Find a TenderAdministrative changeContract change notice
Published 17 Apr 2025, 10:19 BST

This notice announces an administrative change to an existing contract or market (a contract change notice). No new tender or admission is opened here; see the linked notices below for the original opportunity.

Official UK procurement notice

NEPO210 Highways Surfacing Works

Official notice

Authority: The Association of North East Councils Limited (Local council)·Consortium: 2 public authorities

Open framework scheme18 lotsWorksOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£500,000,000total for 18 lots · framework ceiling, not attributable revenue
Submissions closed 28 Jul 2025awarded 8 Oct 2025
Awarded to Applebridge Construction Limited +18 more15 awards
Framework period 8 yrsends 31 Oct 2033 · starts 1 Nov 2025

What is being bought18 lots · detail below

Published requirement description

The Association of North East Councils Ltd, trading as the North East Procurement Organisation (NEPO), has established a multi-contractor, multi-lot Framework Agreement for the provision of Highways Surfacing Works.

This Framework provides Contracting Authorities with access to a wide range of Suppliers capable of delivering specialised highways surfacing services. The Framework is structured into 16 lots, designed to cover the diverse requirements of Contracting Authorities across the North East and the wider UK.

The works covered in the Framework have been split into the following lots:

1 Asphaltic Concrete

2 Grouted Macadam

3 Surface Dressing

5 Hot Applied High Friction Surfacing

6 Cold Applied High Friction Surfacing

7 Slurry Seal of Footways

8 Slurry Seal / Micro Asphalt of Carriageways

9 Carriageway in Full Depth Recycling

10 Carriageway Re-tread

11 Captive Shot Blasting - Mechanical Retexturing

12 Hydro blasting - Surface Retexturing

13 Patching

14 Alternative Patching Methods: Hot Applied

15 Alternative Patching Methods: Cold Applied

16 Road Markings

17 Surface Preservation: Penetrative

The scope of works includes, but is not limited to:

Supply and delivery of Highways Surfacing Works.

Execution of works to the required specifications and standards.

Delivery across various locations, in line with the needs of individual Contracting Authorities.

Suppliers appointed to the Framework are required to deliver services in a reliable, cost-effective and compliant manner, ensuring high standards of safety and quality.

The Framework is open for use by all Contracting Authorities nationally, enabling them to procure highways surfacing services efficiently and effectively to meet the needs of their service users.

The value for each lot is determined by dividing the total framework value by the number of lots. Whilst individual lots may exceed their calculated value, the total will not surpass the overall framework value.

This UK7 notice covers the following UK6 notices 2025/S 000-068170, 2025/S 000-068304, 2025/S 000-063545, 2025/S 000-063525. These UK6 notices had to be duplicated due to system issues.

  • The authority expects to re-tender this requirement around 1 May 2028, 23:59 BST.

CPV: Construction, foundation and surface works for highways, roads

How this framework works

From the published notice
Type
Open framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Bids received
9 bids on the busiest of 8 lots · 20 suppliers appointed
Framework period
8 yrs from 1 Nov 2025
Scheme runs until
31 Oct 2033
Buyer regions
UK
Supplier levy on call-offs (max %)

0.50% of call-off value · NEPO operates a contract rebate arrangement whereby Suppliers are asked to repay NEPO a set percentage of each invoice in respect of orders placed by NEPO or any Contracting Authority accessing the Framework. The maximum rebate taken by NEPO against the value of awarded contracts will not exceed 0.5%.

Who may buy through it

The Solution is available for use by NEPO Member Authorities and Associate Members. A list of member organisations is available in the Associate Members section of the NEPO website at: www.nepo.org ↗.

This agreement will also be made available to all current and future NEPO Associate Members. Current Associate Members are listed in the Associate Member section of the NEPO website at: www.nepo.org/associate-members ↗.

NEPO intends to make the resulting agreement available for use by all Contracting Authorities throughout all administrative regions of the UK including but not limited to Government Departments and their Agencies, Non-Departmental Public Bodies, Central Government, NHS Bodies, Local Authorities, Emergency Services, Coastguard Emergency Services, Educational Establishments, Registered Social Landlords and Registered Charities.

A list of permissible users available at: www.nepo.org/associate-membership… ↗.

