Official UK procurement notice
Open Framework for Nuclear Technical Services
Authority: United Kingdom National Nuclear Laboratory (Public body)·Consortium: 2 public authorities
What is being bought10 lots · detail below
Published requirement descriptionThis notice is to commence the start of the standstill period for the establishment of the Open Framework for Nuclear Technical Services.
UKNNL is establishing an Open Framework to support with the supply of Nuclear Technical Services for the United Kingdom National Nuclear Laboratory.
The framework will run from September 2026 until September 2030 with the option to extend the framework by a further 4 years, until July 2034.
The Framework will reopen once within the first 3-year period, and UKNNL will open it again at least once in the remaining 5-year contract term as required under Regulation 49 of the Procurement Act 2023.
UKNNL may opt to open the framework for applications earlier than required, although not likely to be ever more than two times per year.
Re-opening may be in relation to the framework agreement in its entirety or in relation to specific lots. Earlier re-opening could be triggered by a range of factors, which may include but are not limited to: Supply & demand changes, Changes to requirements, Changes to framework lotting structure, Changes to rate card structures, Changes to qualitative assessment, Changes to framework management, Addition of new framework lots, Changes to demand, volumes, values and geographical coverage.
Suppliers are permitted to amend their technical and commercial response at each re-opening or can choose to allow their previous submission to be considered.
The framework has the ability to award contracts through mini competition or direct award. Call-off contracts can be either fixed cost or cost reimbursable.
Mini-Competition
Where mini-competition is used, this is to be via the e-tender portal and must include all suppliers on the applicable lot. Each mini competition will be restricted to only one Lot. At mini-competition, suppliers can be asked to re-price and may offer discounted rates if they choose to, but may not charge more than the pricing which was submitted at the latest round of framework qualification. Should requirements at call-off not have been priced at point of framework creation, mini-competition should be held allowing all suppliers in the applicable Lot to price, accordingly, providing the additional requirement fits within the overall subject matter of the applicable Lot. Mini-competition criteria must not repeat qualification questions. The evaluation criteria must however comprise of the following, with weighting allowances adhered to:
Evaluation Criteria Range
Pricing 5-90%
Technical 5-90%
Social Value 5-90%
Mini competitions can be ran using both the Open Procedure and the Competitive Flexible Procedure under the Procurement Act 2023, where the call-off is above threshold.
Direct Award
There are two direct award mechanisms under this Framework Agreement:
(1) Direct award to the highest technically ranked supplier.
(2) Direct award using the desktop calculator
Direct award to the highest technically ranked suppliers Admittance to the framework is via a 100% technical evaluation. Framework suppliers will be ranked in order of their tendered technical score. Procurement Leads may direct award to the highest ranked supplier. If the highest ranked supplier is unable to provide the requested role UKNNL will award to the next highest ranked supplier who can provide that role. UKNNL is required to contract with the highest ranked supplier which can provide the required role, unless there is a preexisting relationship with any of the other suppliers on the applicable Framework, which would mean a Direct Award to that supplier is in the public interest. This could be because it offers value for money or a saving in terms of resource, or would cause disproportionate disruption to switch supplier. The decision made to award outside of the ranking structure will only be made where it delivers value for money and maximises public benefit.
Direct award using the Desktop Calculator
This direct award mechanism allows UKNNL to split the evaluation criteria between price and technical, based upon the requirements of each call-off. The desktop calculator will calculate the Most Advantageous Tenderer, taking into account each suppliers Technical Score, and the rate provided for the role being contracted for. Direct award can be used for both a single role and multiple role call-offs. The rates are assessed using the relative pricing equation: (lowest tendered rate / tenders' rate) x percentage weighting applied Where multiple rates on the desktop calculator are used, the rate in the equation will be the average of the rates selected. Once the calculator has ranked the suppliers, the highest ranked supplier should be contacted. Should the supplier be unable to fulfill the roles required, to the required clearance level or in the time-frame required, UKNNL will move down the rankings to the next highest ranked supplier who can fulfill the requirements. The weighting between Price and Technical will be dependent upon the specifics of each call-off but must be within the range set out below.
