Find a TenderClosed
Published 26 Jul 2023, 15:53 BST

Official UK procurement notice

NJORD PQQ Contract Notice

Official notice

Authority: Ministry of Defence (Central government)

GoodsRestricted procedure
Budget not disclosedValue not published
Submissions closed 25 Aug 2023

What is being bought

Published requirement description

Notification of NJORD PQQ

CPV: Air defence radar

The lotProcurement structure

single lot · no lot value published
Lot #1The UK Government has set its ambition to deliver 50Gw of green energy by 2030…

The UK Government has set its ambition to deliver 50Gw of green energy by 2030 delivered by numerous offshore windfarms that shall be built and commissioned during a rolling programme of works from 2025 and beyond. The fleet of UK Air Defence (AD) Radars are installed strategically around the UK and provide the Recognised Air Picture (RAP) enabling UK air defence system to identify non-cooperative targets within the UK area of interest, enabling the Quick Reaction Alert (QRA) in support to National Security Objective 1 (NSO1).

Each of the future offshore windfarms will have a unique, detrimental impact upon the RAP as they will reduce the volume of air space that the AD radars can effectively survey, reducing the MOD’s ability to deliver its tasks under NSO1.

Programme NJORD (herein referred to as NJORD) has been established in response to a need for capabilities that will mitigate the negative impact introduced by offshore windfarms and maintain, the RAP at its full capability as established prior to the introduction of offshore windfarms. NJORD is an RAF programme with the procurement activity and contract management, through life for the capability / capabilities, being managed by the Air Defence and Electronic Warfare Systems (ADEWS) Delivery Team (DT) within Defence Equipment & Support as the RAF’s delivery agent. To achieve this, NJORD shall focus on ensuring the continued Primary Surveillance capability currently provided by the RAF’s air defence remote radar heads which would otherwise be degraded by offshore windfarms. The capability may be comprised of an asset or assets that mitigate individual windfarms or numerous assets that comprise a system of mitigations.

The anticipated potential solutions for the procurement include but are not limited to the following.

  • TAO 1 – Replace the current AD radar fleet.
  • TAO 2 - Gap Fill Radar / Supplementary Radar.
  • TAO 3 - Adjunct System / Modification to AD radar fleet.
  • TAO 4 - Unmanned Air Vehicle (UAV)s.
  • TAO 5 - Low orbit satellite technology.
  • TAO 6 - Optical Trackers.

This Contract Notice is notification of the PQQ release for this opportunity.

The intention is to set up a framework for mitigation solutions that will be procured through a series of call-off competitions including trial demonstrations.

Should your Organisation wish to participate please use the following link: contracts.mod.uk/go/7978799001899229581D ↗

Deadline for PQQ submissions is 25/08/2023

Delivery: UK
Variant bids: not allowed

Procedure terms & legal framework

From the official record
Procedure method
Restricted procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Goods
Notice status
Closed
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
No (one-off requirement)
First published
26 Jul 2023, 15:53 BST
Last source update
26 Jul 2023, 15:53 BST
FTS notice number
2023/S 000-021695
Classification (CPV)
Air defence radar
Delivery area
UK
Official registry OCID
ocds-h6vhtk-03ea96 Find a Tender

How it was run

Official notice
Run through: Defence Sourcing Portal · Who buys & how to bid on MOD DSP
Supplier login requiredLanguage: EN
Access & registration note: Free · registration requires an NCAGE code — obtain in advance · before you can bid: NCAGE
Submission deadline
25 Aug 2023
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

26 Jul 2023 → 25 Aug 2023 · 2 dates
  1. Notice published
    26 Jul 2023, 15:53 BST
  2. Submission deadline
    25 Aug 2023

Contracting authority & participating public bodies

Ministry of Defence

Contracting authorityCentral GovernmentMinistry or any other national or federal authority, including their regional or local subdivisionsDefence Bristol, UKContact email Published organisation website ↗

Dispute resolution & review bodies

  • DE&SReview body Bristol

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.