Published description of the framework

This Framework is accessible to Contracting Authorities via Call-Off Contracts. NEPO has established overarching terms and conditions that define the core principles of the Framework.

When a Contracting Authority with an active Call-Off identifies a need that can be met under the Framework, they will enter into a project-specific Call-Off Contract with the awarded supplier. These project-specific terms and conditions will be developed in agreement between the Contracting Authority and the supplier.

Pricing determined through the tender process and evaluated against predefined award criteria and associated weightings. All tenders were assessed accordingly, and suppliers ranked based on their final evaluation scores.

Pricing submitted as part of the establishment of this Framework will apply to requirements within the North East region only.

For use outside the North East region, participating authorities must conduct a further competition under the terms of the Framework Agreement.

NEPO will conduct an annual pricing review using the BCIS index. Additionally, NEPO may seek pricing from all Framework Suppliers for new items proposed for inclusion in the Framework.

Supplier rankings may be re-evaluated and adjusted during the review points before year 3 and 5 of the Framework term. This re-ranking will consider updated pricing for the upcoming 12 months in conjunction with the original quality scores awarded during the tender process.

Contracting Authorities may establish Call-Off Contracts through either Direct Award (based on ranking) or Further Competition.

In cases of Direct Award, pricing will be based on the tendered rates within the Framework. While suppliers may offer lower rates, they must not exceed the maximum rates set out in the Framework.

All suppliers appointed to a particular lot on the Framework may be invited to participate in Further Competitions. The evaluation criteria for any Further Competition will be specified by the Contracting Authority and included in the competition documentation. Suppliers will be required to submit pricing based on the specific project requirements. While suppliers must not exceed the maximum rates outlined in the Framework, they are encouraged to submit competitive offers below these thresholds where appropriate.

NEPO reserves the right not to procure or award any successive Framework in the Open Framework scheme.

Call-offs published through it10

Notices that name this framework as their framework in the official record, latest 5 of 10. Many call-offs are never published, so this is a floor, not utilisation.

Lots and requirements (18)Procurement structure

18 lots · all with a published value · same evaluation weights on every lot

Every one of these 18 lots carries the same published figure, £33,333,333: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Asphaltic ConcreteAwarded 8 yrsSMEceiling above

Asphaltic Concrete and Asphaltic materials must be supplied in accordance with and comply with National and European Standards, shall be transported and laid in accordance with the requirements of BS 594987:2024.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #2Grouted MacadamAwarded 8 yrsSMEceiling above

Grouted Macadam must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #3Surface DressingAwarded 8 yrsSMEceiling above

Surface dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #4Glass Fibre Reinforced Surface DressingAwarded 8 yrsSMEceiling above

Glass Fibre Reinforced Surface Dressing mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #5Hot Applied High Friction SurfacingAwarded 8 yrsSMEceiling above

Hot Applied High Friction Surfacing must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #6Cold Applied High Friction SurfacingAwarded 8 yrsSMEceiling above

Cold Applied High Friction Surfacing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #7Slurry Seal of FootwaysAwarded 8 yrsSMEceiling above

Slurry Seal of Footways mut be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #8Slurry Seal / Micro Asphalt of CarriagewaysAwarded 8 yrsSMEceiling above

Slurry Seal/ Micro Asphalt of Carriageways must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #9Carriageway in Full Depth RecyclingAwarded 8 yrsSMEceiling above

Carriageway in Full Depth Recycling must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #10Carriageway Re-treadAwarded 8 yrsSMEceiling above

Carrigeway re-tread must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1:Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #11Captive Shot Blasting - Mechanical RetexturingAwarded 8 yrsSMEceiling above

Captive Shot Blasting - Mechanical Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #12Hydro blasting - Surface RetexturingAwarded 8 yrsSMEceiling above

Hydro blasting - Surface Retexturing must be supplied following the process specification: The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #13PatchingAwarded 8 yrsSMEceiling above

Patching must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #14Alternative Patching Methods: Hot AppliedAwarded 8 yrsSMEceiling above

Alternative Patching Methods: Hot Applied must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #15Alternative Patching Methods: Cold AppliedAwarded 8 yrsSMEceiling above

Alternative Patching Methods: Cold Applied must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #16Road MarkingsAwarded 8 yrsSMEceiling above

Road Markings must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 1200 with accompanying Notes for Guidance (MCHW 2) in NG1200, sets out the requirements for these materials.