Evaluation Criteria Range
Pricing 5-95%
Technical 5-95%
CPV: Engineering-related scientific and technical services · Environmental quality control services · Nuclear safety services · Research consultancy services
How this framework works
From the published notice- Type
- Closed framework · open framework scheme (admission reopens)
- Call-offs
- call-offs may be awarded directly or by further competition
- Bids received
- 32 bids on the busiest of 10 lots · 32 suppliers appointed
- Framework period
- 4 yrs · up to 7 yrs 11 mo from 27 Jul 2026
- Scheme runs until
- 27 Jul 2034
Published description of the framework
The framework has the ability to award contracts through mini competition or direct award. Call-off contracts can be either fixed cost or cost reimbursable. Mini-Competition Where mini-competition is used, this is to be via the e-tender portal and must include all suppliers on the applicable lot. Each mini competition will be restricted to only one Lot. At mini-competition, suppliers can be asked to re-price and may offer discounted rates if they choose to, but may not charge more than the pricing which was submitted at the latest round of framework qualification. Should requirements at call-off not have been priced at point of framework creation, mini-competition should be held allowing all suppliers in the applicable Lot to price, accordingly, providing the additional requirement fits within the overall subject matter of the applicable Lot. Mini-competition criteria must not repeat qualification questions. The evaluation criteria must however comprise of the following, with weighting allowances adhered to: Evaluation Criteria Range Pricing 5-90% Technical 5-90% Social Value 5-90% Mini competitions can be ran using both the Open Procedure and the Competitive Flexible Procedure under the Procurement Act 2023, where the call-off is above threshold. Direct Award There are two direct award mechanisms under this Framework Agreement:
- Direct award to the highest technically ranked supplier.
- Direct award using the desktop calculator Direct award to the highest technically ranked suppliers Admittance to the framework is via a 100% technical evaluation. Framework suppliers will be ranked in order of their tendered technical score. Procurement Leads may direct award to the highest ranked supplier. If the highest ranked supplier is unable to provide the requested role UKNNL will award to the next highest ranked supplier who can provide that role. UKNNL is required to contract with the highest ranked supplier which can provide the required role, unless there is a preexisting relationship with any of the other suppliers on the applicable Framework, which would mean a Direct Award to that supplier is in the public interest. This could be because it offers value for money or a saving in terms of resource, or would cause disproportionate disruption to switch supplier. The decision made to award outside of the ranking structure will only be made where it delivers value for money and maximises public benefit. Direct award using the Desktop Calculator This direct award mechanism allows UKNNL to split the evaluation criteria between price and technical, based upon the requirements of each call-off. The desktop calculator will calculate the Most Advantageous Tenderer, taking into account each suppliers Technical Score, and the rate provided for the role being contracted for. Direct award can be used for both a single role and multiple role call-offs. The rates are assessed using the relative pricing equation: (lowest tendered rate / tenders’ rate) x percentage weighting applied Where multiple rates on the desktop calculator are used, the rate in the equation will be the average of the rates selected. Once the calculator has ranked the suppliers, the highest ranked supplier should be contacted. Should the supplier be unable to fulfill the roles required, to the required clearance level or in the timeframe required, UKNNL will move down the rankings to the next highest ranked supplier who can fulfill the requirements. The weighting between Price and Technical will be dependent upon the specifics of each call-off but must be within the range set out below. Evaluation Criteria Range Pricing 5-95% Technical 5-95%
Lots and requirements (10)Procurement structure
10 lots · all with a published value · evaluation weights differ by lotEvery one of these 10 lots carries the same published figure, £10,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Health Physics and Radiological Protection AdvisorAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #2Human FactorsAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #3Radiological & ChemotoxicAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #4Criticality Safety and ShieldingAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #5Nuclear Safety CaseAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #6Fire Safety (Nuclear and Conventional)AwardedRenewalceiling above
The source published no individual description for this lot.
