Official UK procurement notice
NHS Tayside Laundry Replacement
Authority:
Loading tender notice…
Official UK procurement notice
Authority:
The product for replacement under this procurement is the existing Wash Line within the NHS Tayside Laundry, based at Ninewells Hospital, Dundee.
The various pieces of equipment have exceeded the end of their recommended life expectancy and are now due for replacement.
The requirement will be tendered as a single lot, to include:
The Contract is required to be let for both the Supply of the replacement Laundry Wash Line and the installation on a “turnkey” basis with the successful bidder being appointed on a Prime Contractor basis with overall responsibility for the fulfilment of the Contract.
The ongoing maintenance of this equipment is also included within the scope of the tender.
CPV: Installation services of laundry washing, dry-cleaning and drying machines · Laundry washing, dry-cleaning and drying machines
The product for replacement under this contract for NHS Tayside is as follows:
Single Lot: Laundry Wash Line Replacement, to include
An award will be made to a single successful Contractor who will act in the role of Prime Contractor for the supply and installation of the equipment. The successful Contractor will be solely responsible for effecting any sub-contracting or collaborative arrangements required for other suppliers to allow the successful Contractor to meet this commitment, including any necessary Turnkey work.
Full warranty and manufacturing service programme to be included for initial two-year period, from date of successful completion testing. Thereafter, the successful Contractor to ensure that there are no barriers or limitations (unless stated in Tender response) that would prevent the NHS Tayside Laundry Staff from undertaking the service and repair of the replacement Wash Line equipment.
Our estimates of bids and price, worked out from past UK awards. Not in the notice.
Calculated on
122 lots are from Procurement Act 2023 notices (bids assessed, middle 3) and 123 from older notices (bids received, middle 3).
3 bids
likely 2 to 4 · 8% chance of a single bid
No past lots in this work. Across all its work: 8 lots, typically 2.5 bids; 3 with a single bid.
20% of these market awards repeated the estimate exactly, so the middle of the market often sits on the line.
At estimate
32% chance exactly on it · likely 2% under to the estimate
No past awards with an estimate in this work. Across all its work: 5 awards, typically 2% over the estimate.
Our matching of earlier contracts and suppliers across the three UK feeds. Not in the notice.
Not a bid list · calculated on
No earlier contract of this buyer matches this work across Find a Tender, Contracts Finder and Public Contracts Scotland.
No earlier contract of this buyer matches this lot on the published record.
Our counts over NHS Tayside’s published record, last 36 months, next to the market; point at a row for its sample.
Calculated on
Includes Find a Tender (6) and Scotland (8). 1 published no procurement route and are left out.
Buyer 6 of 13 procurements · market 41,957
No clear difference11 points apart, within what chance gives on this sample.
Includes Find a Tender (6) and Scotland (8).
Buyer 2 of 14 contracts · market 47,342
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula. Turnover is an indicative market norm (≈2× annual value), not a published condition.
Contracts ending within 12 months · Retender Radar, sector filter set
NPTAY086262026/S 000-100019ocds-h6vhtk-0787b8 Find a TenderThe Authority will notify economic operators who submitted a tender or (where no deselection notification has previously been made) applied to be selected to tender, of its decision to award the Contract agreement which notification will contain among other information, a summary of the reasons why the economic operators was unsuccessful.
The notification will incorporate a ‘standstill period’ of a minimum of 10 clear calendar days (or a minimum of 15 if the communication method used is not electronic) between the date on which the Authority dispatches the notice(s) and the date on which the Authority proposes to conclude the relevant contract agreement.
The bringing of court proceedings against the Authority during the standstill period will automatically continue the prohibition on entering into the contract agreement until the court proceedings are determined, discontinued or disposed of, or the court, by interim order, brings to an end the prohibition.
The remedies that may be awarded by the courts before the contract agreement has been entered into include the setting aside of the decision to award the contract agreement to the winning tenderer(s). The bringing of court proceedings against the Authority after the contract agreement has been entered into will not affect the contract agreement unless grounds for the imposition of special penalties under the Public Contracts (Scotland) Regulations 2015 can be established. Otherwise, the remedies that may be awarded by the courts where the contract agreement has been entered into are limited to the award of damages.
The estimated values referred to in Section II.1.5 and II.2.6 covers the 24 months contract duration (to the end of the warranty period).
The buyer is using PCS-Tender to conduct this ITT exercise. The Project code is 32581. For more information see: www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx ↗
Community benefits are included in this requirement. For more information see: www.gov.scot/policies/public-sect… ↗
A summary of the expected community benefits has been provided as follows:
It is a contract performance condition that the successful contractor supports the delivery and ongoing development of community benefits relevant to the subject matter of this framework agreement.
The successful contractor will be required, during the performance of the contract, to identify, deliver, and report on appropriate community benefits within Scotland.
As an alternative compliant route, the successful contractor may engage with NHS Scotland’s Community Benefits Gateway (CBG).
AND
The contractor must comply with the Fair Work First criteria as set out in the Scottish Government’s guidance and demonstrate ongoing compliance throughout the duration of the contract.
AND
Workers engaged in the delivery of the contract must be paid at least the Real Living Wage, where applicable, for the duration of the contract.
(SC Ref:840613)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | DeadlineTime limit · IV.2.2 | 13 Nov 2026 | 10 Dec 2026 | +27 d |
| — | Bid openingConditions for opening of tenders · IV.2.7 | 13 Nov 2026 | 10 Dec 2026 | +27 d |
Detailed Specification and lack of DWG drawings require additional time for completion of fully detailed bids by suppliers.
Dispute resolution & review bodies
No document links were published on the notice; the tender pack is on the portal.
Ranked by our model of who wins lots like this; none is a confirmed bidder. Not listed: 3 of its top 5 without a strong tie to this lot.
Mostly new suppliersLarger buyers repeat more: context, not a benchmark.
The counts under this question show how many awards have a known supplier size.
Buyer 2 of 4 known-size awards · market 25
Too few to compare2 of 4 for this buyer
Frameworks and DPS are left out. Whole-market view: Machinery for textiles (CPV 4271) →