The following standards must be followed: Design Manual for Roads and Bridges - Volume 8 Section 2. BS EN 1436:2018, which specifies performance requirements for road markings. BS EN 1790:2013 Road marking materials. Pre-formed road markings. BS EN 1824:2020, which outlines requirements for conducting road trials of marking materials. BS EN 1871:2020 - covers physical properties of road marking materials.

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #17Surface Preservation: PenetrativeAwarded 8 yrsSMEceiling above

Surface Preservation: Penetrative must be supplied following the process specification of The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible
Lot #18Surface Preservation: Non PenetrativeAwarded 8 yrsSMEceiling above

Surface Preservation: Non Penetrative must be supplied following the process specification The Manual Of Contract Documents for Highway Works. Volume 1: Specification for Highway Works, Series 900 with accompanying Notes for Guidance (MCHW 2) in NG900, sets out the requirements for these materials.

The following standards must be followed: BS EN 13108 Family of standards for Bituminous mixes, PD 6691 - Guidance on the use of BS EN 13108 Bituminous mixtures. Design Manual for Roads and Bridges - Volume 7. Highway Authorities Product Approval Scheme (HAPAS).

Contract period: 1 Nov 2025 – 31 Oct 2033 (8 yrs)
Delivery: UKEligibility: SME eligible

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 18 lots
Quality: 40%Price: 60%
Published award criteria (2)
  • Price
  • Quality
What this means for your bid
  • Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
  • “NEPO210 Highways Surfacing Works” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Administrative change
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
The Solution is available for use by NEPO Member Authorities and Associate Members. A list of member organisations is available in the Associate Members section of the NEPO website at: www.nepo.org. This agreement will also be made available to all current and future NEPO Associate Members. Current Associate Members are listed in the Associate Member section of the NEPO website at: https://www.nepo.org/associate-members. NEPO intends to make the resulting agreement available for use by all Contracting Authorities throughout all administrative regions of the UK including but not limited to Government Departments and their Agencies, Non-Departmental Public Bodies, Central Government, NHS Bodies, Local Authorities, Emergency Services, Coastguard Emergency Services, Educational Establishments, Registered Social Landlords and Registered Charities. A list of permissible users available at: http://www.nepo.org/associate-membership/permissible-users. · open scheme: new suppliers can join during the term
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Yes · next expected 1 May 2028
First published
17 Apr 2025, 10:19 BST
Last source update
21 May 2026, 15:48 BST
Award evaluation window
Submission end – 8 Oct 2025
Authority reference
NEPO210
FTS notice number
2025/S 000-035747
Latest notice
Contract change notice (UK10)
Classification (CPV)
Construction, foundation and surface works for highways, roads
Delivery area
UK
Official registry OCID
ocds-h6vhtk-05048c Find a Tender

How it was run

Official notice
Run through: OPEN-UK
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free
Appointment period ends
28 Jul 2025, 12:00 BST
Clarification deadline
18 Jul 2025, 17:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)

call-off levy · 0.50% of call-off value · NEPO operates a contract rebate arrangement whereby Suppliers are asked to repay NEPO a set percentage of each invoice in respect of orders placed by NEPO or any Contracting Authority accessing the Framework. The maximum rebate taken by NEPO against the value of awarded contracts will not exceed 0.5%.

Detailed submission instructions & authority contactsFrom official release

All submissions must be via Open www.open-uk.org ↗.

Timeline

17 Apr 2025 → 21 May 2026 · 11 dates
  1. Planning notice published
    17 Apr 2025, 10:19 BST
  2. Market engagement
    7 May 2025, 23:59 BST

    NEPO intend to publish a preliminary market engagement questionnaire via Open e-Tendering system (www.open-uk.org ↗). The questionnaire responses will help NEPO design the framework by providing the level of market interest and provide insight from suppliers on the shaping of the future provision.

    The questionnaire will be made accessible via the Open e-Tendering system on 17 April 2025 with a submission deadline of 16:00 on 7 May 2025.