Lot #7EnvironmentalAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #8Quality and AssuranceAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #9SecurityAwardedRenewalceiling above
The source published no individual description for this lot.
Lot #10Multi-Disciplinary LotAwardedRenewalceiling above
The source published no individual description for this lot.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lots publish different evaluation splits; there is no single procedure weighting.
- “Open Framework for Nuclear Technical Services” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Cancelled
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Open framework scheme
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 8 May 2026, 15:31 BST
- Last source update
- 18 Aug 2026, 12:41 BST
- Award evaluation window
- Submission end – 6 Jul 2026
- Authority reference
NNLC631F- FTS notice number
2026/S 000-042640- Latest notice
- Procurement termination notice (UK12)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0694f1Find a Tender
- Earlier procedure Open Framework for Nuclear Technical Services
How it was run
Official notice- Appointment period ends
- 17 Jun 2026, 13:00 BST
- Clarification deadline
- 12 Jun 2026, 13:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
8 May 2026 → 18 Aug 2026 · 7 dates- Tender notice published165 days ago8 May 2026, 15:31 BST
- Clarification questions by130 days ago12 Jun 2026, 13:00 BST
- Admission / appointment period ends125 days ago · period end, not a bid countdown17 Jun 2026, 13:00 BST
- Award decision expected by105 days ago6 Jul 2026, 23:59 BST
- Contract starts85 days ago27 Jul 2026
- Assessment summaries sent82 days ago30 Jul 2026, 00:00 BST
- Latest notice published63 days ago18 Aug 2026, 12:41 BST
Notice history
8 events · 4 releases on Find a Tender · since 8 May 2026- Tender notice published8 May 2026, 15:31 BSTUK4
- Tender notice published10 Jun 2026, 10:01 BSTUK4
- Deadline moved to 17 Jun 2026, 13:00 BST10 Jun 2026, 10:01 BST+7 days · was 10 Jun 2026, 13:00 BST
- Contract award notice published30 Jul 2026, 18:37 BSTUK6
- Status changed to complete30 Jul 2026, 18:37 BST
- Buyer details updated30 Jul 2026, 18:37 BST
- Contract signature expected13 Aug 2026, 23:59 BSTscheduled
- Procurement termination notice published18 Aug 2026, 12:41 BSTUK12
Published amendments (1)
Extension to the tender deadline.
Routine re-releases (4)
- 2026-05: 1 release · 8 May 2026
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast£12,000,000 inc. VAT is the framework's published maximum, restated by the publisher on 10 award rows. It is one ceiling, not 10 separate sums, and no share per lot is published; those rows read “ceiling above”.
| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Health Physics and Radiological Protection Advisor1 award | |||
| Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Cyclife UK, Mott MacDonald, NSG Environmental Ltd, Nuvia Limited1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: The open framework maybe taken to a maximum term of 8 years. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 2 · Human Factors1 award | |||
| Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, Assystem Energy and Infrastructure, Frazer-Nash Consultancy Limited, IHF LtdSME, Mott MacDonald +4 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Open framework maybe taken to the maximum term of 8 years. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 3 · Radiological & Chemotoxic1 award | |||
| AFRY Solutions UK LimitedSME, Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, Nuvia Limited, Orano Limited, Risktec Ltd.SME +4 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework maybe extended to maximum period of 8 years. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 4 · Criticality Safety and Shielding1 award | |||
| Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, CERBERUS NUCLEAR LIMITEDSME, International Nuclear Services, Stantec UK Limited, TUV SUD LIMITED1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework maybe taken to full 8 year term. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 5 · Nuclear Safety Case1 award | |||
| Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Cavendish Nuclear Limited, Orano Limited, TUV SUD LIMITED +1 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework may be extended to the maximum 8 years. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 6 · Fire Safety (Nuclear and Conventional)1 award | |||
| Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Frazer-Nash Consultancy Limited, MMI Engineering Limited (Trading as Thornton Tomasetti)SME, Nuvia Limited, Risktec Ltd.SME +2 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework may be extended to the maximum 8 year term. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 7 · Environmental1 award | |||
| AFRY Solutions UK LimitedSME, COLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDSME, Cyclife UK, INTERASME, Mott MacDonald, NSG Environmental Ltd +7 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework may be taken to the maximum 8 year term. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 8 · Quality and Assurance1 award | |||
| Amentum Clean Energy LtdVCSE, Cyclife UK, Frazer-Nash Consultancy Limited, NUCLEAR CONSULTING LIMITEDSME, Nuvia Limited, RT ConsultingSME +4 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework can be extended up to maximum term of 8 years. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 9 · Security1 award | |||
| Amentum Clean Energy LtdVCSE, Frazer-Nash Consultancy Limited, HOLTEC BRITAIN LIMITEDSME, MMI Engineering Limited (Trading as Thornton Tomasetti)SME, NUCLEAR CONSULTING LIMITEDSME, PA CONSULTING SERVICES LTD +5 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework can be extended for the maximum 8 year period. | ceiling above | 29 Jul 2026 | Awarded |
| Lot 10 · Multi-Disciplinary Lot1 award | |||
| CERBERUS NUCLEAR LIMITEDSME, COLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDSME, HOLTEC BRITAIN LIMITEDSME, NAVAL SOLUTIONS LTDSME, NSG Environmental Ltd, NUCLEAR CONSULTING LIMITEDSME +26 more1 Sept 2026 – 31 Aug 2030 · up to 31 Aug 2034Extensions: Framework can be extended to maximum 8 year term. | ceiling above | 29 Jul 2026 | Awarded |
Contracts
Contract 1 · Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Cyclife UK, Mott MacDonald, NSG Environmental Ltd, Nuvia Limited
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 10 · CERBERUS NUCLEAR LIMITEDSME, COLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDSME, HOLTEC BRITAIN LIMITEDSME, NAVAL SOLUTIONS LTDSME, NSG Environmental Ltd, NUCLEAR CONSULTING LIMITEDSME +26 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jun 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 2 · Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, Assystem Energy and Infrastructure, Frazer-Nash Consultancy Limited, IHF LtdSME, Mott MacDonald +4 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 3 · AFRY Solutions UK LimitedSME, Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, Nuvia Limited, Orano Limited, Risktec Ltd.SME +4 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 4 · Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, CERBERUS NUCLEAR LIMITEDSME, International Nuclear Services, Stantec UK Limited, TUV SUD LIMITED
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 5 · Abbott Risk Consulting LtdSME, Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Cavendish Nuclear Limited, Orano Limited, TUV SUD LIMITED +1 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 6 · Amentum Clean Energy LtdVCSE, AtkinsRéalis UK Ltd, Frazer-Nash Consultancy Limited, MMI Engineering Limited (Trading as Thornton Tomasetti)SME, Nuvia Limited, Risktec Ltd.SME +2 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 7 · AFRY Solutions UK LimitedSME, COLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDSME, Cyclife UK, INTERASME, Mott MacDonald, NSG Environmental Ltd +7 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 8 · Amentum Clean Energy LtdVCSE, Cyclife UK, Frazer-Nash Consultancy Limited, NUCLEAR CONSULTING LIMITEDSME, Nuvia Limited, RT ConsultingSME +4 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Contract 9 · Amentum Clean Energy LtdVCSE, Frazer-Nash Consultancy Limited, HOLTEC BRITAIN LIMITEDSME, MMI Engineering Limited (Trading as Thornton Tomasetti)SME, NUCLEAR CONSULTING LIMITEDSME, PA CONSULTING SERVICES LTD +5 more
- Signed
- date not published
- Value
- —
- Period
- … – 27 Jul 2030
- Status
- cancelled (17 Aug 2026), UKNNL has decided to discontinue the current procurement exercise following a review of the procurement approach and associated requirements. Having considered the available options, it was determined that it is in UKNNL's best interests not to proceed with the current tender process and to undertake a revised procurement exercise. UKNNL intends to undertake a full review of the tender package and readvertise the opportunity later in 2026.
