RAIL INFRASTRUCTURE LIMITED’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Consultative engineering and construction services (CPV 7131) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
How often small and medium firms win.
Share of awards where the winner’s size is known.
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
How often local firms win similar work.
Winners with a registered address in the delivery region, out of awards with a known address.
Here, local means registered in Greater London (authority’s region).
A local branch does not count if the registered address is elsewhere.
Most of this buyer’s recorded winners are registered outside Greater London.
i
How long buyers here take to decide after bids close.
Middle value in days from the deadline to the first award notice, on competitions that published both dates.
Only decided tenders count, so slow ones still waiting are not in.
Half of these awards were announced within 159 days of the bid deadline.
i
How often work is awarded with no recorded rival.
Direct awards and tenders where every published lot count shows one bid.
The market share is a minimum: some awards have no bid count.
Thin markets produce this too; it is not proof of a tailored specification.
Missing bid counts may hide more single-bid awards. This share is a minimum.
How many bids did past lots attract?
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid0% / 2%
2–333% / 16%
4–667% / 31%
7+0% / 51%
How did awards compare with estimates?
i
Where winning prices landed against estimates.
Each colour shows awards below, close to or above the published estimate, one lot at a time.
On a framework or DPS, prices are agreed when work is called off.
Past prices are a guide, not a bid price.
Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.
Assess each lot i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1CPV 7131Published estimate£36m
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 45 past lots.
A forecast, not a list of bidders.
1 bid2%
2–316%
4–631%
7+51%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
| Supplier | This buyer’s earlier contract | Lot | Award value | Match |
|---|---|---|---|---|
| Pole StarEarlier contract | Operational Property Inspectionsstarted Oct 2026 | NR1 Goods and or Non Construction Services Contract | £240k | 57% match |
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
No supplier with a record in this category fits this lot yet.
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
- Forecasts are labelled. The price forecast and its range, possible competitors and the match score are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.
What this replaces i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
74% title match.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
74% title match.
A past supplier may not bid again.
The prior contract this notice most likely re-tenders · matched by title and category (74% title match), the holder is not guaranteed to re-bid
Operational Property Inspections — held by Pole Star; no contract end date published.
Procedure terms & legal framework
From the official record- Procedure method
- Competitive flexible procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Open admission
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Framework agreement
- Who may use the vehicle
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 13 Oct 2026, 14:28 BST
- Last source update
- 13 Oct 2026, 14:28 BST
- Award evaluation window
- Submission end – 23 Apr 2027
- FTS notice number
2026/S 000-096594- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0786a8Find a Tender- Contract terms summary
Please refer to the payment clause inserted into the draft framework agreement
- How it runs
The procurement will comprise a PSQ stage to assess conditions of participation, followed by an ITT stage for shortlisted suppliers
- Risks
Please note Network Rail is not guaranteeing any forecasts provided
How to participate & submission route
Official notice Apply via Jaggaer- Requests to participate (first stage)
- —
- Appointment period ends
- 12 Nov 2026, 12:00 GMT
- Clarification deadline
- 6 Nov 2026, 12:00 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
networkrail.bravosolution.co.uk/web/login.html ↗
project_47278 - Operational Property Inspections Framework
Timeline
13 Oct 2026 → 1 May 2027 · 5 dates- Tender notice published1 day ago13 Oct 2026, 14:28 BST
- Today14 Oct 2026
- Clarification questions byin 23 days6 Nov 2026, 12:00 GMT
- Admission / appointment period endsin 29 days · period end, not a bid countdown12 Nov 2026, 12:00 GMT
- Award decision expected byin 192 days23 Apr 2027, 23:59 BST
- Contract startsin 199 days1 May 2027, 00:00 BST
Notice history
1 event · 1 release on Find a Tender- Tender notice published13 Oct 2026, 14:28 BSTUK4
Commercial outcome & contract awards
Nothing awarded yet- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specificationsAccess: Will be issued in accordance with the Operational Property Inspections Framework Bravo project (project_47278)
Notices published for this procedure
- Tender notice Tender notice on Find a Tender