    Suppliers wishing to access and complete the questionnaire must first register on the e-Tendering system using the following link www.open-uk.org ↗ For guidance on how to create an account or submit your questionnaire response through Open, please visit www.open-hub.org/training ↗ to access the available Training Guides. If you need technical assistance from the Open Support team, this can be requested via [email protected]. PLEASE NOTE: Open is accessible 24/7 however, technical support is available Monday to Thursday 08:30 - 17:00 and Friday 08:30 - 16:30.

    NEPO also intend to hold a meeting via Microsoft Teams on 6 May 2025 between 10:30 - 11:30 am. A presentation will be given and there will be an opportunity to ask questions in the session.

    Suppliers must submit their questionnaire via Open before 16:00 on 2 May 2025, to confirm their attendance at the meeting on 6 May.

    Attendance at the Microsoft Teams meeting is optional and does not provide suppliers with an advantage in any future related procurement. Presentations and Q&A from the session will be published as part of the procurement process.

    Attendance also does not constitute as an intention to tender for any future related procurement.

    Please note the above information may be subject to change.

  3. Next notice expected
    26 Jun 2025, 23:59 BST
  4. Tender notice published
    27 Jun 2025, 12:14 BST
  5. Clarification questions by
    18 Jul 2025, 17:00 BST
  6. Admission / appointment period endsperiod end, not a bid countdown
    28 Jul 2025, 12:00 BST
  7. Assessment summaries sent377 days ago
    8 Oct 2025, 00:00 BST
  8. Award decision expected by376 days ago
    8 Oct 2025, 23:59 BST
  9. Standstill ends364 days ago
    20 Oct 2025, 23:59 BST
  10. Contract starts353 days ago
    1 Nov 2025
  11. Latest notice published152 days ago
    21 May 2026, 15:48 BST

Notice history

13 events · 11 releases on Find a Tender · since 17 Apr 2025
  1. First planning notice published
    17 Apr 2025, 10:19 BST
  2. Status changed to active
    27 Jun 2025, 12:14 BST
  3. Procurement method changed
    27 Jun 2025, 12:14 BST
  4. Deadline published: 28 Jul 2025, 12:00 BST
    27 Jun 2025, 12:14 BST
  5. Buyer details updated
    27 Jun 2025, 12:14 BST
  6. First tender notice published
    27 Jun 2025, 12:14 BST
  7. Status changed to complete
    9 Oct 2025, 09:07 BST
  8. First award notice published
    9 Oct 2025, 09:07 BST
  9. Contract signature expected
    5 Nov 2025, 23:59 GMT
    scheduled
  10. Contract details notice published
    6 Jan 2026, 17:46 GMT
    UK7
  11. Contract details notice published
    19 May 2026, 10:46 BST
    UK7
  12. Contract change notice published
    21 May 2026, 15:48 BST
    UK10
  13. Contract change proposed
    21 May 2026, 23:59 BST
    Company restructure
Published amendments (2)

The submission deadline for the preliminary market engagement questionnaire on Open (within the Engagement process description) has been amended from 2 May 2025 to 7 May 2025.

Addition of wording: NEPO reserves the right not to procure or award any successive Framework in the Open Framework scheme.

Routine re-releases (11)
  • 2025-10: 4 releases · 9 Oct 2025, 24 Oct 2025
  • 2025-07: 1 release · 22 Jul 2025
  • 2025-06: 1 release · 27 Jun 2025
  • 2025-04: 2 releases · 17 Apr 2025, 23 Apr 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 2034 awards · see the list ↓
Bids received 95 from SMEs · busiest of 8 lots
Contracts signed 16latest 1 Nov 2025

£3,333,333 is the framework's published maximum, restated by the publisher on 15 award rows. It is one ceiling, not 15 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Asphaltic Concrete2 awards
Applebridge Construction Limited, DSD Construction LtdSME, HOLCIM UK LIMITED, Hanson Quarry Products Europe Ltd, Hillhouse Quarry Group Ltd, Lane Rental Services LtdSME +3 more1 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Applebridge Construction Limited, DSD Construction Ltd, HOLCIM UK LIMITED, Hanson Quarry Products Europe Ltd, Hillhouse Quarry Group Ltd, Lane Rental Services LtdSME +3 moreLot 1 Asphaltic Concrete5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/productsceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Lot 2 · Grouted Macadam2 awards
Miles Macadam Ltd, Tarmac Trading LimitedLot 2 Grouted Macadam5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Miles Macadam Ltd, Tarmac Trading Limited1 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 3 · Surface Dressing1 award
Eurovia Infrastructure Limited, KIELY BROS LTDLot 3 Surface dressing5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Lot 5 · Hot Applied High Friction Surfacing1 award
JACK COUPE & SONS LIMITEDSME, Jointline LtdSME, KIELY BROS LTD, Premier Roadmarkings LimitedSME, WJ North LimitedSMELot 5 Hot Applied High Friction Surfacing5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Lot 6 · Cold Applied High Friction Surfacing1 award
JACK COUPE & SONS LIMITEDSME, Jointline LtdSME, KIELY BROS LTD, Premier Roadmarkings LimitedSME, WJ North LimitedSMELot 6 Cold Applied High Friction Surfacing5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Lot 7 · Slurry Seal of Footways1 award
Colas Limited, KIELY BROS LTDLot 7 Slurry Seal of Footways5 Nov 2025 – 31 Oct 2033Options: NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/productsceiling above8 Oct 2025standstill to 4 Nov 2025Standstill
Lot 11 · Captive Shot Blasting - Mechanical Retexturing1 award
JACK COUPE & SONS LIMITEDSME, JMS LINCOLN LIMITEDSME, KIELY BROS LTD1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 12 · Hydro blasting - Surface Retexturing1 award
JACK COUPE & SONS LIMITEDSME, JMS LINCOLN LIMITEDSME, KIELY BROS LTD1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 13 · Patching1 award
DSD Construction Ltd, HOLCIM UK LIMITED, Hanson Quarry Products Europe Ltd, Heidelberg Materials UK t/a Hanson Quarry Products Europe Ltd, Hillhouse Quarry Group Ltd, Lane Rental Services LtdSME +3 more1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 14 · Alternative Patching Methods: Hot Applied1 award
WJ North LimitedSME1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 15 · Alternative Patching Methods: Cold Applied1 award
Eurovia Infrastructure Limited, KIELY BROS LTD, Velocity UK LtdSME1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 16 · Road Markings1 award
JACK COUPE & SONS LIMITEDSME, Jointline LtdSME, KIELY BROS LTDSMEVCSE, Premier Roadmarkings LimitedSME, WJ North LimitedSME1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded
Lot 17 · Surface Preservation: Penetrative1 award
Colas Limited, KIELY BROS LTD, Velocity UK LtdSME1 Nov 2025 – 31 Oct 2033Options: The right to additional purchases while the contract is valid. NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5, prior to expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.ceiling above8 Oct 2025Awarded

Contracts

All 14 of these contracts carry the same published figure, £3,333,333, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Contract 1 · Applebridge Construction Limited, DSD Construction LtdSME, HOLCIM UK LIMITED, Hanson Quarry Products Europe Ltd, Hillhouse Quarry Group Ltd, Lane Rental Services LtdSME +3 more

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 10 · JACK COUPE & SONS LIMITEDSME, JMS LINCOLN LIMITEDSME, KIELY BROS LTD

    Signed
    1 Nov 2025
    Value
    £333,333
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products
    • Change proposed 21 May 2026 Company restructure, 1 supplier added · 1 supplier removed
  • Contract 11 · JACK COUPE & SONS LIMITEDSME, JMS LINCOLN LIMITEDSME, KIELY BROS LTD

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
    • Change proposed 21 May 2026 Company restructure, 1 supplier added · 1 supplier removed
  • Contract 12 · DSD Construction Ltd, HOLCIM UK LIMITED, Hanson Quarry Products Europe Ltd, Heidelberg Materials UK t/a Hanson Quarry Products Europe Ltd, Hillhouse Quarry Group Ltd, Lane Rental Services LtdSME +3 more

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 13 · WJ North LimitedSME

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 14 · Eurovia Infrastructure Limited, KIELY BROS LTD, Velocity UK LtdSME

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 15 · JACK COUPE & SONS LIMITEDSME, Jointline LtdSME, KIELY BROS LTDSMEVCSE, Premier Roadmarkings LimitedSME, WJ North LimitedSME

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 16 · Colas Limited, KIELY BROS LTD, Velocity UK LtdSME

    Signed
    1 Nov 2025
    Value
    £333,333
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 2 · Miles Macadam Ltd, Tarmac Trading Limited

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 3

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 4

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products.
  • Contract 5

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products
  • Contract 6

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products
  • Contract 7

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products
  • Contract 8

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products
  • Contract 9

    Signed
    1 Nov 2025
    Value
    ceiling above
    Period
    1 Nov 2025 – 31 Oct 2033
    Status
    active
    Options
    NEPO intends that the Framework period is up to 8 years with readvertisement before year 3 and year 5 prior to the expiry of the Framework term. As such, suppliers which have not been appointed to this Framework will have the opportunity to be appointed to the subsequent framework. During the period of the Framework, NEPO may issue modifications to the lot structure with the introduction of new lots for highway surfacing works which cannot be foreseen at this time for example innovative techniques/products

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
10 · Carriageway Re-tread3final-stage tenders10—
11 · Captive Shot Blasting - Mechanical Retexturing3final-stage tenders20—
12 · Hydro blasting - Surface Retexturing3final-stage tenders20—
13 · Patching9final-stage tenders50—
14 · Alternative Patching Methods: Hot Applied3final-stage tenders30—
15 · Alternative Patching Methods: Cold Applied4final-stage tenders20—
16 · Road Markings5final-stage tenders30—
17 · Surface Preservation: Penetrative4final-stage tenders20—

Contracting authority & participating public bodies

2 public bodies on the notice

THE ASSOCIATION OF NORTH EAST COUNCILS LIMITED

Contracting authorityPublic authority - sub-central government GB-PPON: PYVX-2132-JNMM · GB-COH: 05014821 Northern Design Centre, Gateshead, North East, NE8 3DFContact email

Framework contractors & participating bidders

30 commercial parties on the notice
  • APPLEBRIDGE CONSTRUCTION LIMITEDFramework contractorGB-COH: 08732701GB-PPON: PCXQ-3656-DPBP Hughes House, Middlesbrough, North East, TS3 6AGContact email
  • COLAS LIMITEDFramework contractorGB-COH: 02644726GB-PPON: PPWQ-2718-YQMV 6210 Bishops Court Birmingham Business Park, Birmingham, West Midlands, B37 7YBContact email
  • COLAS LIMITEDFramework contractorGB-PPON: PPWQ-2718-YQMV 6210 Bishops Court Birmingham Business Park, Birmingham, West Midlands, B37 7YBContact email
  • DSD CONSTRUCTION LIMITEDFramework contractorGB-COH: 02818677GB-PPON: PVQR-5139-MJRW Dsd House Dukes Drive, Carlisle, North West, CA6 4SHContact email
  • DSD CONSTRUCTION LIMITEDFramework contractorGB-PPON: PVQR-5139-MJRW Dsd House Dukes Drive, Carlisle, North West, CA6 4SHContact email
  • EUROVIA INFRASTRUCTURE LIMITEDFramework contractorGB-COH: 07388667GB-PPON: PLBZ-5662-WMMQ Albion House, Springfield Road, Horsham,, Horsham, South East, RH12 2RWContact email
  • EUROVIA INFRASTRUCTURE LIMITEDFramework contractorGB-PPON: PLBZ-5662-WMMQ Albion House, Springfield Road, Horsham,, Horsham, South East, RH12 2RWContact email
  • HANSON QUARRY PRODUCTS EUROPE LIMITEDFramework contractorGB-COH: 00300002GB-PPON: PBRH-1354-LQWH Second Floor, Arena Court, Maidenhead, South East, SL6 8QZContact email
  • HANSON QUARRY PRODUCTS EUROPE LIMITEDFramework contractorGB-PPON: PBRH-1354-LQWH Second Floor, Arena Court, Maidenhead, South East, SL6 8QZContact email
  • HILLHOUSE QUARRY GROUP LIMITEDFramework contractorGB-COH: SC135103GB-PPON: PMBN-7987-HDBX Hillhouse Quarry, Ayrshire, Scotland, KA10 7HXContact email
Show 20 more suppliers
  • HOLCIM UK LIMITEDFramework contractorGB-COH: 00245717GB-PPON: PJCZ-7276-HCPY Bardon Hill, Bardon Road, Coalville, East Midlands, LE67 1TLContact email
  • JACK COUPE & SONS LIMITEDFramework contractorGB-COH: 07232512GB-PPON: PNGM-5651-MDJV Jack Coupe & Sons, Shildon, North East, DL4 1HGContact email
  • JACK COUPE & SONS LIMITEDFramework contractorGB-PPON: PNGM-5651-MDJV Jack Coupe & Sons, Shildon, North East, DL4 1HGContact email
  • JMS LINCOLN LIMITEDFramework contractorGB-COH: 06775568GB-PPON: PGBG-7378-HVMX Unit 7 Brock Way,, Newcastle, West Midlands, ST5 6AZContact email
  • JMS LINCOLN LIMITEDFramework contractorGB-PPON: PGBG-7378-HVMX Unit 7 Brock Way,, Newcastle, West Midlands, ST5 6AZContact email
  • JOINTLINE LIMITEDFramework contractorGB-COH: 01878959GB-PPON: PTBP-4834-RQGT Airfield View, Camp Road, Witham St Hughs, Lincoln, East Midlands, LN6 9TWContact email
  • KIELY BROS. LIMITEDFramework contractorGB-COH: 03487871GB-PPON: PLTP-7638-LVWL 135 Cherrywood Road, Birmingham, West Midlands, B9 4XEContact email
  • KIELY BROS. LIMITEDFramework contractorGB-PPON: PLTP-7638-LVWL 135 Cherrywood Road, Birmingham, West Midlands, B9 4XEContact email
  • LANE RENTAL SERVICES LIMITEDFramework contractorGB-COH: 02800789GB-PPON: PPHL-8322-RQGW Highway House Hereford Road, Pocklington York, Yorkshire & Humber, YO42 1NRContact email
  • LANE RENTAL SERVICES LIMITEDFramework contractorGB-PPON: PPHL-8322-RQGW Highway House Hereford Road, Pocklington York, Yorkshire & Humber, YO42 1NRContact email
  • MILES MACADAM LIMITEDFramework contractorGB-COH: 03031039GB-PPON: PJQZ-7558-HVYT Malpas Station, Cheshire, North West, SY14 8LUContact email
  • MILES MACADAM LIMITEDFramework contractorGB-PPON: PJQZ-7558-HVYT Malpas Station, Cheshire, North West, SY14 8LUContact email
  • NORTH EAST SITE SERVICES LIMITEDFramework contractorGB-COH: 09409906GB-PPON: PPRB-2924-ZMJV Longshank Lane, Co. Durham, North East, DH3 1QZContact email
  • NORTH EAST SITE SERVICES LIMITEDFramework contractorGB-PPON: PPRB-2924-ZMJV Longshank Lane, Co. Durham, North East, DH3 1QZContact email
  • PREMIER ROADMARKINGS LIMITEDFramework contractorGB-COH: 08276276GB-PPON: PGNX-9119-TZTX 131 Salters Lane, Stockton-On-Tees, North East, TS21 3EEContact email
  • PREMIER ROADMARKINGS LIMITEDFramework contractorGB-PPON: PGNX-9119-TZTX 131 Salters Lane, Stockton-On-Tees, North East, TS21 3EEContact email
  • RAINTON CONSTRUCTION LIMITEDFramework contractorGB-COH: 02699545GB-PPON: PBRZ-7184-DYPT Davison House Rennys Lane, Durham, North East, DH1 2RSContact email
  • TARMAC TRADING LIMITEDFramework contractorGB-COH: 00453791GB-PPON: PGLC-9451-BRQP Ground Floor T3 Trinity Park, Birmingham, West Midlands, B37 7ESContact email
  • VELOCITY UK LIMITEDFramework contractorGB-COH: 03400231GB-PPON: PQLR-2316-LQZW Woodbine Street, Sunderland, North East, SR1 2NLContact email
  • WJ NORTH LIMITEDFramework contractorGB-COH: 02884681GB-PPON: PTMB-1681-VWYJ Unit 7 Brock Way, Newcastle Under Lyme, West Midlands, ST5 6AZContact email

Official documents & specifications (75)

Official links; attachments are not copied

Notices published for this procedure

  • Contract change notice contractContract change noticeUK10Contract change notice on Find a Tender
  • Contract change notice contractContract change noticeUK10Contract change notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
Show 22 more notices

45 further documents are listed in the JSON mirror.