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Health Physics and Radiological Protection Advisor | 7final-stage tenders | 1 | 0 | — |
| 2 · Human Factors | 16final-stage tenders | 7 | 0 | — |
| 3 · Radiological & Chemotoxic | 12final-stage tenders | 5 | 0 | — |
| 4 · Criticality Safety and Shielding | 8final-stage tenders | 3 | 0 | — |
| 5 · Nuclear Safety Case | 21final-stage tenders | 9 | 0 | — |
| 6 · Fire Safety (Nuclear and Conventional) | 10final-stage tenders | 4 | 0 | — |
| 7 · Environmental | 14final-stage tenders | 5 | 0 | — |
| 8 · Quality and Assurance | 12final-stage tenders | 6 | 0 | — |
| 9 · Security | 16final-stage tenders | 10 | 0 | — |
| 10 · Multi-Disciplinary Lot | 32final-stage tenders | 16 | 0 | — |
Who bid
- wonAMENTUM CLEAN ENERGY LIMITED · North West England · all lots
- wonAtkinsRéalis · South East England · all lots
- wonCYCLIFE UK LTD · North West England · 1, 7, 8, 10
- wonMOTT MACDONALD LIMITED · Greater London · 1, 2, 7, 10
- wonNSG ENVIRONMENTAL LIMITED · North West England · 1, 7, 10
- wonNUVIA LIMITED · North West England · 1, 3, 6, 7, 8, 10, 2, 5
- wonABBOTT RISK CONSULTING LIMITEDSME · Scotland · 2, 3, 5, 7, 10
- wonASSYSTEM ENERGY & INFRASTRUCTURE LIMITED · North West England · 2, 10, 5
- wonFRAZER-NASH CONSULTANCY LIMITED · South East England · 2, 6, 8, 9, 10, 5
- wonIHF LIMITEDSME · Scotland · 2, 10
- wonNAVAL SOLUTIONS LTDSME · South West England · 2, 10, 5, 6
- wonSTANTEC UK LIMITED · North West England · 2, 3, 4, 6, 7, 10, 5
- wonTETRA TECH CONSULTING LIMITED · South East England · 2, 3, 5, 6, 10
- wonAFRY SOLUTIONS UK LIMITEDSME · North West England · 3, 7, 10, 5
- wonORANO LIMITED · South East England · 3, 5, 10
- wonRISKTEC SOLUTIONS LIMITEDSME · North West England · 3, 6, 9, 10, 1, 2, 5
- wonTUV SUD LIMITED · Scotland · 3, 4, 5, 7, 8, 10, 2, 9
- wonCERBERUS NUCLEAR LIMITEDSME · North West England · 4, 10
- wonInternational Nuclear Services Limited · North West England · 4, 9
- wonCAVENDISH NUCLEAR LIMITED · Greater London · 5, 10
- wonTHORNTON TOMASETTI WARRINGTON LIMITEDSME · North West England · 6, 9, 10
- wonCOLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDSME · South East England · 7, 10
- wonINTERA GEOSCIENCES UK LIMITEDSME · East Midlands · 7, 10
- did not winSOCOTEC UK LIMITED · East Midlands · 7, 10
- wonNUCLEAR CONSULTING LIMITEDSME · South East England · 8, 9, 10, 2, 5
- wonREAL-TIME CONSULTANTS LIMITEDSME · West Midlands · 8, 10, 9
- wonSIRIUS ANALYSIS LIMITEDSME · South East England · 8, 9, 10
- did not winVULCAIN ENGINEERING LTDSME · South West England · 8, 10
- did not winADVENT IM LIMITEDSME · West Midlands · 9, 10
- wonHOLTEC BRITAIN LIMITEDSME · Greater London · 9, 10
- wonPA CONSULTING SERVICES LIMITED · Greater London · 9, 10
- wonUBIQUE RISK MANAGEMENT LIMITEDSME · North West England · 9, 10
- wonInternational Nuclear Services Limited · North West England · 10
- did not winHARDIUM LTDSME · North East England · 2, 3, 5
- did not winOCCAM GROUP LTDSME · South West England · 2, 5, 6, 9
- did not winCPC PROJECT SERVICES LIMITEDSME · Greater London · 3, 5, 9
- did not winOXFORD SIGMA LIMITEDSME · West Midlands · 4, 5
- did not winSIMPACT ENGINEERING LIMITEDSME · West Midlands · 4
- did not winGATTACA PROJECTS LIMITED · South East England · 5
- did not winNCC Group Security Services Limited · North West England · 5
- did not winCOALESCE MANAGEMENT CONSULTING LIMITEDSME · North West England · 7, 8
- did not winSHIRLEY PARSONS LIMITEDSME · South East England · 8
Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.
Contracting authority & participating public bodies
2 public bodies on the noticeConsortium members and other public bodies
- United Kingdom National Nuclear LaboratoryContracting authorityPublic authority - sub-central government
Framework contractors & participating bidders
42 commercial parties on the notice · 33 awarded- ABBOTT RISK CONSULTING LIMITEDFramework contractor
- ADVENT IM LIMITEDFramework contractor
- AFRY SOLUTIONS UK LIMITEDFramework contractor
- AMENTUM CLEAN ENERGY LIMITEDFramework contractor
- ASSYSTEM ENERGY & INFRASTRUCTURE LIMITEDFramework contractor
- AtkinsRéalisFramework contractor
- CAVENDISH NUCLEAR LIMITEDFramework contractor
- CERBERUS NUCLEAR LIMITEDFramework contractor
- COALESCE MANAGEMENT CONSULTING LIMITEDBidder / tenderer
- COLLABORATIVE ENVIRONMENTAL ADVISERS (CEA) LIMITEDFramework contractor
Show 32 more suppliers
- CPC PROJECT SERVICES LIMITEDBidder / tenderer
- CYCLIFE UK LTDFramework contractor
- FRAZER-NASH CONSULTANCY LIMITEDFramework contractor
- GATTACA PROJECTS LIMITEDBidder / tenderer
- HARDIUM LTDBidder / tenderer
- HOLTEC BRITAIN LIMITEDFramework contractor
- IHF LIMITEDFramework contractor
- INTERA GEOSCIENCES UK LIMITEDFramework contractor
- International Nuclear Services LimitedFramework contractor
- International Nuclear Services LimitedFramework contractor
- MOTT MACDONALD LIMITEDFramework contractor
- NAVAL SOLUTIONS LTDFramework contractor
- NCC Group Security Services LimitedBidder / tenderer
- NSG ENVIRONMENTAL LIMITEDFramework contractor
- NUCLEAR CONSULTING LIMITEDFramework contractor
- NUVIA LIMITEDFramework contractor
- OCCAM GROUP LTDBidder / tenderer
- ORANO LIMITEDFramework contractor
- OXFORD SIGMA LIMITEDBidder / tenderer
- PA CONSULTING SERVICES LIMITEDFramework contractor
- REAL-TIME CONSULTANTS LIMITEDFramework contractor
- RISKTEC SOLUTIONS LIMITEDFramework contractor
- SHIRLEY PARSONS LIMITEDBidder / tenderer
- SIMPACT ENGINEERING LIMITEDBidder / tenderer
- SIRIUS ANALYSIS LIMITEDFramework contractor
- SOCOTEC UK LIMITEDFramework contractor
- STANTEC UK LIMITEDFramework contractor
- TETRA TECH CONSULTING LIMITEDFramework contractor
- THORNTON TOMASETTI WARRINGTON LIMITEDFramework contractor
- TUV SUD LIMITEDFramework contractor
- UBIQUE RISK MANAGEMENT LIMITEDFramework contractor
- VULCAIN ENGINEERING LTDFramework contractor
Official documents & specifications (13)
Official links; attachments are not copiedNotices published for this procedure
- Procurement termination notice Procurement termination notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
Show 5 more notices
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender